KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This opportunity is for the KC-135 Center Console Refresh (CCR) Revision 2 program, with performance expected at Tinker Air Force Base. The Government has released a Draft RFP, Draft SOW, and Draft SRD, with a Full RFP release currently expected in May 2026. All questions and communications must be directed in writing solely to the Contracting Officer, Brandi Shelden. Key documents, including draft solicitations, pricing workbooks, and Q&A responses, have been uploaded to the Bidder’s Library. An Industry Day and aircraft tour were held in March 2026 to provide further details.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Catina Baker
Not Given

Links (0)

Attachments (129)

Document
Size
Access
Updated
KC-135 CCR Questions for Industry Day 2026.03.16.pdf
653.23 KB
Controlled
May 28, 2026
Draft Solicitation - FA810526RB001 21 May 26.pdf
22.86 MB
Public
May 26, 2026
Attachment 2. (CUI) KC-135 CCR SRD.pdf
1.22 MB
Controlled
May 26, 2026
5. Attachment 5. KC-135 CCR DRAFT Section M - Evaluation Factors for Award.pdf
773.78 KB
Public
May 21, 2026
4. Attachment 4. KC-135 CCR DRAFT Section L - Instructions to Offerors (1).pdf
1.24 MB
Public
May 21, 2026
3. ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB UPDATED (P) - Draft.xlsx
407.39 KB
Public
May 21, 2026
3. ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME - UPDATED (P) - Draft.xlsx
468.92 KB
Public
May 21, 2026
1. (CUI) KC-135 CCR Revision 2 DRAFT Statement of Work (SOW).pdf
1.45 MB
Controlled
May 21, 2026
(CUI) DRAFT RFP Round Two.pdf
214.66 KB
Controlled
May 21, 2026
B45 ELA 818-3812-001_Rev_A (2).pdf
225.68 KB
Controlled
May 11, 2026
CUI KC-135 CCR Industry Day Responses-3.pdf
400.75 KB
Controlled
May 7, 2026
TO 00-5-16.pdf
2.72 MB
Controlled
May 5, 2026
In Person Industry Day Measurements KC-135 CCR Memo 05May2026.pdf
255.07 KB
Controlled
May 5, 2026
In Person Industry Day Pictures KC-135 CCR Memo 22Mar26 No Sign.pdf
222.91 KB
Controlled
Apr 28, 2026
(U) AFRL MBSE Style Guide v2-1.zip
13.93 MB
Controlled
Apr 23, 2026
(U) AFRL MBSE Style Guide v2-1.docx
14.33 MB
Controlled
Apr 23, 2026
(CUI) FA8105 CCR Rev2 Draft SOW RFI Response-3.pdf
486.39 KB
Controlled
Apr 15, 2026
(CUI) FA8105 CCR Rev2 Draft SRD RFI Response-3.pdf
319.42 KB
Controlled
Apr 15, 2026
CUI KC-135 CCR Industry Day Responses-2.pdf
585.31 KB
Controlled
Apr 15, 2026
Tinker PDM Aircraft Tour for KC-135 CCR.pdf
204.38 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Responses.pdf
357.27 KB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This opportunity is for the KC-135 Center Console Refresh (CCR) Revision 2 program, managed by the Air Force at Tinker Air Force Base. The government has released a Draft RFP, along with draft SOW, SRD, and pricing workbooks, and has conducted industry engagement including an Industry Day and aircraft tour. The full RFP release is currently expected in May 2026. Performance of services will be at Tinker Air Force Base. No specific budget amount has been provided.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Catina Baker
Not Given

Links (0)

Attachments (129)

