Repair & Maintain Airfield Stormwater System Phase II
This project involves repairing stormwater drainage systems east of Taxiway 'J' on Dobbins ARB. The work includes regrading and sodding failed or disturbed slopes for stabilization and positive drainage, performing all maintenance in basins III, IV, and V, and cleaning existing flumes, pipes, and swales. It also requires installing new concrete flumes at various airfield locations to reestablish drainage and prevent future erosion and standing water. The location for the performance of services is Dobbins ARB. Timelines and budget information are not mentioned in the provided description.