DUST,COVER
This is a contract for the manufacture of a dust cover, with all design and material requirements specified on Drawing 6237595-001. Delivery is required within 90 days of award, and government source inspection is mandatory. The work involves strict adherence to military standards for manufacturing, marking, configuration control, and shelf-life requirements, with items needing at least 85% of their shelf life remaining upon government receipt. The performance location is not specified, and no budget amount is listed.