Document
Size
Access
Updated
KC-135 CCR Questions for Industry Day 2026.03.16.pdf
653.23 KB
Controlled
May 28, 2026
Draft Solicitation - FA810526RB001 21 May 26.pdf
22.86 MB
Public
May 26, 2026
Attachment 2. (CUI) KC-135 CCR SRD.pdf
1.22 MB
Controlled
May 26, 2026
5. Attachment 5. KC-135 CCR DRAFT Section M - Evaluation Factors for Award.pdf
773.78 KB
Public
May 21, 2026
4. Attachment 4. KC-135 CCR DRAFT Section L - Instructions to Offerors (1).pdf
1.24 MB
Public
May 21, 2026
3. ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB UPDATED (P) - Draft.xlsx
407.39 KB
Public
May 21, 2026
3. ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME - UPDATED (P) - Draft.xlsx
468.92 KB
Public
May 21, 2026
1. (CUI) KC-135 CCR Revision 2 DRAFT Statement of Work (SOW).pdf
1.45 MB
Controlled
May 21, 2026
(CUI) DRAFT RFP Round Two.pdf
214.66 KB
Controlled
May 21, 2026
B45 ELA 818-3812-001_Rev_A (2).pdf
225.68 KB
Controlled
May 11, 2026
CUI KC-135 CCR Industry Day Responses-3.pdf
400.75 KB
Controlled
May 7, 2026
TO 00-5-16.pdf
2.72 MB
Controlled
May 5, 2026
In Person Industry Day Measurements KC-135 CCR Memo 05May2026.pdf
255.07 KB
Controlled
May 5, 2026
In Person Industry Day Pictures KC-135 CCR Memo 22Mar26 No Sign.pdf
222.91 KB
Controlled
Apr 28, 2026
(U) AFRL MBSE Style Guide v2-1.zip
13.93 MB
Controlled
Apr 23, 2026
(U) AFRL MBSE Style Guide v2-1.docx
14.33 MB
Controlled
Apr 23, 2026
(CUI) FA8105 CCR Rev2 Draft SOW RFI Response-3.pdf
486.39 KB
Controlled
Apr 15, 2026
(CUI) FA8105 CCR Rev2 Draft SRD RFI Response-3.pdf
319.42 KB
Controlled
Apr 15, 2026
CUI KC-135 CCR Industry Day Responses-2.pdf
585.31 KB
Controlled
Apr 15, 2026
Tinker PDM Aircraft Tour for KC-135 CCR.pdf
204.38 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Responses.pdf
357.27 KB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This opportunity is for the KC-135 Center Console Refresh (CCR) Revision 2 program, with performance expected at Tinker Air Force Base. The Draft RFP was released in February 2026, and the full RFP release is currently expected in May 2026. An Industry Day and aircraft tour were held in March 2026 at Tinker AFB. The government has released draft Statements of Work, System Requirements Documents, and pricing workbooks, and has provided responses to industry questions. No specific budget amount is mentioned in the description.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Catina Baker
Not Given

Links (0)

Attachments (128)

Document
Size
Access
Updated
Draft Solicitation - FA810526RB001 21 May 26.pdf
22.86 MB
Public
May 26, 2026
Attachment 2. (CUI) KC-135 CCR SRD.pdf
1.22 MB
Controlled
May 26, 2026
5. Attachment 5. KC-135 CCR DRAFT Section M - Evaluation Factors for Award.pdf
773.78 KB
Public
May 21, 2026
4. Attachment 4. KC-135 CCR DRAFT Section L - Instructions to Offerors (1).pdf
1.24 MB
Public
May 21, 2026
3. ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB UPDATED (P) - Draft.xlsx
407.39 KB
Public
May 21, 2026
3. ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME - UPDATED (P) - Draft.xlsx
468.92 KB
Public
May 21, 2026
1. (CUI) KC-135 CCR Revision 2 DRAFT Statement of Work (SOW).pdf
1.45 MB
Controlled
May 21, 2026
(CUI) DRAFT RFP Round Two.pdf
214.66 KB
Controlled
May 21, 2026
B45 ELA 818-3812-001_Rev_A (2).pdf
225.68 KB
Controlled
May 11, 2026
CUI KC-135 CCR Industry Day Responses-3.pdf
400.75 KB
Controlled
May 7, 2026
TO 00-5-16.pdf
2.72 MB
Controlled
May 5, 2026
In Person Industry Day Measurements KC-135 CCR Memo 05May2026.pdf
255.07 KB
Controlled
May 5, 2026
In Person Industry Day Pictures KC-135 CCR Memo 22Mar26 No Sign.pdf
222.91 KB
Controlled
Apr 28, 2026
(U) AFRL MBSE Style Guide v2-1.zip
13.93 MB
Controlled
Apr 23, 2026
(U) AFRL MBSE Style Guide v2-1.docx
14.33 MB
Controlled
Apr 23, 2026
(CUI) FA8105 CCR Rev2 Draft SOW RFI Response-3.pdf
486.39 KB
Controlled
Apr 15, 2026
(CUI) FA8105 CCR Rev2 Draft SRD RFI Response-3.pdf
319.42 KB
Controlled
Apr 15, 2026
CUI KC-135 CCR Industry Day Responses-2.pdf
585.31 KB
Controlled
Apr 15, 2026
Tinker PDM Aircraft Tour for KC-135 CCR.pdf
204.38 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Responses.pdf
357.27 KB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This opportunity is for the KC-135 Center Console Refresh (CCR) Revision 2 program, with performance expected at Tinker Air Force Base. The Draft RFP was released in February 2026, and the full RFP release is currently expected in May 2026. An Industry Day and aircraft tour were held in March and April 2026 to provide further details. The government has released draft Statements of Work, System Requirements Documents, and pricing workbooks for review. No specific budget amount is mentioned in the description.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Catina Baker
Not Given

Links (0)

Attachments (121)

