LATCH, IMU DOLLY
This is a manufacturing contract for a specific part called the LATCH, IMU DOLLY, which must be made from a specified nylon material and conform to detailed military drawings and standards. The delivery timeline is 90 days from award, and government source inspection is required for quality assurance. The performance location is not specified in the provided description. No budget or contract value is detailed in the text provided.