CIRCUIT CARD ASSEMB
This is a firm-fixed-price solicitation for the repair of a Circuit Card Assembly, requiring a 50-day Repair Turnaround Time (RTAT) from the asset's physical receipt at the contractor's facility. Government Source Inspection is required, and the contractor must maintain inspection records for 365 days after final delivery. The performance location is the contractor's own facility, where the asset will be shipped. The contractor must provide a firm repair price that includes all costs for handling potentially damaged or incomplete items. Failure to meet the RTAT will result in specified price reductions per unit for each month of unexcused delay.