Document
Size
Access
Updated
(CUI) DRAFT RFP Round Two.pdf
214.66 KB
Controlled
May 21, 2026
B45 ELA 818-3812-001_Rev_A (2).pdf
225.68 KB
Controlled
May 11, 2026
CUI KC-135 CCR Industry Day Responses-3.pdf
400.75 KB
Controlled
May 7, 2026
TO 00-5-16.pdf
2.72 MB
Controlled
May 5, 2026
In Person Industry Day Measurements KC-135 CCR Memo 05May2026.pdf
255.07 KB
Controlled
May 5, 2026
In Person Industry Day Pictures KC-135 CCR Memo 22Mar26 No Sign.pdf
222.91 KB
Controlled
Apr 28, 2026
(U) AFRL MBSE Style Guide v2-1.zip
13.93 MB
Controlled
Apr 23, 2026
(U) AFRL MBSE Style Guide v2-1.docx
14.33 MB
Controlled
Apr 23, 2026
(CUI) FA8105 CCR Rev2 Draft SOW RFI Response-3.pdf
486.39 KB
Controlled
Apr 15, 2026
(CUI) FA8105 CCR Rev2 Draft SRD RFI Response-3.pdf
319.42 KB
Controlled
Apr 15, 2026
CUI KC-135 CCR Industry Day Responses-2.pdf
585.31 KB
Controlled
Apr 15, 2026
Tinker PDM Aircraft Tour for KC-135 CCR.pdf
204.38 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Responses.pdf
357.27 KB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This opportunity is for the KC-135 Center Console Refresh (CCR) Revision 2 program, with performance expected at Tinker Air Force Base. The Draft RFP was released in February 2026, and the full RFP release is currently expected in May 2026. An Industry Day and aircraft tour were held in March and April 2026 to provide further details. The government has released draft Statements of Work, System Requirements Documents, and pricing workbooks for review. No specific budget amount has been provided in this description.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Catina Baker
Not Given

Links (0)

Attachments (128)

Document
Size
Access
Updated
Draft Solicitation - FA810526RB001 21 May 26 (1).pdf
39.98 MB
Public
May 21, 2026
5. Attachment 5. KC-135 CCR DRAFT Section M - Evaluation Factors for Award.pdf
773.78 KB
Public
May 21, 2026
4. Attachment 4. KC-135 CCR DRAFT Section L - Instructions to Offerors (1).pdf
1.24 MB
Public
May 21, 2026
3. ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB UPDATED (P) - Draft.xlsx
407.39 KB
Public
May 21, 2026
3. ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME - UPDATED (P) - Draft.xlsx
468.92 KB
Public
May 21, 2026
2. Attachment 2. (CUI) KC-135 CCR DRAFT SRD.pdf
1.54 MB
Controlled
May 21, 2026
1. (CUI) KC-135 CCR Revision 2 DRAFT Statement of Work (SOW).pdf
1.45 MB
Controlled
May 21, 2026
(CUI) DRAFT RFP Round Two.pdf
214.66 KB
Controlled
May 21, 2026
B45 ELA 818-3812-001_Rev_A (2).pdf
225.68 KB
Controlled
May 11, 2026
CUI KC-135 CCR Industry Day Responses-3.pdf
400.75 KB
Controlled
May 7, 2026
TO 00-5-16.pdf
2.72 MB
Controlled
May 5, 2026
In Person Industry Day Measurements KC-135 CCR Memo 05May2026.pdf
255.07 KB
Controlled
May 5, 2026
In Person Industry Day Pictures KC-135 CCR Memo 22Mar26 No Sign.pdf
222.91 KB
Controlled
Apr 28, 2026
(U) AFRL MBSE Style Guide v2-1.zip
13.93 MB
Controlled
Apr 23, 2026
(U) AFRL MBSE Style Guide v2-1.docx
14.33 MB
Controlled
Apr 23, 2026
(CUI) FA8105 CCR Rev2 Draft SOW RFI Response-3.pdf
486.39 KB
Controlled
Apr 15, 2026
(CUI) FA8105 CCR Rev2 Draft SRD RFI Response-3.pdf
319.42 KB
Controlled
Apr 15, 2026
CUI KC-135 CCR Industry Day Responses-2.pdf
585.31 KB
Controlled
Apr 15, 2026
Tinker PDM Aircraft Tour for KC-135 CCR.pdf
204.38 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Responses.pdf
357.27 KB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

The U.S. Air Force seeks turn-key solutions to replace and improve the KC-135’s Fuel System, Flight Display System, and Flight Computer, including the addition of autothrottle systems, to address obsolescence and enable future growth. The anticipated contract is a single award, indefinite delivery/quantity type with a Cost-Plus Incentive Fee for EMD and Firm Fixed Price for Production and Deployment. The performance period is projected from August 2027 to August 2037, comprising a 48-month base period and six 1-year option periods. Performance location is not specified. No budget amount is provided.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Catina Baker
Not Given

