SWITCH,PUSH
This is a contract for the manufacture of a specific push switch (part number 6154602-002, cage code 53711) to meet detailed military specifications. The delivery timeline is 90 days from award, and government source inspection at the contractor's facility is required. The performance location is not specified, but the contractor is liable for all shipping expenses to the destination DODAAC locations. The work involves strict adherence to source control drawings and military standards for design, marking, and configuration.