Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:M0068121Q0044
STATEMENT OF WORK Statement of Work WOVEN WIRE FENCING CAMP PENDLETON, CA Background: Marine Corps Base Camp Pendleton, utilizes woven wire fencing to contain and secure supplies, equipment, and other...
STATEMENT OF WORK Statement of Work WOVEN WIRE FENCING CAMP PENDLETON, CA Background: Marine Corps Base Camp Pendleton, utilizes woven wire fencing to contain and secure supplies, equipment, and other materials within warehousing facilities. 2. Objectives: To have woven wire fencing installed at the designated job location. 3. Scope: To provide security to designated items as per current security regulations. 4. Tasks: 4.1 - Schedule On-Site Field Measurement with TPOC 5 business days of Award 4.2 - Perform On-Site Field Measure with TPOC 10 business days of Award 4.3 - Furnish Woven Wire Fencing Material RDD TBD 4.4 - Commence Woven Wire Fencing Installation RDD TBD 4.5 - The TPOC will inspect the job when complete TBD Task 1 — Schedule On-Site Field Measurement with TPOC The Contractor will schedule an on-site field measurement with the Technical Point of Contact (TPOC) within five (5) business days of contract award. Task 2 — Perform On-Site Field Measurement with TPOC The Contractor will attend the on-site field measurement with the TPOC within ten (10) business days of contract award. The TPOC will accompany the contractor to the job site to ensure that the contractor has a full understanding of the required scope and possess all required information to perform the job. The Contractor will bring measuring equipment and the government’s technical drawing to the field measurement. The contractor will provide a drawing(s) to the TPOC for approval prior to fabrication. Task 3 — Furnish Woven Wire Fencing Material The Contractor will fabricate the materials in accordance with the Government's standards. Material Requirements are as follows: All wire edges are to be enclosed in at least 12 gauge channel. Require 10 gauge 1 ½" diamond wire mesh. Fence stiffeners, if required, are to be posts centered on the wire partitions. Color: Dark Brown Paint: Enamel ( semi-gloss) Task 4 — Woven Wire Fencing Installation The Contractor will install all required woven wire fencing in accordance with Government provided technical drawing (See Enclosure). Task 5 — Completed Job Inspection This Contract does not contain a Quality Assurance Surveillance Plan (QASP); however, the TPOC will inspect the job for quality upon completion. Quality will be measured in accordance with the following: Measurement information from the on-site field measurement Technical Drawing(s) Contractor's quoted material at the time of the solicitation