Links (0)

Attachments (0)


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

The U.S. Air Force seeks innovative, turn-key solutions to replace and improve the KC-135’s Fuel System, Flight Display System, and Flight Computer, including the addition of autothrottle systems, to address obsolescence and enable future growth. The anticipated contract is a single award, indefinite delivery/quantity type with a Cost-Plus Incentive Fee for EMD and Firm Fixed Price for Production and Deployment. The performance period is projected from August 2027 to August 2037, comprising a 48-month base period and six 1-year option periods. Performance location is not specified. No budget amount is provided.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Catina Baker
Not Given

Links (0)

Attachments (0)


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This opportunity is for the KC-135 Center Console Refresh (CCR) Revision 2 program. The draft RFP was released in February 2026, with a full RFP release expected in May 2026. An aircraft tour and Industry Day events were held at Tinker Air Force Base in Oklahoma. The government has released draft Statements of Work, System Requirements Documents, and pricing workbooks for review. No specific budget amount is mentioned in the description.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Catina Baker
Not Given

Links (0)

Attachments (120)

Document
Size
Access
Updated
B45 ELA 818-3812-001_Rev_A (2).pdf
225.68 KB
Controlled
May 11, 2026
CUI KC-135 CCR Industry Day Responses-3.pdf
400.75 KB
Controlled
May 7, 2026
TO 00-5-16.pdf
2.72 MB
Controlled
May 5, 2026
In Person Industry Day Measurements KC-135 CCR Memo 05May2026.pdf
255.07 KB
Controlled
May 5, 2026
In Person Industry Day Pictures KC-135 CCR Memo 22Mar26 No Sign.pdf
222.91 KB
Controlled
Apr 28, 2026
(U) AFRL MBSE Style Guide v2-1.zip
13.93 MB
Controlled
Apr 23, 2026
(U) AFRL MBSE Style Guide v2-1.docx
14.33 MB
Controlled
Apr 23, 2026
(CUI) FA8105 CCR Rev2 Draft SOW RFI Response-3.pdf
486.39 KB
Controlled
Apr 15, 2026
(CUI) FA8105 CCR Rev2 Draft SRD RFI Response-3.pdf
319.42 KB
Controlled
Apr 15, 2026
CUI KC-135 CCR Industry Day Responses-2.pdf
585.31 KB
Controlled
Apr 15, 2026
Tinker PDM Aircraft Tour for KC-135 CCR.pdf
204.38 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Responses.pdf
357.27 KB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This opportunity is for the KC-135 Center Console Refresh (CCR) Revision 2 program, with performance expected at Tinker Air Force Base. The draft RFP was released in February 2026, and the full RFP release is currently expected in May 2026. The government has conducted multiple industry engagements, including virtual industry days and an aircraft tour at Tinker AFB. No specific budget amount has been provided in the description. The program involves refreshing the center console of the KC-135 aircraft, with draft statements of work and system requirements documents already released for industry review.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Catina Baker
Not Given

Links (0)

Attachments (119)

Document
Size
Access
Updated
CUI KC-135 CCR Industry Day Responses-3.pdf
400.75 KB
Controlled
May 7, 2026
TO 00-5-16.pdf
2.72 MB
Controlled
May 5, 2026
In Person Industry Day Measurements KC-135 CCR Memo 05May2026.pdf
255.07 KB
Controlled
May 5, 2026
In Person Industry Day Pictures KC-135 CCR Memo 22Mar26 No Sign.pdf
222.91 KB
Controlled
Apr 28, 2026
(U) AFRL MBSE Style Guide v2-1.zip
13.93 MB
Controlled
Apr 23, 2026
(U) AFRL MBSE Style Guide v2-1.docx
14.33 MB
Controlled
Apr 23, 2026
(CUI) FA8105 CCR Rev2 Draft SOW RFI Response-3.pdf
486.39 KB
Controlled
Apr 15, 2026
(CUI) FA8105 CCR Rev2 Draft SRD RFI Response-3.pdf
319.42 KB
Controlled
Apr 15, 2026
CUI KC-135 CCR Industry Day Responses-2.pdf
585.31 KB
Controlled
Apr 15, 2026
Tinker PDM Aircraft Tour for KC-135 CCR.pdf
204.38 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Responses.pdf
357.27 KB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This opportunity is for the KC-135 Center Console Refresh (CCR) Revision 2 program, with performance expected at Tinker Air Force Base. The draft RFP was released in February 2026, and the full RFP release is currently expected in May 2026. An Industry Day and aircraft tour were held in March and April 2026 at Tinker AFB. No specific budget amounts are mentioned in the description. The government has released draft Statements of Work, System Requirements Documents, and pricing workbooks to support industry preparation.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (120)

