Total Small Business Set-Aside (FAR 19.5)
Notice ID:HC102824R0067
Correction - In room 201, the existing PDU will be removed and replaced with a Remote Distribution Cabinet (RDC). The count of PDU demo is eleven (11). The count of PDU replacement is ten (10). ------...
Correction - In room 201, the existing PDU will be removed and replaced with a Remote Distribution Cabinet (RDC). The count of PDU demo is eleven (11). The count of PDU replacement is ten (10). -------------------------------------------------------------- See attachment, HC102824R0067 R1 Questions (DISA Response). Additionally, PDU_2-A-02 is accurately identified on drawing E-107. The drawings I provided in my response reflect the changes to drawings E-604 to indicate accurate replacement. For the CLIN, the total quantity of 125kVA PDUs should be eleven (11). All electrical information on the drawings should now be accurate. -------------------------------------------------------------- RFP AMD01 HC102824R0067 RF EOL extends solicitaion due date to 5 September 2024. 12:00 PM CST. -------------------------------------------------------------- The existing units (CRAH-66 & 67) are Model # CW114DC1A2A079. Replacement units should match these model types. Brand name or equal replacement. -------------------------------------------------------------- The mechanical sheet M-500 has a typo. It should be CW114 instead CW141. The information noted is accurate and reflects a size available from the Vertiv/Liebert/Emerson website. Based on the information for the subject units, model number Liebert CW114DC1A2A079 could be used for this requirement. -------------------------------------------------------------- SPEC, LLC, POC: Greg Howard, 317-903-0241 -------------------------------------------------------------- Added the following attachments: 1. HC102824R0067 Questions (DISA Response) 2. Specification - 23 05 53 3. Specifications - 26 28 01.00 10 4. Method of Procedure Example 5. MOP Example The provided design concept does not include drawings E-101, E-103, and E-104. There is no identified work taking place on these drawing sheets. -------------------------------------------------------------- Added attachment, "Reference Photos" -------------------------------------------------------------- Added attachment, "Reference Drawing E-601 (Additional)" -------------------------------------------------------------- Added attachments, "Question and Answers" and "26 24 15". -------------------------------------------------------------- Added attachment, "Attachment 5 - Site Visit Request Instructions RF EOL". -------------------------------------------------------------- Data Center Mechanicsburg has Computer Room Air Handlers (CRAH) units and electrical equipment that have reached their end of life and need to be replaced. All of the equipment serve critical areas and need upgraded to prevent any downtime or mission loss. Provide Data Center Mechanicsburg with new CRAH units, Power Distribution Units (PDU’s), Remote Distribution Cabinets (RDC’s) and any additional electrical as shown on the design concept plans. You must submit a Document Access request. The Access Request Link is located below the Attachments/Links header. You must be logged in and a registered user within your organization. This contracting opportunity is reserved for small businesses registered under NAICS 333415. Document access is unavailable if NAICS 333415 is not part of your organization’s registration.