**Cancelled** | TAFB MACC-BOA | Formal RFP for WWYK240146 - Design & Implement Monitoring & Control System for IWCS, Bldg. 62516
The posting states that the Design & Implement Monitoring & Control System for IWCS at Building 62516, Tinker Air Force Base, Oklahoma, has been cancelled because funding is not anticipated in early FY2027, and it may be resolicited if funding later becomes available. The order is limited to current MACC-BOA holders and would require design, furnishing, installation, testing, and verification of a complete monitoring and control system, including site investigation and field verification of existing conditions. The contractor would be responsible for identifying necessary logistical, architectural, and structural work elements and providing a fully operating system ready for Government use. A mandatory site visit is scheduled for June 1, 2026 at 10:00 AM at the project performance site, and personnel working on flight lines, runways, taxiways, ramps, hangars, or maintenance areas must complete FOD awareness training. The posting also contains formal RFP/amendment material, including RFI responses and additional documents, and the amended scope is limited exclusively to the four lift stations identified in the Statement of Work and IFC drawings.