Inactive
Notice ID:FA812624Q0004
The Contractor shall provide all labor, tools, equipment, test equipment, material, parts, quality control, transportation, and inspection manuals necessary to provide a One-Time Repair on the Dynapow...
The Contractor shall provide all labor, tools, equipment, test equipment, material, parts, quality control, transportation, and inspection manuals necessary to provide a One-Time Repair on the Dynapower Control Unit to include new interface board and wiring for the Oklahoma City–Air Logistics Complex (OC-ALC). The equipment is listed in Appendix A. The Contractor shall be responsible for ensuring all services, parts, and Original Equipment Manufacturer (OEM) components provided under this contract are in accordance with (IAW) the terms and conditions outlined herein, conform to the manufacturer’s equipment specifications and the PWS.