Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:FY23-SheppardAFB-GreaseTraps
The following is a presolicitation notice. The Government will not be accepting any quotes, bids or proposals at this time. Interested parties will not be reimbursed for any cost related to responding...
The following is a presolicitation notice. The Government will not be accepting any quotes, bids or proposals at this time. Interested parties will not be reimbursed for any cost related to responding to this notice. The solicitation will be posted on or before 20 May 2022 The 82nd contracting squadron is seeking capable offeror to provide services for Grease and grit traps on Sheppard AFB, TX. A copy of the Performace Work Statement is attached.. The contractor shall be responsible for pumping, cleaning, scraping, deodorizing, transporting, and disposing of waste from grease traps, sand and grit traps, and elevator/hydraulic lift pits as outlined in this Performance Work Statement (PWS). They shall ensure all grates, covers, grills, and hookups are returned to their original position before departing the area. If a lid is dropped into a trap by the contractor, the contractor is responsible for removing the lid within 4 hours. During the timeframe needed to retrieve the dropped lid, the contractor shall ensure any unsafe area is secured until lid has been retrieved. In addition to the trap, all drainage lines shall be clear of grease, oil, sand, dirt, or other material to ensure they are kept free flowing. Any spills, debris, or damage to the surrounding area by the contractor shall be reported immediately to the Contracting Officer's Representative (COR) and shall be returned to the original condition (as determined by the CO) by the contractor at no additional cost to the government. Contractor is to report to the COR any concerns with locations, hook ups, safety, utilities, and government personnel while performing services. The contractor shall provide adequate equipment to perform services within varying distances from water sources. Contractor shall record amount of collection after each service location and submit a consolidated monthly report..