SOR Waterline Repair

Inactive Total Small Business Set-Aside (FAR 19.5)
Notice ID:FA940126R0023

The primary purpose and objective of this project is to outline the scope for the design and construction of a new 7,900 feet high-pressure waterline, appurtenant systems, and associated control syste...

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA9401 377 MSG PK
  PSC   ARCHITECT AND ENGINEERING- CONSTRUCTION: WATER SUPPLY FACILITIES
LOCATION: Not Given
Primary Contact
TSgt Hillarie Johnson
505-***-6283
Alt Contact
Abigail R. Crespin
505-***-2596

Links (0)

Attachments (20)


Data sourced from SAM.gov. View Official Posting »

SOR Waterline Repair

Total Small Business Set-Aside (FAR 19.5)
Notice ID:FA940126R0023

The project involves the design and construction of an approximately 7,900-foot high-pressure waterline with appurtenant and control systems on the southeast side of Kirtland Air Force Base (KAFB), replacing existing infrastructure to provide a reliable water supply from Pump Station 2 to the SOR and HERTF reservoirs. The scope includes an 8-inch ductile iron pipe, valves and fittings, a SCADA system upgrade, a portable hoist, a new 15,000-gallon tank with booster pumps, and a new 5,000-gallon tank with a pre-packaged pump station at the SOR site. A site visit is scheduled for 03 September 2026 at 1300 MST, with attendees meeting at the Truman Gate Visitors Center at 1200 MST. Performance will take place on the southeast side of KAFB. All responsible sources may submit a proposal for consideration.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA9401 377 MSG PK
  PSC   C1NE ARCHITECT AND ENGINEERING- CONSTRUCTION: WATER SUPPLY FACILITIES
LOCATION: Not Given
Primary Contact
TSgt Hillarie Johnson
505-***-6283
Alt Contact
Abigail R. Crespin
505-***-2596


Data sourced from SAM.gov. View Official Posting »

SOR Waterline Repair

Total Small Business Set-Aside (FAR 19.5)
Notice ID:FA940126R0023

The project involves designing and constructing a 7,900-foot high-pressure waterline and appurtenant systems on the southeast side of Kirtland Air Force Base (KAFB). It aims to provide a reliable water supply from Pump Station 2 to the SOR and HERTF reservoirs, including ductile iron pipe, SCADA upgrades, a 15,000-gallon tank with booster pumps, and a 5,000-gallon tank and pump station at the SOR site. A site visit is scheduled for 03 September 2026 at 1300 MST, with attendees meeting at Truman Gate Visitors Center. All responsible sources may submit a quotation, bid, or proposal, as appropriate. Contractor access to controlled unclassified information requires submission of a DD2345 form.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA9401 377 MSG PK
  PSC   C1NE ARCHITECT AND ENGINEERING- CONSTRUCTION: WATER SUPPLY FACILITIES
LOCATION: Not Given
Primary Contact
TSgt Hillarie Johnson
505-***-6283
Alt Contact
Abigail R. Crespin
505-***-2596


Data sourced from SAM.gov. View Official Posting »

SOR Waterline Repair

Total Small Business Set-Aside (FAR 19.5)
Notice ID:FA940126R0023

Design and construction of a new 7,900-foot high-pressure waterline with appurtenant and control systems on the southeast side of Kirtland Air Force Base (KAFB), replacing infrastructure from Pump Station 2 to the SOR and HERTF reservoirs. The project includes ductile iron pipe, SCADA upgrades, a portable hoist, a 15,000-gallon tank with booster pumps, and a 5,000-gallon tank and pre-packaged pump station at the SOR site. A site visit is scheduled for 03 September 2026 at 1300 MST, with attendees meeting at the Truman Gate Visitors Center at 1200 MST. All responsible sources may submit a quotation, bid, or proposal for consideration.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA9401 377 MSG PK
  PSC   C1NE ARCHITECT AND ENGINEERING- CONSTRUCTION: WATER SUPPLY FACILITIES


Data sourced from SAM.gov. View Official Posting »