Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:FA9401-24-Q-0038
The Air Force has a requirement for 2 sodium nickel battery modules to replace existing battery modules. Manufacturing date of batteries should be within 12 months of Period of Performance. Contractor...
The Air Force has a requirement for 2 sodium nickel battery modules to replace existing battery modules. Manufacturing date of batteries should be within 12 months of Period of Performance. Contractor must remove existing lead-acid batteries in accordance with any applicable federal and state laws. Remove hardware and install new batteries, rack, and network module in its place. Must provide one new power inverter which can support 100- amps. In addition to installing 7 new power outlets throughout the cabinets located in the room housing the batteries, power distribution cabinet, and invertors.