TAPE,DUCT
This is a total small business set-aside contract for the supply of repair parts, with a strong emphasis on strict adherence to detailed technical and quality requirements. The contractor must comply with specified document revisions and obtain approval for any deviations, with a particular focus on excluding mercury from hardware. Performance requires access to a password-protected government website for technical documents, and the contractor must provide and maintain an acceptable inspection system. Pricing submitted with a quotation is valid for 60 days, and all work is governed by a fixed-price structure with inspection and acceptance at the destination. The location for performance is not specified in the description.