Inactive
Notice ID:FA812522Q0011
B-52 Nose Cowl FOD Removal Fixture Fabricate two (2) X201961718 "B-52 Engine Nose Cowl FOD Removal Fixture" per drawing. The first article shall be made as a prototype. The second article shall be fab...
B-52 Nose Cowl FOD Removal Fixture Fabricate two (2) X201961718 "B-52 Engine Nose Cowl FOD Removal Fixture" per drawing. The first article shall be made as a prototype. The second article shall be fabricated only after Engineering has validated and verified (val/ver) the first article and made any necessary changes to the design of the fixture. An updated drawing will be furnished to the contractor if changes are made. The second article shall be delivered no more than sixty (60) days after Engineering has val/ver'd the first. Engineering shall val/ver the first article within thirty (30) days after delivery. Deliver fully assembled or the contractor shall fully assemble the fixtures upon delivery on-site. All substitutions or deviations from drawing must be approved by Technical POC (Engineering). Delivery shall be directly to Building 2121, addressed to the 565th AMXS Tool Crib. Contractor must have access to all standards or specifications referenced in the drawing. For the purposes of the correction of fabrication errors and/or discussion of design changes, the contractor shall be available for no more than three (3) on-site visits of one business day or less. Any operations manuals, technical information, instruction guidance, etc. included with Consumer Off-The-Shelf (COTS) items on the fixtures shall be furnished by the contractor to Engineering. Please read all attachments!