FINAL RFP - Special Operations Forces (SOF) Global Logistics Support Services II (GLSS2) Contract

Notice ID:H92254-25-RE-001

This is a full and open competition for a single-award IDIQ contract to provide global lifecycle logistics support for U.S. Special Operations Forces, with a maximum ceiling value of $10,530,000,010.00 and a potential twelve-year ordering period. The primary place of performance is Bluegrass Station in Lexington, Kentucky, with additional work at strategic locations both within and outside the continental United States. The solicitation has been amended to clarify proposal formatting, page limits, cost treatment, and document revisions, including updated collective bargaining agreements. For Task Order #3, offerors must contact the specified personnel for location information. The government points of contact will be unavailable during a shutdown, but all submission deadlines remain in effect.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE U.S. SPECIAL OPERATIONS COMMAND (USSOCOM) SPECIAL OPERATIONS FORCES SPT ACTY
  PSC   R706 LOGISTICS SUPPORT SERVICES
LOCATION: Not Given
Primary Contact
Brian C. Hubbs
Not Given
Alt Contact
Michael Geegan
Not Given

Links (0)

Attachments (85)

Document
Size
Access
Updated
Solicitation H9225425RE001 Conformed through Amendment 0002.pdf
1 MB
Controlled
Mar 8, 2026
Solicitation Amendment H9225425RE001 Amendment 0002.pdf
1.31 MB
Controlled
Mar 8, 2026
Section L_Attachment 00A_Rev2.docx
110.54 KB
Controlled
Mar 8, 2026
H9225425RE001 QnA Responses 30Oct25.xlsx
49.68 KB
Controlled
Oct 30, 2025
H92254-25-RE-001 SOF GLSS2 RFP Cover Letter.pdf
207.71 KB
Public
Sep 22, 2025
Solicitation H9225425RE001 Amendment 0001.pdf
620.22 KB
Controlled
Oct 30, 2025
Solicitation H9225425RE001 Conformed Through Amendment 0001.pdf
1.52 MB
Controlled
Oct 30, 2025
Solicitation - H9225425RE001.pdf
1.97 MB
Public
Sep 22, 2025
Section H_Amend 0001 Tracked Changes.docx
67.21 KB
Controlled
Oct 30, 2025
Section L_Attachment 00A_Rev 1.docx
115.25 KB
Controlled
Oct 30, 2025
Section M_Attachment 00B.pdf
170.74 KB
Public
Sep 22, 2025
GLSS2 Attachment List_Rev1.xlsx
23.77 KB
Controlled
Oct 30, 2025
RFP Att 01_Performance Work Statement (PWS)_Rev1.docx
102.03 KB
Controlled
Oct 30, 2025
RFP Att 02_DD254 Sep2025.pdf
294.62 KB
Controlled
Sep 22, 2025
RFP Att 03_CDRLs.pdf
1.13 MB
Controlled
Sep 22, 2025
RFP Att 04_TO 1 ITO MH60M.docx
37.65 KB
Controlled
Sep 22, 2025
RFP Att 05_TO 1 SOO MH60M.docx
