Repair & Maintain Airfield Stormwater System Phase II
This is a Request for Information (RFI) for market research purposes only, seeking qualified small businesses for specialized stormwater repair work at Dobbins ARB. The key requirement involves installing storm drainage pipe larger than 48 inches in diameter using Jack and Bore methodology under active travel ways. Interested small businesses must have self-performed at least 20% of direct contract labor on similar projects involving 300+ linear feet of continuous 48-inch or larger jack and bore construction within the past five years. The project also includes grading, sodding, and pipelining. No specific budget, submission timeline, or performance location beyond Dobbins ARB is mentioned.