EXTENSION ASSEMBLY

Notice ID:N0010425QFD88

This is a total small business set-aside for a connector assembly designated as SPECIAL EMPHASIS material (Level I) for use in a crucial shipboard system, with final delivery required 365 days after the contract's effective date. The contractor must provide and maintain a quality system in accordance with ISO-9001, with specific certification, testing, and traceability requirements for parts made from materials like QQ-N-286 and QQ-S-763. Performance of services will be at the contractor's facility, subject to Government Quality Assurance at source, and the place of performance cannot be changed without authorization. The contract carries a "DO" rating for national defense use under the Defense Priorities and Allocations System (DPAS). No budget amount is specified.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE NAVY NAVSUP WEAPON SYSTEMS SUPPORT MECH
  PSC   5935 CONNECTORS, ELECTRICAL


Data sourced from SAM.gov. View Official Posting »

EXTENSION ASSEMBLY

Inactive
Notice ID:N0010425QFD88

This is a contract for the manufacture and delivery of a SPECIAL EMPHASIS Connector Assembly for a crucial Navy shipboard system, requiring strict quality and certification controls. The final delivery of material must occur on or before 365 days after the effective date of the resulting contract. The contract is a "DO" rated priority order under the Defense Priorities and Allocations System (DPAS). Performance requires a robust quality system (e.g., ISO-9001) and involves significant Government oversight, including source inspection and approval of waivers, deviations, and engineering changes.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE NAVY NAVSUP WEAPON SYSTEMS SUPPORT MECH
  PSC   CONNECTORS, ELECTRICAL


Data sourced from SAM.gov. View Official Posting »

EXTENSION ASSEMBLY

Notice ID:N0010425QFD88

This is a contract for the manufacture and delivery of a SPECIAL EMPHASIS Connector Assembly for a crucial Navy shipboard system, requiring extensive quality assurance, material certifications, and traceability. The final delivery of material must occur on or before 365 days after the effective date of the resulting contract. The performance location involves Portsmouth Naval Shipyard, and the contract is a "DO" rated priority order for national defense. The scope involves strict compliance with NAVSEA drawings and numerous military and industry specifications for materials, testing, welding, and inspection.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE NAVY NAVSUP WEAPON SYSTEMS SUPPORT MECH
  PSC   5935 CONNECTORS, ELECTRICAL


Data sourced from SAM.gov. View Official Posting »