64.08 KB
Controlled
Sep 22, 2025
RFP Att 06_TO 2 ITO FOSOV.docx
37.54 KB
Controlled
Sep 22, 2025
RFP Att 07_TO 2 SOO FOSOV.docx
72.46 KB
Controlled
Sep 22, 2025
RFP Att 08_TO 3 ITO MQ9.docx
35.57 KB
Controlled
Sep 22, 2025
RFP Att 09_TO 3 SOO MQ9_Rev1.docx
73.22 KB
Controlled
Oct 30, 2025
RFP Att 10_Enterprise Budget Template_Rev1.xlsx
82.96 KB
Controlled
Oct 30, 2025
RFP Att 11a_TO 1 Cost Worksheet MH60M_Rev1.xlsx
40.05 KB
Controlled
Oct 30, 2025
RFP Att 11b_TO 2 Cost Worksheet FOSOV_Rev1.xlsx
39.64 KB
Controlled
Oct 30, 2025
RFP Att 11c_TO 3 Cost Worksheet MQ9_Rev1.xlsx
50.62 KB
Controlled
Oct 30, 2025
RFP Att 12_QnA Template.xlsx
37.4 KB
Public
Sep 22, 2025
RFP Att 13_Quailty Assurance Surveillance Plan QASP.docx
60.28 KB
Controlled
Sep 22, 2025
RFP Att 14_Past Performance Questionnaire_Rev1.docx
46.5 KB
Controlled
Oct 30, 2025
RFP Att 15_List of Applicable WDs and CBAs_Rev1.xlsx
19.99 KB
Controlled
Oct 30, 2025
PWS App A_Enterprise Metrics.docx
64.12 KB
Controlled
Sep 22, 2025
PWS App B_SOFSANet Core Services.docx
72.67 KB
Controlled
Sep 22, 2025
PWS App C_SOFSANet Software List.xlsx
95.13 KB
Controlled
Sep 22, 2025
PWS App D_PEO SOFSA Network Architecture.docx
133.92 KB
Controlled
Sep 22, 2025
PWS App E_PEO SOFSA Stratified Inventory.docx
26.03 KB
Controlled
Sep 22, 2025
PWS App F_Base Contract Property.xlsx
157.58 KB
Controlled
Sep 22, 2025
PWS App G_RFP GLSS2 TO Transition Schedule.xlsx
37.48 KB
Controlled
Sep 22, 2025
PWS App H_Facilities Maintenance Requirement.xlsx
114.35 KB
Controlled
Sep 22, 2025
PWS App I_Accountable Inventory Officer SOP.pdf
721.98 KB
Controlled
Sep 22, 2025
TO 1 Att 01_CDRLs MH60M.pdf
128.54 KB
Controlled
Sep 22, 2025
TO 1 Att 02_QASP MH60M.docx
553.58 KB
Controlled
Sep 22, 2025
TO 1 SOO App A_MH-60M Basic Weight Update.pdf
122.24 KB
Controlled
Sep 22, 2025
TO 1 SOO App A_CIRCM Installation.pdf
58.18 MB
Controlled
Sep 22, 2025
TO 1 SOO App A_DVE Installation.pdf
47.81 MB
Controlled
Sep 22, 2025
TO 1 SOO App A_APQ-187 SKR Installation.pdf
30.89 MB
Controlled
Sep 22, 2025
TO 1 SOO App A_1553 Connection to Q2 SEU.pdf
1.02 MB
Controlled
Sep 22, 2025
TO 1 SOO App A_ Cabin ICS Control Panel.pdf
2.2 MB
Controlled
Sep 22, 2025
TO 1 SOO App A_EIBF Installation.pdf
26.53 MB
Controlled
Sep 22, 2025
TO 1 SOO App A_Engine Bay Spring Clip Installation.pdf
325.88 KB
Controlled
Sep 22, 2025
TO 1 SOO App A_PLS System Demod.pdf
3.33 MB
Controlled
Sep 22, 2025
TO 1 SOO App A_Relocation of the Native Mode Switch Function.pdf
