CIRCUIT CARD ASSEMB

Notice ID:N0010425QND06

This is a U.S. Navy requirement for the repair of a specific Circuit Card Assembly, referencing CAGE code 96169 and part number 263512712-0002. The contractor must perform a teardown and evaluation within 120 days of receiving the carcass(es) and then submit a firm-fixed price quote for the full repair. A key requirement is a 78-day Repair Turn Around Time (RTAT) after award, with price reductions applied for failures to meet this timeline. The work involves strict compliance with military standards, including MIL-STD-129 for marking and a prohibition on mercury. Inspection and acceptance locations are listed as "TBD" (To Be Determined).

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE NAVY NAVSUP WEAPON SYSTEMS SUPPORT MECH
  PSC   5998 ELECTRICAL AND ELECTRONIC ASSEMBLIES, BOARDS, CARDS, AND ASSOCIATED HARDWARE


Data sourced from SAM.gov. View Official Posting »

CIRCUIT CARD ASSEMB

Notice ID:N0010425QND06

This is a U.S. Navy requirement for the repair of a specific Circuit Card Assembly, with all work performed in accordance with MIL-STD-129 and other technical documents. The contractor must provide a 120-day teardown and evaluation period after receiving the carcass(es), followed by a Firm-Fixed Price quote for the full repair, which must include a requested Repair Turn Around Time (RTAT) of 78 days. The material must be mercury-free for use on submarines/surface ships. The contract will be DO-certified under the Defense Priorities and Allocations System (DPAS).

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE NAVY NAVSUP WEAPON SYSTEMS SUPPORT MECH
  PSC   5998 ELECTRICAL AND ELECTRONIC ASSEMBLIES, BOARDS, CARDS, AND ASSOCIATED HARDWARE


Data sourced from SAM.gov. View Official Posting »

CIRCUIT CARD ASSEMB

Notice ID:N0010425QND06

This is a U.S. Navy requirement for the repair of a specific Circuit Card Assembly, which must be performed in accordance with MIL-STD-129 and be free from mercury contamination. The contractor must have 120 days after receiving the carcasses to complete a teardown and evaluation and submit a firm-fixed price quote for the full repair. The requested repair turnaround time is 78 days, with price reductions applied per unit if this RTAT is not met. The inspection and acceptance point is listed as "TBD" (To Be Determined). The warranty period is one year from the date of delivery.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE NAVY NAVSUP WEAPON SYSTEMS SUPPORT MECH
  PSC   5998 ELECTRICAL AND ELECTRONIC ASSEMBLIES, BOARDS, CARDS, AND ASSOCIATED HARDWARE


Data sourced from SAM.gov. View Official Posting »

CIRCUIT CARD ASSEMB

Inactive
Notice ID:N0010425QND06

This is a U.S. Navy requirement for the repair of a specific Circuit Card Assembly, which must be performed in accordance with MIL-STD-129 and be free from mercury contamination. The contractor must complete a teardown and evaluation within 120 days of receiving the carcass(es) and then submit a Firm-Fixed Price quote for the full repair. The requested Repair Turn Around Time (RTAT) for completing repairs after award is 78 days, with financial penalties for not meeting this timeline. The performance location is not specified. The budget is not specified.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE NAVY NAVSUP WEAPON SYSTEMS SUPPORT MECH
  PSC   5998 ELECTRICAL AND ELECTRONIC ASSEMBLIES, BOARDS, CARDS, AND ASSOCIATED HARDWARE
LOCATION: Not Given
Primary Contact
Telephone: 7176052982
Not Given


Data sourced from SAM.gov. View Official Posting »