Document
Size
Access
Updated
(CUI) KC-135 CCR Baseline Configuration.pdf
590.08 KB
Controlled
May 6, 2026
TO 00-5-16.pdf
2.72 MB
Controlled
May 5, 2026
(CUI) KC-135 CCR Baseline Configuration.pptx (deleted)
647.5 KB
Controlled
May 5, 2026
In Person Industry Day Measurements KC-135 CCR Memo 05May2026.pdf
255.07 KB
Controlled
May 5, 2026
In Person Industry Day Pictures KC-135 CCR Memo 22Mar26 No Sign.pdf
222.91 KB
Controlled
Apr 28, 2026
(U) AFRL MBSE Style Guide v2-1.zip
13.93 MB
Controlled
Apr 23, 2026
(U) AFRL MBSE Style Guide v2-1.docx
14.33 MB
Controlled
Apr 23, 2026
(CUI) FA8105 CCR Rev2 Draft SOW RFI Response-3.pdf
486.39 KB
Controlled
Apr 15, 2026
(CUI) FA8105 CCR Rev2 Draft SRD RFI Response-3.pdf
319.42 KB
Controlled
Apr 15, 2026
CUI KC-135 CCR Industry Day Responses-2.pdf
585.31 KB
Controlled
Apr 15, 2026
Tinker PDM Aircraft Tour for KC-135 CCR.pdf
204.38 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Responses.pdf
357.27 KB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This opportunity is for the KC-135 Center Console Refresh (CCR) Revision 2 program, with performance expected at Tinker Air Force Base. The draft RFP was released in February 2026, with the full RFP release currently expected in May 2026. The government has conducted multiple industry engagements, including virtual industry days and an aircraft tour at Tinker AFB. No specific budget amount has been provided in the description. The program involves a refresh of the KC-135 center console, with draft statements of work and system requirements documents available for review.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Catina Baker
Not Given

Links (0)

Attachments (120)

Document
Size
Access
Updated
CUI KC-135 CCR Industry Day Responses-3.pdf
411.32 KB
Controlled
May 6, 2026
(CUI) KC-135 CCR Baseline Configuration.pdf
590.08 KB
Controlled
May 6, 2026
TO 00-5-16.pdf
2.72 MB
Controlled
May 5, 2026
In Person Industry Day Measurements KC-135 CCR Memo 05May2026.pdf
255.07 KB
Controlled
May 5, 2026
In Person Industry Day Pictures KC-135 CCR Memo 22Mar26 No Sign.pdf
222.91 KB
Controlled
Apr 28, 2026
(U) AFRL MBSE Style Guide v2-1.zip
13.93 MB
Controlled
Apr 23, 2026
(U) AFRL MBSE Style Guide v2-1.docx
14.33 MB
Controlled
Apr 23, 2026
(CUI) FA8105 CCR Rev2 Draft SOW RFI Response-3.pdf
486.39 KB
Controlled
Apr 15, 2026
(CUI) FA8105 CCR Rev2 Draft SRD RFI Response-3.pdf
319.42 KB
Controlled
Apr 15, 2026
CUI KC-135 CCR Industry Day Responses-2.pdf
585.31 KB
Controlled
Apr 15, 2026
Tinker PDM Aircraft Tour for KC-135 CCR.pdf
204.38 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Responses.pdf
357.27 KB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This opportunity is for the KC-135 Center Console Refresh (CCR) Revision 2 program, with performance expected at Tinker Air Force Base. The draft solicitation and supporting documents have been released, with the full RFP release currently expected in May 2026. The government has conducted multiple industry engagements, including virtual industry days and an aircraft tour at Tinker AFB. No specific budget amount has been provided in the description.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Catina Baker
Not Given

Links (0)

Attachments (119)

Document
Size
Access
Updated
CUI KC-135 CCR Industry Day Responses-3.pdf
399.73 KB
Controlled
May 6, 2026
TO 00-5-16.pdf
2.72 MB
Controlled
May 5, 2026
In Person Industry Day Measurements KC-135 CCR Memo 05May2026.pdf
255.07 KB
Controlled
May 5, 2026
In Person Industry Day Pictures KC-135 CCR Memo 22Mar26 No Sign.pdf
222.91 KB
Controlled
Apr 28, 2026
(U) AFRL MBSE Style Guide v2-1.zip
13.93 MB
Controlled
Apr 23, 2026
(U) AFRL MBSE Style Guide v2-1.docx
14.33 MB
Controlled
Apr 23, 2026
(CUI) FA8105 CCR Rev2 Draft SOW RFI Response-3.pdf
486.39 KB
Controlled
Apr 15, 2026
(CUI) FA8105 CCR Rev2 Draft SRD RFI Response-3.pdf
319.42 KB
Controlled
Apr 15, 2026
CUI KC-135 CCR Industry Day Responses-2.pdf
585.31 KB
Controlled
Apr 15, 2026
Tinker PDM Aircraft Tour for KC-135 CCR.pdf
204.38 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Responses.pdf
357.27 KB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