927.75 KB
Controlled
Sep 22, 2025
TO 1 SOO App A_STA 379 Frames.pdf
20.15 MB
Controlled
Sep 22, 2025
TO 1 SOO App A_STA 485 Stringer Replacement.pdf
5.6 MB
Controlled
Sep 22, 2025
TO 1 SOO App A_STT System Installation.pdf
34.08 MB
Controlled
Sep 22, 2025
TO 1 SOO App A_USB Port Installation.pdf
11.86 MB
Controlled
Sep 22, 2025
TO 2 Att 01_CDRLS FOSOV.pdf
2.85 MB
Controlled
Sep 22, 2025
TO 2 Att 02_DD254 FOSOV.pdf
499.99 KB
Controlled
Sep 22, 2025
TO 2 Att 03_QASP FOSOV.docx
559.81 KB
Controlled
Sep 22, 2025
TO 2 Att 04_GFP List FOSOV.xlsx
31.14 KB
Controlled
Sep 22, 2025
TO 2 Att 05_ECR Process.pdf
1.23 MB
Controlled
Sep 22, 2025
TO 2 Att 06_FOSOV Web App Guide.pdf
8.66 MB
Controlled
Sep 22, 2025
TO 2 Att 07_PARTS Web Overview.pdf
971.38 KB
Controlled
Sep 22, 2025
TO 3 Att 01_CDRLs MQ9.pdf
427.22 KB
Controlled
Sep 22, 2025
TO 3 Att 02_DD254 MQ9.pdf
503.18 KB
Controlled
Sep 22, 2025
TO 3 Att 03_QASP MQ9.docx
720.31 KB
Controlled
Sep 22, 2025
TO 3 Att 04_AFMAN 21-206.pdf
4.98 MB
Controlled
Sep 22, 2025
TO 3 Att 04_Aircraft Information Publications.pdf
1.02 MB
Controlled
Sep 22, 2025
TO 3 Att 04_Aircraft Launch.pdf
2.61 MB
Controlled
Sep 22, 2025
TO 3 Att 04_Aircraft Movement.pdf
238.8 KB
Controlled
Sep 22, 2025
TO 3 Att 04_Aircraft Towing.pdf
1.14 MB
Controlled
Sep 22, 2025
TO 3 Att 04_BPO_Preflight Insp.pdf
1.14 MB
Controlled
Sep 22, 2025
TO 3 Att 04_Engine removal with required conditions.pdf
14.46 MB
Controlled
Sep 22, 2025
TO 3 Att 04_EOR.pdf
491.29 KB
Controlled
Sep 22, 2025
TO 3 Att 04_MTS Removal with Required Conditions.pdf
13.78 MB
Controlled
Sep 22, 2025
TO 3 Att 04_Periodic Inspection Listing_WUC Listing.pdf
5.77 MB
Controlled
Sep 22, 2025
TO 3 Att 04_Thruflight.pdf
433.59 KB
Controlled
Sep 22, 2025
2024 Workorder Log.xlsx
759.79 KB
Controlled
Sep 22, 2025
CBA Akima_IAMAW Yuma AZ 20230224.pdf
462.27 KB
Controlled
Oct 30, 2025
CBA Yulista_IAMAW Cannon AFB NM 20250301.pdf
566.21 KB
Controlled
Oct 30, 2025
CBA LM_IAMAW FWB FL 20220611.pdf
586.01 KB
Controlled
Oct 30, 2025
CBA DRG_IAMAW JBLM WA 20240306.pdf
1.37 MB
Controlled
Oct 30, 2025
CBA LM_IAMAW Lexington KY 20240922.pdf
1.69 MB
Controlled
Oct 30, 2025
CBA TLS_IAMAW Lexington KY 20230701.pdf
3.88 MB
Controlled
Oct 30, 2025
CBA MOA Yulista_IAMAW FWB FL 20240930.pdf
4.04 MB
Controlled
Oct 30, 2025
Wage Determination PDF Portfolio (all WDs).pdf
3 MB
Controlled
Sep 22, 2025
PWS 3.0 Applicable Docs Portfolio.zip
77.61 MB
Controlled
Sep 22, 2025


