Inactive
Notice ID:FA8224-23-Aerobotix
The 574 AMXS performs periodic automated inlet coatings repair (ICR) on the F-22 using specialized painting robots in Building 674 at Hill AFB. The F-22 Coating Robots and Control Consoles are used to...
The 574 AMXS performs periodic automated inlet coatings repair (ICR) on the F-22 using specialized painting robots in Building 674 at Hill AFB. The F-22 Coating Robots and Control Consoles are used to apply the specialized coatings stack-up within the aircraft inlets and are essential to the F-22’s low observable characteristics. Contractor support is required to keep the F-22 Coating Robots and Control Consoles maintained, supplied, and fully operational.