Inactive
Notice ID:FA8122-20-R-0012
This requirement is for Remanufacture of F108 Compressor Inlet Temperature (CIT) Sensor The Government plans to award a Firm Fixed Price (FFP) Requirements type remanufacturing supply contract, consis...
This requirement is for Remanufacture of F108 Compressor Inlet Temperature (CIT) Sensor The Government plans to award a Firm Fixed Price (FFP) Requirements type remanufacturing supply contract, consisting of a 1-year basic ordering period and four 1-year ordering period options, for a total contract ordering period of 5-years (60 months). The proposed contract is anticipated to be a SOLE SOURCE AWARD, in accordance with (IAW) FAR 6.302-1(a)(2) - Only One Responsible Source. Award will be made only if the offeror meets the qualification requirements at the time of award IAW FAR clause 52.209-1 and 6.302-5(b)(5). As stated in para 6. above, the Contract award is anticipated to be a sole-source award to the qualified contractor, Woodward, Inc (CAGE: 66503) Award will not be delayed to allow another offeror completion of qualification requirements/process. However, interested entities may identify their interest and capability to respond to the requirement or submit their proposal awaiting approval of their source approval request (SAR) package. Offeror shall complete the Pricing Matrix (Attachment 1). Offeror must ensure all required proposed pricing is provided, ensuring all ordering periods are priced. These consist of a 1-year basic ordering period and four 1-year ordering period optionsfor the remanufacture effort (CLINs 0001-4001 and 0003-4003). Any omission of required pricing may result in an unfavorable proposal evaluation. An incomplete Pricing Matrix (Attachment 1) will be considered unreasonable. In Accordance With (IAW) FAR 16.503(c) GOVERNMENT PROPERTY FURNISHED FOR REPAIR - When a requirements contract is used to acquire work on existing items of Government property, the Contracting Officer shall specify in the schedule that failure of the Government to furnish such items in the amounts or quantities described in the Schedule as "estimated" or "maximum" will not entitle the contractor to any equitable adjustment in price under the Government Property clause of the contract. No Government Furnished Material (GFM) shall be provided. Contractor Furnished Material (CFM) is required for all remanufactuing described herein. The Contractor shall furnish and deliver to the Government the services and supplies necessary to perform the following IAW the Terms and Conditions contained in this contract. Upon receipt of an order, the Contractor shall furnish all plant, labor, equipment and technical expertise to perform remanfucature services desribed herein. In addition, the Contractor shall furnish those materials and parts contemplated in any attachments as may be further defined herein. All such items as may be set forth on order issued by the Government hereunder shall be remanufactured, modified, tested and prepared for storage and shipped to the Government as a completely serviceable item. Some of the unites listed below, upon disassembly and/or inspection, can be determined to be beyond repairable limits specified in the work specifications and/or technical orders. Any cost for work performed by the Contractor, prior to determination that such equipment is beyond repairable limits shall be included in the price of the listed item. Condemnations shall be replaced and will not be counted as production. Accelerated delivery is desirable and acceptable. Proposals are due no later than (NLT) 04 Aug 2020 at 3:00PM CST. Amendment - 3 Aug 2020: Proposals are due no later than (NLT) 07 Aug 2020 at 3:00PM CST.