TAFB MACC-BOA | Formal RFP for WWYK050751 - Repair/Replace Main Distribution & Branch Panel Boards, Bldg. 6002

Total Small Business Set-Aside (FAR 19.5)
Notice ID:FA813726R0038

This opportunity is a construction-only order to repair and replace main distribution and branch panel boards in Building 6002 at Tinker Air Force Base, Oklahoma. It is only available to current MACC-BOA holders. A mandatory site visit is scheduled for June 3, 2026, with an RSVP deadline of May 22, 2026. The proposal due date is July 3, 2026, though it may be extended. No budget amount is specified.

TAFB MACC-BOA | Formal RFP for WWYK050751 - Repair/Replace Main Distribution & Branch Panel Boards, Bldg. 6002

Total Small Business Set-Aside (FAR 19.5)
Notice ID:FA813726R0038

This opportunity is a construction-only order to repair and replace main distribution and branch panel boards in Building 6002 at Tinker Air Force Base, Oklahoma. A mandatory site visit is scheduled for June 3, 2026, with RSVPs required by May 22, 2026. The contractor must furnish all materials, labor, and equipment, and perform a site investigation to verify existing conditions. No specific budget amount is provided in the description. The performance location is Tinker Air Force Base, Oklahoma.

TAFB MACC-BOA | Formal RFP for WWYK050751 - Repair/Replace Main Distribution & Branch Panel Boards, Bldg. 6002

Total Small Business Set-Aside (FAR 19.5)
Notice ID:FA813726R0038

This opportunity is a construction-only order for the repair and replacement of main distribution and branch panel boards in Building 6002 at Tinker Air Force Base, Oklahoma. It is only available to current MACC-BOA holders. A mandatory site visit is scheduled for June 3, 2026, with an RSVP deadline of May 22, 2026. The proposal due date is July 3, 2026, though it may be extended. No budget amount is specified.

TAFB MACC-BOA | Initial Site Visit for WWYK050751 - Repair/Replace Main Distribution & Branch Panel Boards, Bldg. 6002

Inactive Total Small Business Set-Aside (FAR 19.5)
Notice ID:FA813726R0038

This opportunity is a construction-only order for the repair and replacement of main distribution and branch panel boards in Building 6002 at Tinker Air Force Base (AFB), Oklahoma. The contractor must furnish all materials, labor, and equipment, and is required to perform a site investigation to verify existing conditions. A mandatory site visit is scheduled for June 3rd, 2026, at 10:00 A.M. at the project performance site, with RSVPs due by 11:59 PM CST on Friday, May 22nd, 2026. No budget amount is specified in the description. The work does not involve flight lines or aircraft areas, but all personnel must receive FOD awareness training.

TAFB MACC-BOA | Formal RFP for WWYK050751 - Repair/Replace Main Distribution & Branch Panel Boards, Bldg. 6002

Total Small Business Set-Aside (FAR 19.5)
Notice ID:FA813726R0038

This opportunity is a construction-only order to repair and replace main distribution and branch panel boards in Building 6002 at Tinker Air Force Base, Oklahoma. A mandatory site visit is scheduled for June 3, 2026, with RSVPs required by May 22, 2026. The contractor must furnish all materials, labor, and equipment, and is responsible for field verification of existing conditions. No budget amount is specified in the description. The performance location is Tinker Air Force Base, Oklahoma.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8137 AFSC PZIOC
  PSC   Z2JZ REPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS


Data sourced from SAM.gov. View Official Posting »

TAFB MACC-BOA | Initial Site Visit for WWYK050751 - Repair/Replace Main Distribution & Branch Panel Boards, Bldg. 6002

Total Small Business Set-Aside (FAR 19.5)
Notice ID:FA813726R0038

This opportunity is a construction-only order for the repair and replacement of main distribution and branch panel boards in Building 6002 at Tinker Air Force Base, Oklahoma. It is exclusively available to current MACC-BOA holders. A mandatory site visit is scheduled for June 3rd, 2026, at 10:00 A.M. at the project site, with RSVPs required by May 22nd, 2026. The contractor must furnish all materials, labor, and equipment, and is responsible for field verification of existing conditions and providing any necessary components for a fully operational system. No specific budget amount is mentioned in the description.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8137 AFSC PZIOC
  PSC   Z2JZ REPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS


Data sourced from SAM.gov. View Official Posting »