TOOL HOLDER
N0010425QAA97
This is a contract for the manufacture of a specialized "Tool Holder" that must meet detailed military specifications and drawings. The delivery timeline is 90 days from contract award. Government source inspection is required, and performance will be at the contractor's facility, with final delivery to a FOB Destination point. The work involves strict adherence to numerous military standards for design, testing, marking, and configuration control.