Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:FA820624R0599
Pre-solicitation synopsis for the acquisition of the T-38 Gearbox Remanufacture. Required to be a qualified source. NSN 1680-01-440-5106 PN 14-51100-501/503 Applicable Documents and Technical Orders A...
Pre-solicitation synopsis for the acquisition of the T-38 Gearbox Remanufacture. Required to be a qualified source. NSN 1680-01-440-5106 PN 14-51100-501/503 Applicable Documents and Technical Orders ASME Y14.38M - Abbreviations and Acronyms Revision and Redesignation of ASME Y1.1 CAV AF Manual - Commercial Asset Visibility Air Force (Version 8 or higher) MIL-HDBK-1568- Materials and Processes for Corrosion Prevention and Control in Aerospace Systems MIL-STD-130L- Identification Marking of U.S. Military Property TO 00-85B-3- How to package AF spares TO 00-20-1- Aerospace Equipment Maintenance Inspection, Documentation, Policies, and Procedures (1 JUN 2018) TO 00-20-2- Maintenance Data Documentation (15 MAR 2016) TO 00-20-5- Aerospace Vehicle/Equipment Inspection and Documentation TO 00-25-195- Source Maintenance, and Recoverability Coding of Air Force3 Weapons System TO 00-25-234- General Shop Practice Requirements for the Remanufacture Maintenance, and Test of Electrical Equipment (Change 7, 25 MAR 2018) TO 00-25-260- Unique identification Asset Marking and Tracking (15 OCT 2013) TO 00-35D-54- USAF Deficiency Reporting, Investigation, and Resolution TO 00-5-1- AF Technical Order System (16 JUL 2018) TO 00-5-2- AF Technical Order Distribution System TO 00-5-3- AF Technical Order Life Cycle Management TO 1-1-1- Operation Instructions, Cleaning of Aerospace Equipment TO 1-1-2- Corrosion Control and Treatment for Aircraft and Missiles TO 1-1-4- Air Force Standard Exterior Finishes TO 1-1-8- Application and Removal of Organic Coatings Aerospace and Non-Aerospace Equipment TO 1-1A-8- Structural Hardware TO 1-1-691- Aircraft Weapon System Cleaning and Corrosion Control TO 32B14-3-1-101- Torque Indicating Devices TO 33B-1-1- Non-Destructive Inspection Methods, Basic Theory (15 OCT 2018) TO 33B-1-2- Nondestructive Inspection Methods, General Procedures and Process Controls TO 16G2-7-2-3- Technical Manual Drive Assembly (PTO shaft and input/output couplings) TO 16G1-102-2- Technical Manual Intermediate Maintenance TO 16G1-102-3- Technical Manual Overhaul TO 16G1-102-4- Technical Manual, Illustrated Parts Breakdown TO 7J4-2-34-3- Technical Manual Overhaul Instructions for Gearbox Internal Oil Pump Assembly and/or supporting technical data and drawing. Expected solictation date: August 2024 Expected award date: September 2024 May award one or more contracts at 40 units each. Performance Period: Basic contract and two option terms expected, shall not exceed a total contract period of 24 months. Synopsis Amendment Summary: Add: Part Number and Technical Order Requirements. Correct: Part Number - an additional 1 was included in the part number initially. Add: Expected period of performance with options. Update the following statement, Will award one or two contracts at 40 units each, with, May award one or more contracts at 40 units each.