The KC-135 Center Console Refresh (CCR) Revision 2 program is a government opportunity to modernize the aircraft's center console. Performance of services will be at Tinker Air Force Base (TAFB). The draft RFP was released in February 2026, with a full RFP release expected in May 2026. An Industry Day and aircraft tour were held in March and April 2026. No specific budget amounts were mentioned in the description.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (117)

Document
Size
Access
Updated
In Person Industry Day Measurements KC-135 CCR Memo 05May2026.pdf
255.07 KB
Controlled
May 5, 2026
In Person Industry Day Pictures KC-135 CCR Memo 22Mar26 No Sign.pdf
222.91 KB
Controlled
Apr 28, 2026
(U) AFRL MBSE Style Guide v2-1.zip
13.93 MB
Controlled
Apr 23, 2026
(U) AFRL MBSE Style Guide v2-1.docx
14.33 MB
Controlled
Apr 23, 2026
(CUI) FA8105 CCR Rev2 Draft SOW RFI Response-3.pdf
486.39 KB
Controlled
Apr 15, 2026
(CUI) FA8105 CCR Rev2 Draft SRD RFI Response-3.pdf
319.42 KB
Controlled
Apr 15, 2026
CUI KC-135 CCR Industry Day Responses-2.pdf
585.31 KB
Controlled
Apr 15, 2026
Tinker PDM Aircraft Tour for KC-135 CCR.pdf
204.38 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Responses.pdf
357.27 KB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

The KC-135 Center Console Refresh (CCR) Revision 2 program is a government opportunity to update the aircraft's center console. The draft solicitation indicates a proposal response due date of 31 July 2026, with the full RFP release currently expected in May 2026. An Industry Day and aircraft tour were held at Tinker Air Force Base (TAFB) in Oklahoma. The government has released draft documents including a Statement of Work (SOW), System Requirements Document (SRD), and pricing workbooks for review. This opportunity involves performance at Tinker AFB and requires interested parties to have an active DD2345 on file for access to controlled documents.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (119)

Document
Size
Access
Updated
TO 00-5-16.pdf
2.72 MB
Controlled
May 5, 2026
(CUI) KC-135 CCR Baseline Configuration.pptx
647.5 KB
Controlled
May 5, 2026
In Person Industry Day Measurements KC-135 CCR Memo 05May2026.pdf
255.07 KB
Controlled
May 5, 2026
In Person Industry Day Pictures KC-135 CCR Memo 22Mar26 No Sign.pdf
222.91 KB
Controlled
Apr 28, 2026
(U) AFRL MBSE Style Guide v2-1.zip
13.93 MB
Controlled
Apr 23, 2026
(U) AFRL MBSE Style Guide v2-1.docx
14.33 MB
Controlled
Apr 23, 2026
(CUI) FA8105 CCR Rev2 Draft SOW RFI Response-3.pdf
486.39 KB
Controlled
Apr 15, 2026
(CUI) FA8105 CCR Rev2 Draft SRD RFI Response-3.pdf
319.42 KB
Controlled
Apr 15, 2026
CUI KC-135 CCR Industry Day Responses-2.pdf
585.31 KB
Controlled
Apr 15, 2026
Tinker PDM Aircraft Tour for KC-135 CCR.pdf
204.38 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Responses.pdf
357.27 KB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This opportunity is for the KC-135 Center Console Refresh (CCR) Revision 2 program, with performance expected at Tinker Air Force Base. The full Request for Proposal (RFP) release is currently expected in May 2026, with a proposal response due date of 31 July 2026. The government has released draft solicitation documents, including a Statement of Work (SOW), System Requirements Document (SRD), and pricing workbooks. An Industry Day and aircraft tour were held in March and April 2026 to engage potential bidders. No specific budget amount has been provided in the description.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (116)

Document
Size
Access
Updated
In Person Industry Day Pictures KC-135 CCR Memo 22Mar26 No Sign.pdf
222.91 KB
Controlled
Apr 28, 2026
(U) AFRL MBSE Style Guide v2-1.zip
13.93 MB
Controlled
Apr 23, 2026
(U) AFRL MBSE Style Guide v2-1.docx
14.33 MB
Controlled
Apr 23, 2026
(CUI) FA8105 CCR Rev2 Draft SOW RFI Response-3.pdf
486.39 KB
Controlled
Apr 15, 2026
(CUI) FA8105 CCR Rev2 Draft SRD RFI Response-3.pdf
319.42 KB
Controlled
Apr 15, 2026
CUI KC-135 CCR Industry Day Responses-2.pdf
585.31 KB
Controlled
Apr 15, 2026
Tinker PDM Aircraft Tour for KC-135 CCR.pdf
204.38 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Responses.pdf
357.27 KB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

