SCREEN,PERF SHEET
This is a total small business set-aside contract for the supply of repair parts, with performance governed by detailed technical and quality requirements, including the Individual Repair Part Ordering Data (IRPOD). The contractor must provide an acceptable inspection system and comply with a strict order of precedence for technical documents, with the Schedule of Supplies taking priority over other sections. Pricing submitted must be valid for 60 days after the closing date unless otherwise specified. A mandatory review of the IRPOD is required, and all contractual documents are considered issued when deposited in the mail or sent electronically. The place of performance is not specified in the description.