Inactive
Notice ID:FA8252023Q0215
SCOPE OF WORK: For the end item the contractor shall furnish all facilities, parts, materials, equipment, and services, required to inspect and, if necessary, restore to serviceable condition. Service...
SCOPE OF WORK: For the end item the contractor shall furnish all facilities, parts, materials, equipment, and services, required to inspect and, if necessary, restore to serviceable condition. Services to be performed will not be essential in a crisis situation. Work consists of one of three efforts: Test, teardown, and evaluation (TT&E) only; TT&E and Minor Repair; TT&E and Major Repair. 1.1 TEST, TEARDOWN, AND EVALUATION: (FFP) The contractor shall perform visual, mechanical and electrical testing of the end item, reusable or replacement component parts, and materials according to the schedule in the contract to determine the condition of the end item. Upon completion of this task, all of the components of the end item requiring repair or replacement will be identified by part number, NSN (if applicable), nomenclature, and location in the assembly. This information will be reported in writing to the Procurement Contracting Officer (PCO)/ Defense Contract Management Agency (DCMA) Administrative Contracting Officer (ACO) and, if necessary, a category of repair will be negotiated. The price of repair for the end item will be firm-fixed based on this negotiated repair level. If no further repair is required, the asset must be returned in serviceable like new condition. 1.2 REPAIR: (FFP) The contractor shall perform the repair or replacement of all failed parts and components. Each end item must be cleaned, configured, refinished, and tested to meet the original specifications of the end item. The end item shall be returned in serviceable like new condition. Below listed item(s) will be shipped to contractor to repair: Item Description NSN Part Number High Voltage Power Supply 6130-01-083-3713 654E4065-1