53--WHEEL, GUIDE
This opportunity is a total small business set-aside for the manufacture of a WHEEL, GUIDE for the U.S. Navy. The required delivery timeline is 90 days after contract award, and government source inspection per FAR 52.246-2 is required. The contract is fixed-price with FOB destination terms, and performance of services is not explicitly stated but involves manufacturing. The work involves meeting specific material and physical requirements, including the use of DURETHANE G 2.00 DIA ROD or equivalent, as detailed in the referenced drawings. No budget amount is specified in the description.