20--SMALL FWD TILE

Notice ID:N0010425QYC53

This is a solicitation for the manufacture of a "SMALL FWD TILE," a towed array cover tile for the Navy, requiring compliance with specific technical drawings and military standards. The contract mandates First Article Testing at the contractor's expense, to be conducted by the government at NSWC Carderock Division, with an estimated testing timeline of 12-18 months, and also requires Production Lot Testing. A valid U.S. Security Clearance of Confidential or higher is required to respond, and the government retains an option to order an additional quantity of up to 100% for 180 days after receipt of order. The evaluation will consider past performance, and the government's approved sources for this material are specifically listed.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE NAVY NAVSUP WEAPON SYSTEMS SUPPORT MECH
  PSC   MISC SHIP & MARINE EQ


Data sourced from SAM.gov. View Official Posting »

20--SMALL FWD TILE

Notice ID:N0010425QYC53

This is a procurement for 50 units of a specialized part that requires engineering source approval from the design control activity to maintain quality. The work must be acquired or repaired only from approved sources who retain essential data rights and manufacturing knowledge. Any alternate source must qualify according to specific procedures approved by the cognizant Government engineering activity. Interested parties can obtain necessary documents online via ASSIST-Quick Search or through the DoD Single Stock Point in Philadelphia, PA. Documents not available for download can be ordered after registering for a DODSSP account.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE NAVY NAVSUP WEAPON SYSTEMS SUPPORT MECH
NAICS Not provided
  PSC   2090 MISC SHIP & MARINE EQ


Data sourced from SAM.gov. View Official Posting »

20--SMALL FWD TILE

Notice ID:N0010425QYC53

This is a solicitation for the manufacture of a "SMALL FWD TILE" (a towed array cover tile) for the Navy, requiring compliance with detailed technical drawings and specifications. The contract requires First Article Testing at the contractor's expense, to be conducted by the government at NSWC Carderock Division, with an estimated testing timeline of 12-18 months, and subsequent Production Lot Testing. A valid U.S. Security Clearance of Confidential or higher is mandatory for offerors, and the government retains an option to order an additional quantity of up to 100% for 180 days after receipt of order. The evaluation factors include past performance, and the estimated budget range for the First Article Testing is between $25,000 and $175,000.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE NAVY NAVSUP WEAPON SYSTEMS SUPPORT MECH
  PSC   MISC SHIP & MARINE EQ


Data sourced from SAM.gov. View Official Posting »