Data sourced from SAM.gov. View Official Posting »

FINAL RFP - Special Operations Forces (SOF) Global Logistics Support Services II (GLSS2) Contract

Notice ID:H92254-25-RE-001

This is a full and open competition for a single-award IDIQ contract to provide global lifecycle logistics support services for U.S. Special Operations Forces, with a maximum ceiling value of $10.53 billion and a performance period of up to 12 years. The primary location for performance is Bluegrass Station in Lexington, Kentucky, with other facilities located both within and outside the continental United States. The contract involves three core competencies: streamlined design and rapid prototyping; production, modification, and integration; and lifecycle sustainment activities across aviation, ground, and maritime platforms. Offerors must have an active SAM.gov CAGE code and a Top-Secret Facility Clearance to access controlled solicitation documents. For Task Order #3, offerors are instructed to contact the specified government personnel for additional location information.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE U.S. SPECIAL OPERATIONS COMMAND (USSOCOM) SPECIAL OPERATIONS FORCES SPT ACTY
  PSC   R706 LOGISTICS SUPPORT SERVICES
LOCATION: Not Given
Primary Contact
Brian C. Hubbs
Not Given
Alt Contact
Michael Geegan
Not Given

Links (0)

Attachments (82)

Document
Size
Access
Updated
H9225425RE001 QnA Responses 30Oct25.xlsx
49.68 KB
Controlled
Oct 30, 2025
H92254-25-RE-001 SOF GLSS2 RFP Cover Letter.pdf
207.71 KB
Public
Sep 22, 2025
Solicitation H9225425RE001 Amendment 0001.pdf
620.22 KB
Controlled
Oct 30, 2025
Solicitation H9225425RE001 Conformed Through Amendment 0001.pdf
1.52 MB
Controlled
Oct 30, 2025
Solicitation - H9225425RE001.pdf
1.97 MB
Public
Sep 22, 2025
Section H_Amend 0001 Tracked Changes.docx
67.21 KB
Controlled
Oct 30, 2025
Section L_Attachment 00A_Rev 1.docx
115.25 KB
Controlled
Oct 30, 2025
Section M_Attachment 00B.pdf
170.74 KB
Public
Sep 22, 2025
GLSS2 Attachment List_Rev1.xlsx
23.77 KB
Controlled
Oct 30, 2025
RFP Att 01_Performance Work Statement (PWS)_Rev1.docx
102.03 KB
Controlled
Oct 30, 2025
RFP Att 02_DD254 Sep2025.pdf
294.62 KB
Controlled
Sep 22, 2025
RFP Att 03_CDRLs.pdf
1.13 MB
Controlled
Sep 22, 2025
RFP Att 04_TO 1 ITO MH60M.docx
37.65 KB
Controlled
Sep 22, 2025
RFP Att 05_TO 1 SOO MH60M.docx
64.08 KB
Controlled
Sep 22, 2025
RFP Att 06_TO 2 ITO FOSOV.docx
37.54 KB
Controlled
Sep 22, 2025
RFP Att 07_TO 2 SOO FOSOV.docx
72.46 KB
Controlled
Sep 22, 2025
RFP Att 08_TO 3 ITO MQ9.docx
35.57 KB
Controlled
Sep 22, 2025
RFP Att 09_TO 3 SOO MQ9_Rev1.docx
73.22 KB
Controlled
Oct 30, 2025
RFP Att 10_Enterprise Budget Template_Rev1.xlsx
82.96 KB
Controlled
Oct 30, 2025
RFP Att 11a_TO 1 Cost Worksheet MH60M_Rev1.xlsx
40.05 KB
Controlled
Oct 30, 2025
RFP Att 11b_TO 2 Cost Worksheet FOSOV_Rev1.xlsx
39.64 KB
Controlled
Oct 30, 2025
RFP Att 11c_TO 3 Cost Worksheet MQ9_Rev1.xlsx
50.62 KB
Controlled
Oct 30, 2025
RFP Att 12_QnA Template.xlsx
37.4 KB
Public
Sep 22, 2025
RFP Att 13_Quailty Assurance Surveillance Plan QASP.docx
60.28 KB
Controlled
Sep 22, 2025
RFP Att 14_Past Performance Questionnaire_Rev1.docx
46.5 KB
Controlled
Oct 30, 2025
RFP Att 15_List of Applicable WDs and CBAs_Rev1.xlsx
19.99 KB
Controlled
Oct 30, 2025
PWS App A_Enterprise Metrics.docx
64.12 KB
Controlled
Sep 22, 2025
PWS App B_SOFSANet Core Services.docx
72.67 KB
Controlled
Sep 22, 2025
PWS App C_SOFSANet Software List.xlsx
95.13 KB
Controlled
Sep 22, 2025
PWS App D_PEO SOFSA Network Architecture.docx
133.92 KB
Controlled
Sep 22, 2025
PWS App E_PEO SOFSA Stratified Inventory.docx
26.03 KB
Controlled
Sep 22, 2025
