STOP LUG,LUG
The Navy requires manufacture of a STOP LUG, LUG to P/N 6236107-002 (cage 53711), with applicable drawings available through SAM.gov Contract Opportunities. This is a total small business set-aside, and while an FMS designation appears due to system limitations, it is not a true FMS requirement/contract. Government source inspection per FAR 52.246-2 is required, and delivery is required within 90 days. The contractor is responsible for all shipping expenses to the DODAAC location(s) specified in the contract’s Consignment Instruction notes, under FOB destination terms. The item must meet specified marking, configuration control, quality assurance/recordkeeping, and MIL-STD-2073 packaging requirements.