Inactive
Historically Underutilized Business (HUBZone) Sole Source (FAR 19.13)
Notice ID:FTQW_23-1401_Repair_Lift_Station_B2212
This Synopsis describes the Government’s requirement for construction of a new bypass lift station at Eielson AFB, which is located approximately 23.0 miles southeast of Fairbanks, Alaska. Work shall ...
This Synopsis describes the Government’s requirement for construction of a new bypass lift station at Eielson AFB, which is located approximately 23.0 miles southeast of Fairbanks, Alaska. Work shall include but is not limited to the installation of a new fiberglass wet well, two 15hp pumps, two actuating valves and a bypass line leading to the new wet well. A utilidor addition shall be constructed and shall include an access hatch at grade. Due to the shallow water table and groundwater contamination, the fiber glass lift station basin will be installed on tremie slabs surrounded by secant pile walls. The new lift station shall be programmed in such a way as to alternate use with the existing lift station at B2212. Electric heat tape shall be installed around all new piping. The existing service breaker and generator breaker shall be replaced. The site shall be regraded to allow for proper drainage and any disturbed areas shall be repaired to match existing conditions.