Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:FA822421R0012
This requirement is Procure, manufacture, deliver, and install two (2) X202023603 -01 configurations and one (1) X202023603 -02 REV B configuration C-130 floor ramp(s). Drawings X202023603-01 REV B an...
This requirement is Procure, manufacture, deliver, and install two (2) X202023603 -01 configurations and one (1) X202023603 -02 REV B configuration C-130 floor ramp(s). Drawings X202023603-01 REV B and X202023603-02 REV B will be provided upon request to the primary point of contact. The Floor Ramps are used to raise a C-130 aircraft at Hill Air Force Base (HAFB). The Floor Ramps shall be delivered no later than five (5) months from contract award. Installation will commence at time of delivery. Delivery and acceptance of all orders shall be at Hill Air Force Base, Utah FOB Destination delivery terms shall apply Installation In Accordance with attached Statement of Work