The U.S. Air Force is pursuing the KC-135 Center Console Refresh (CCR) Revision 2 program, with performance expected at Tinker Air Force Base. A full Request for Proposals (RFP) release is currently expected in May 2026. The government has released draft solicitation documents, including a Statement of Work, System Requirements Document, and pricing workbooks, with a proposal response due date of 31 July 2026. An Industry Day and aircraft tour were held in March and April 2026 to provide additional information and answer industry questions. No specific budget amount has been disclosed in this description.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (116)

Document
Size
Access
Updated
(U) AFRL MBSE Style Guide v2-1.docx
14.33 MB
Controlled
Apr 23, 2026
(CUI) FA8105 CCR Rev2 Draft SOW RFI Response-3.pdf
486.39 KB
Controlled
Apr 15, 2026
(CUI) FA8105 CCR Rev2 Draft SRD RFI Response-3.pdf
319.42 KB
Controlled
Apr 15, 2026
CUI KC-135 CCR Industry Day Responses-2.pdf
585.31 KB
Controlled
Apr 15, 2026
Tinker PDM Aircraft Tour for KC-135 CCR.pdf
204.38 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Responses.pdf
357.27 KB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
OMG SysML Ver 1.7.pdf
13.45 MB
Controlled
Aug 13, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) AFRL-STO MBSE Style Guide v0.2.pdf
1.98 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This opportunity is for the KC-135 Center Console Refresh (CCR) Revision 2 program, managed by AFLCMC/WLT at Tinker Air Force Base. The government has released draft solicitation documents, including a Statement of Work, System Requirements Document, and pricing workbooks, with a full RFP release currently expected in May 2026. An Industry Day and aircraft tour were held in March 2026 at Tinker AFB, with associated Q&A documents and slides now available. Performance of services will be at Tinker Air Force Base, as indicated by the aircraft tour and contracting office location. No specific budget amounts have been provided in this description.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (116)

Document
Size
Access
Updated
(U) AFRL MBSE Style Guide v2-1.docx
14.33 MB
Controlled
Apr 23, 2026
(CUI) FA8105 CCR Rev2 Draft SOW RFI Response-3.pdf
486.39 KB
Controlled
Apr 15, 2026
(CUI) FA8105 CCR Rev2 Draft SRD RFI Response-3.pdf
319.42 KB
Controlled
Apr 15, 2026
CUI KC-135 CCR Industry Day Responses-2.pdf
585.31 KB
Controlled
Apr 15, 2026
Tinker PDM Aircraft Tour for KC-135 CCR.pdf
204.38 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Responses.pdf
357.27 KB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
OMG SysML Ver 1.7.pdf (deleted)
13.45 MB
Controlled
Aug 13, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) AFRL-STO MBSE Style Guide v0.2.pdf (deleted)
1.98 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This opportunity is for the KC-135 Center Console Refresh (CCR) Revision 2 program, managed by AFLCMC/WLT at Tinker Air Force Base. The government has released draft solicitation documents, including a Statement of Work, System Requirements Document, and pricing workbooks, with a full RFP release currently expected in May 2026. An Industry Day and aircraft tour were held in March 2026 at Tinker AFB, with associated Q&A documents and slides now available. Performance of services will be at Tinker Air Force Base, as indicated by the aircraft tour and contracting office location. No specific budget amounts have been provided in this description.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (115)

Document
Size
Access
Updated
(U) AFRL MBSE Style Guide v2-1.zip
13.93 MB
Controlled
Apr 23, 2026
(U) AFRL MBSE Style Guide v2-1.docx
14.33 MB
Controlled
Apr 23, 2026
(CUI) FA8105 CCR Rev2 Draft SOW RFI Response-3.pdf
486.39 KB
Controlled
Apr 15, 2026
(CUI) FA8105 CCR Rev2 Draft SRD RFI Response-3.pdf
319.42 KB
Controlled
Apr 15, 2026
CUI KC-135 CCR Industry Day Responses-2.pdf
585.31 KB
Controlled
Apr 15, 2026
Tinker PDM Aircraft Tour for KC-135 CCR.pdf
204.38 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Responses.pdf
357.27 KB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This opportunity is for the KC-135 Center Console Refresh (CCR) Revision 2 program. The Government has released a draft solicitation, draft Statement of Work (SOW), draft System Requirements Document (SRD), and pricing workbooks for industry review. An Industry Day and an Aircraft Tour at Tinker Air Force Base have been held as part of market research and engagement. The proposal response due date for the draft solicitation is 31 July 2026.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (115)

