PENETRATOR,HULL
This Navy RFQ/amendment seeks special-emphasis shipboard electrical connector penetrator assemblies (CPG 1025/1-105) requiring First Article government testing/approval, certified QQ-N-286/QQ-N-281 materials, qualified welding/brazing, NDT, pressure/thread inspection, and configuration-control/waiver compliance. Award will be a DX-rated DPAS order with past performance considered, administered by NAVSUP WSS Mechanicsburg and referencing Portsmouth Naval Shipyard, with FOB destination. Final material delivery is required on or before 365 days after the contract effective date. Certification CDRLs are due 20 days before scheduled delivery; weld procedure/qualification data are due 120 days after contract award with approval 60 days after receipt, and the FAT report is due 180 days after approval of the procedure/qualification package with approval 60 days after receipt. PNSY will review/accept certification CDRLs within 6 working days after receipt.