BUBBLE WIND FLAT

Notice ID:N0010425QZE21

This opportunity is for the manufacture and supply of a "Bubble Station Window," a critical, special-emphasis component for a crucial shipboard system, with a total small business set-aside. The contractor must comply with strict design, manufacturing, and performance requirements per Navy drawing 8540938, including specific acceptance criteria for interior and exterior defects. A certificate of compliance is required, and all items must be marked per MIL-STD-130, with final delivery of all material due 186 days after contract award. The contract will be DO-rated for national defense under the Defense Priorities and Allocations System, and performance will be at the contractor's facility with FOB destination terms.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE NAVY NAVSUP WEAPON SYSTEMS SUPPORT MECH
  PSC   9340 GLASS FABRICATED MATERIALS


Data sourced from SAM.gov. View Official Posting »

BUBBLE WIND FLAT

Inactive
Notice ID:N0010425QZE21

This is a U.S. Navy procurement for "Bubble Station Windows," which are designated as SPECIAL EMPHASIS material due to their critical role in a shipboard system where failure could result in serious injury, loss of life, or loss of the ship. The final delivery timeline for the material is 186 days. The item must meet specific design and performance requirements per drawing 8540938, including strict visual acceptance criteria for defects. The contractor must submit a detailed Certificate of Compliance with traceability, and all waivers, deviations, and data submissions must be processed through the specified Electronic Contractor Data Submission (ECDS) system.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE NAVY NAVSUP WEAPON SYSTEMS SUPPORT MECH
  PSC   GLASS FABRICATED MATERIALS
LOCATION:

Links ()

Attachments ()


Data sourced from SAM.gov. View Official Posting »

BUBBLE WIND FLAT

Notice ID:N0010425QZE21

This is a U.S. Navy procurement for a "Bubble Station Window," a critical, non-metallic shipboard component designated as SPECIAL EMPHASIS material where failure could result in serious injury, loss of life, or loss of the ship. The final delivery timeline for the material is 186 days. The item must meet specific design and performance requirements per drawing 8540938 and strict acceptance criteria for defects, and the contractor must provide a detailed Certificate of Compliance. Performance location is not specified, and no budget amount is listed.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE NAVY NAVSUP WEAPON SYSTEMS SUPPORT MECH
  PSC   9340 GLASS FABRICATED MATERIALS
LOCATION: Not Given
Primary Contact
Telephone: 7176057574
Not Given


Data sourced from SAM.gov. View Official Posting »