PWS App F_Base Contract Property.xlsx
157.58 KB
Controlled
Sep 22, 2025
PWS App G_RFP GLSS2 TO Transition Schedule.xlsx
37.48 KB
Controlled
Sep 22, 2025
PWS App H_Facilities Maintenance Requirement.xlsx
114.35 KB
Controlled
Sep 22, 2025
PWS App I_Accountable Inventory Officer SOP.pdf
721.98 KB
Controlled
Sep 22, 2025
TO 1 Att 01_CDRLs MH60M.pdf
128.54 KB
Controlled
Sep 22, 2025
TO 1 Att 02_QASP MH60M.docx
553.58 KB
Controlled
Sep 22, 2025
TO 1 SOO App A_MH-60M Basic Weight Update.pdf
122.24 KB
Controlled
Sep 22, 2025
TO 1 SOO App A_CIRCM Installation.pdf
58.18 MB
Controlled
Sep 22, 2025
TO 1 SOO App A_DVE Installation.pdf
47.81 MB
Controlled
Sep 22, 2025
TO 1 SOO App A_APQ-187 SKR Installation.pdf
30.89 MB
Controlled
Sep 22, 2025
TO 1 SOO App A_1553 Connection to Q2 SEU.pdf
1.02 MB
Controlled
Sep 22, 2025
TO 1 SOO App A_ Cabin ICS Control Panel.pdf
2.2 MB
Controlled
Sep 22, 2025
TO 1 SOO App A_EIBF Installation.pdf
26.53 MB
Controlled
Sep 22, 2025
TO 1 SOO App A_Engine Bay Spring Clip Installation.pdf
325.88 KB
Controlled
Sep 22, 2025
TO 1 SOO App A_PLS System Demod.pdf
3.33 MB
Controlled
Sep 22, 2025
TO 1 SOO App A_Relocation of the Native Mode Switch Function.pdf
927.75 KB
Controlled
Sep 22, 2025
TO 1 SOO App A_STA 379 Frames.pdf
20.15 MB
Controlled
Sep 22, 2025
TO 1 SOO App A_STA 485 Stringer Replacement.pdf
5.6 MB
Controlled
Sep 22, 2025
TO 1 SOO App A_STT System Installation.pdf
34.08 MB
Controlled
Sep 22, 2025
TO 1 SOO App A_USB Port Installation.pdf
11.86 MB
Controlled
Sep 22, 2025
TO 2 Att 01_CDRLS FOSOV.pdf
2.85 MB
Controlled
Sep 22, 2025
TO 2 Att 02_DD254 FOSOV.pdf
499.99 KB
Controlled
Sep 22, 2025
TO 2 Att 03_QASP FOSOV.docx
559.81 KB
Controlled
Sep 22, 2025
TO 2 Att 04_GFP List FOSOV.xlsx
31.14 KB
Controlled
Sep 22, 2025
TO 2 Att 05_ECR Process.pdf
1.23 MB
Controlled
Sep 22, 2025
TO 2 Att 06_FOSOV Web App Guide.pdf
8.66 MB
Controlled
Sep 22, 2025
TO 2 Att 07_PARTS Web Overview.pdf
971.38 KB
Controlled
Sep 22, 2025
TO 3 Att 01_CDRLs MQ9.pdf
427.22 KB
Controlled
Sep 22, 2025
TO 3 Att 02_DD254 MQ9.pdf
503.18 KB
Controlled
Sep 22, 2025
TO 3 Att 03_QASP MQ9.docx
720.31 KB
Controlled
Sep 22, 2025
TO 3 Att 04_AFMAN 21-206.pdf
4.98 MB
Controlled
Sep 22, 2025
TO 3 Att 04_Aircraft Information Publications.pdf
1.02 MB
Controlled
Sep 22, 2025
TO 3 Att 04_Aircraft Launch.pdf
2.61 MB
Controlled
Sep 22, 2025
TO 3 Att 04_Aircraft Movement.pdf
238.8 KB
Controlled
Sep 22, 2025
TO 3 Att 04_Aircraft Towing.pdf
1.14 MB
Controlled
Sep 22, 2025
TO 3 Att 04_BPO_Preflight Insp.pdf
1.14 MB
Controlled
Sep 22, 2025
TO 3 Att 04_Engine removal with required conditions.pdf
14.46 MB
Controlled
Sep 22, 2025
TO 3 Att 04_EOR.pdf
491.29 KB
Controlled
Sep 22, 2025
TO 3 Att 04_MTS Removal with Required Conditions.pdf
13.78 MB
Controlled
Sep 22, 2025
TO 3 Att 04_Periodic Inspection Listing_WUC Listing.pdf
5.77 MB
Controlled
Sep 22, 2025
TO 3 Att 04_Thruflight.pdf
433.59 KB
Controlled
Sep 22, 2025
2024 Workorder Log.xlsx
759.79 KB
Controlled
Sep 22, 2025
CBA Akima_IAMAW Yuma AZ 20230224.pdf
462.27 KB
Controlled
Oct 30, 2025
CBA Yulista_IAMAW Cannon AFB NM 20250301.pdf
566.21 KB
Controlled
Oct 30, 2025
CBA LM_IAMAW FWB FL 20220611.pdf
586.01 KB
Controlled
Oct 30, 2025
CBA DRG_IAMAW JBLM WA 20240306.pdf
1.37 MB
Controlled
Oct 30, 2025
CBA LM_IAMAW Lexington KY 20240922.pdf
1.69 MB
Controlled
Oct 30, 2025
CBA TLS_IAMAW Lexington KY 20230701.pdf
3.88 MB
Controlled
Oct 30, 2025
CBA MOA Yulista_IAMAW FWB FL 20240930.pdf
4.04 MB
Controlled
Oct 30, 2025
Wage Determination PDF Portfolio (all WDs).pdf
3 MB
Controlled
Sep 22, 2025
PWS 3.0 Applicable Docs Portfolio.zip
77.61 MB
Controlled
Sep 22, 2025


Data sourced from SAM.gov. View Official Posting »