PANEL,POWER DISTRIB
This is a firm-fixed-price contract for the repair of a Power Distribution Panel, requiring a Repair Turnaround Time (RTAT) of 190 days from the asset's physical receipt at the contractor's facility. The performance location is the contractor's own facility, and Government Source Inspection is required. The contractor must provide a firm quote that includes a complete repair price and a specific price reduction amount per unit per month for any unexcused failure to meet the RTAT. The work must comply with specific military standards and technical documents, and the contractor is responsible for all inspection and quality assurance requirements.