16292 Steam Boiler Replacement

Total Small Business Set-Aside (FAR 19.5)
Notice ID:FA822226Q3345

Upgrade the existing heating infrastructure in building 1515 on Hill AFB in accordance with the Statment of Work. The objective is to transition from the current steam heat exchanger system to a more ...

16292 Steam Boiler Replacement

Total Small Business Set-Aside (FAR 19.5)
Notice ID:FA822226Q3345

Upgrade the existing heating infrastructure in building 1515 on Hill AFB in accordance with the Statment of Work. The objective is to transition from the current steam heat exchanger system to a more ...

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8222 AFSC PZIE
  PSC   J045 MAINT/REPAIR/REBUILD OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT
LOCATION: Not Given
Primary Contact
Jonathan Graham
801-***-3365

Links (0)

Attachments (21)

Document
Size
Access
Updated
A001 - Conceptual Design Drawings Models DI-SESS-8100E.pdf
55.57 KB
Public
Sep 29, 2026
A005 - System Safety Program Plan DI-SAFT-81626.pdf
55.61 KB
Public
Sep 29, 2026
A004 - As Built Configuration List DI-SESS-81830.pdf
55.57 KB
Public
Sep 29, 2026
A006 - Accident-Incident Report DI-SAFT-81563.pdf
55.54 KB
Public
Sep 29, 2026
A003 - Quality Assurance Program Plan (QAPP) DI-QCIC-81794B.pdf
55.59 KB
Public
Sep 29, 2026
A002 - System - Subsystem Specification (SSS) DI-ISPC-81431A.pdf
55.56 KB
Public
Sep 29, 2026
Phase 2 as-built mechanical.pdf
15.32 MB
Public
Sep 29, 2026
Phase 1 as-built mechanical.pdf
2.5 MB
Public
Sep 29, 2026
Pages from FY06 FY07 As-Builts Vol 2.pdf
1.81 MB
Public
Sep 29, 2026
G14_Hill_AFB_IFS_Electrical.pdf
399.86 KB
Public
Sep 29, 2026
G10_Hill_AFB_IFS_Natural_Gas_LPG.pdf
207.58 KB
Public
Sep 29, 2026
G07_Hill_AFB_IFS_Mechanical_Systems_Design_Requirements.pdf
465.47 KB
Public
Sep 29, 2026
B1515 phases 3 and 4 gas lines.png
297.9 KB
Public
Sep 29, 2026
B1515 phase 2 gas line.png
253.63 KB
Public
Sep 29, 2026
B1515 phase 1 gas line.png
173.53 KB
Public
Sep 29, 2026
3-inch gas line at B1515.png
1013.24 KB
Public
Sep 29, 2026
RFIs for Bldg 1515.xlsx
32.07 KB
Public
Sep 29, 2026
16292 Boiler Replacement SOW (9-4-26) Final.pdf
646.7 KB
Public
Sep 29, 2026
Bldg- 1515 WT 18773888 Removal of Steam Lines.pdf
290.84 KB
Public
Sep 29, 2026
16292_Wage Determinations.pdf
61.2 KB
Public
Sep 29, 2026
16292 Solicitation Boiler Replacement.pdf
286.88 KB
Public
Sep 29, 2026


Data sourced from SAM.gov. View Official Posting »