Columbus HD Upgrade
The project involves the procurement and installation of data center HVAC components and associated electrical distribution upgrades to support high-density IT equipment, including a new redundant liquid cooling system and power distribution upgrades that must integrate with the existing Building Automation System. The contractor will provide all design, installation, programming, submittals, and as-built documentation, with option breakouts for Rear Door Heat Exchanger and Power Distribution units. Performance will be at the Columbus HD Upgrade site, with two install areas (Room 144 and Room 113) having approximate distances of 250 ft and 100 ft from the main BAS connection point, which should be field verified. A pre-proposal site visit is scheduled for Wednesday, July 15, 2026 at 9:00 AM CST, with VARs required five business days prior and site visit questions due five calendar days after. Access to protected proposal documents requires SAM registration with NAICS 333415, and recent registrations may take up to two weeks to gain access.
Links (0)
Attachments (22)
Data sourced from SAM.gov.
View Official Posting »