AIR COCK
This opportunity is for the manufacture and supply of an air cock, designed and built to specific Navy drawings and technical data, with a small business set-aside. The contract will be a fixed-price, FOB destination order with a DO-rated priority for national defense. Key deliverables include a Certificate of Compliance at material delivery, and if required, first article test reports are due within 45 days of order and Reports of Test and Inspection are due 40 days prior to delivery. The place of performance is not specified, and no budget amount is provided. The contractor must maintain an acceptable inspection system and comply with detailed packaging, quality assurance, and mercury exclusion requirements.