Emergency repair of Fort Buchanan power substation, to include repair of the GCB-3920 48" creep insulated bushings and CT covers. Period of Performance: 60 Calendar days from award. Repair requirement...
Emergency repair of Fort Buchanan power substation, to include repair of the GCB-3920 48" creep insulated bushings and CT covers. Period of Performance: 60 Calendar days from award. Repair requirement is considered an emergency since the damaged power substation is the main and only infrastructure for power distribution serving Fort Buchanan. Given an adverse fault issue condition, a Puerto Rican BOA snake climbed the substation tower and created a short circuit damaging the power substation main Gas Circuit Breaker (GCB) 3920, leaving the installation in its entirety without power after damaging major components of the mentioned breaker.