ISOLATOR
This is a manufacturing contract for an "ISOLATOR" that must be built to meet the requirements of Drawing 7128425-2 (53711) Rev B. The item has a strict shelf-life requirement of 60 months (non-extendible) and must be delivered within 90 days. Government source inspection is required, and performance will be subject to numerous military standards for manufacturing, marking, and configuration control. The procurement is set aside for small businesses.