Repair & Maintain Airfield Stormwater System Phase II
FGWB21000AB_3
This project involves repairing stormwater drainage systems east of Taxiway 'J' at Dobbins ARB, including regrading and sodding failed slopes for stabilization. Work also covers maintenance items in basins III, IV, and V, cleaning existing flumes, pipes, and swales, and installing new concrete flumes to prevent erosion and standing water. No specific budget amount is mentioned. The location for performance is Dobbins ARB. No non-bid or submission timelines are provided.