LIFT STATION REDESIGN B20128
The contractor must provide all resources for a redesigned lift station to transport hazardous liquid chemical waste at Robins Air Force Base, Georgia. Each station requires two electric pumps with specific materials and performance specs, a polypropylene tank of 50-75 gallons, and a stainless steel control panel. The lift station dimensions are four feet long, three feet wide, and four feet high, with power supply options of 120V or 208V. No budget amounts, submission timelines, or bid deadlines are specified in the description. Performance location is Robins Air Force Base, Georgia.