Document
Size
Access
Updated
(CUI) FA8105 CCR Rev2 Draft SOW RFI Response-3.pdf
486.39 KB
Controlled
Apr 15, 2026
(CUI) FA8105 CCR Rev2 Draft SRD RFI Response-3.pdf
319.42 KB
Controlled
Apr 15, 2026
CUI KC-135 CCR Industry Day Responses-2.pdf
585.31 KB
Controlled
Apr 15, 2026
Tinker PDM Aircraft Tour for KC-135 CCR.pdf
204.38 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Responses.pdf
357.27 KB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
OMG SysML Ver 1.7.pdf
13.45 MB
Controlled
Aug 13, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) AFRL-STO MBSE Style Guide v0.2.pdf
1.98 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This is a multi-phase KC-135 Center Console Refresh (CCR) Revision 2 program, with a draft solicitation and pricing workbooks currently posted. The proposal response due date is 31 July 2026. The work is associated with Tinker Air Force Base, and an aircraft tour for the program will be held there, concluding by 4:00 p.m. CST. The Government has conducted Industry Days and released numerous draft documents, including the Statement of Work and System Requirements Document, for industry review and feedback.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (112)

Document
Size
Access
Updated
Tinker PDM Aircraft Tour for KC-135 CCR.pdf
204.38 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Responses.pdf
357.27 KB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
OMG SysML Ver 1.7.pdf
13.45 MB
Controlled
Aug 13, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) AFRL-STO MBSE Style Guide v0.2.pdf
1.98 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This is for the KC-135 Center Console Refresh (CCR) Revision 2 program, with a draft solicitation currently posted and updated pricing workbooks available. The proposal response due date is 31 July 2026. The full RFP release is currently expected in May 2026. The program involves multiple Industry Days, including virtual and in-person sessions, with associated charts, minutes, and Q&A documents posted. The Contracting Officer is Ms. Brandi Shelden, and the work is associated with Tinker Air Force Base.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (94)

Document
Size
Access
Updated
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
OMG SysML Ver 1.7.pdf
13.45 MB
Controlled
Aug 13, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) AFRL-STO MBSE Style Guide v0.2.pdf
1.98 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This is for the KC-135 Center Console Refresh (CCR) Revision 2 program, with a draft solicitation currently posted and updated pricing workbooks available. The proposal response due date is 31 July 2026. A full RFP release is expected in May 2026. The program has held multiple Industry Days, including virtual and in-person sessions, with associated charts, minutes, and Q&A documents provided. The Contracting Officer is Ms. Brandi Shelden.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (110)

Document
Size
Access
Updated
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
OMG SysML Ver 1.7.pdf
13.45 MB
Controlled
Aug 13, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) AFRL-STO MBSE Style Guide v0.2.pdf
1.98 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This opportunity is for the KC-135 Center Console Refresh (CCR) Revision 2 program. The Government has released a series of draft documents for industry review, including the Statement of Work, System Requirements Document, pricing workbooks, and solicitation sections. An Industry Day was held, and one-on-one sessions were scheduled. The full RFP release is currently expected in May 2026. The proposal response due date has been updated to 31 July 2026.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (112)

Document
Size
Access
Updated
Tinker PDM Aircraft Tour for KC-135 CCR.pdf
204.38 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Responses.pdf
357.27 KB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
OMG SysML Ver 1.7.pdf
13.45 MB
Controlled
Aug 13, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) AFRL-STO MBSE Style Guide v0.2.pdf
1.98 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Inactive
Notice ID:FA8105_CCR_Rev2

This opportunity is for the KC-135 Center Console Refresh (CCR) Revision 2 program. The Government has released a comprehensive set of draft documents, including the Statement of Work, System Requirements Document, solicitation sections, and pricing workbooks for both primes and subcontractors. A proposal response due date is set for 31 July 2026. The effort involves multiple Industry Day sessions, including one-on-one meetings, with the primary contracting activity being the AFLCMC/WLT branch at Tinker Air Force Base. Updated documents and answers to industry questions are being posted regularly as part of the ongoing market research and solicitation development process.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (93)

Document
Size
Access
Updated
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
OMG SysML Ver 1.7.pdf
13.45 MB
Controlled
Aug 13, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) AFRL-STO MBSE Style Guide v0.2.pdf
1.98 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This opportunity is for the KC-135 Center Console Refresh (CCR) Revision 2 program. An Industry Day with one-on-one sessions is scheduled for March 2026. The draft solicitation has been updated, including pricing workbooks for primes and subcontractors, and the proposal response due date is 31 July 2026. Multiple draft documents, including the Statement of Work, System Requirements Document, and technical orders, have been posted for review. The full RFP is expected to be released in May 2026.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (92)

Document
Size
Access
Updated
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
OMG SysML Ver 1.7.pdf
13.45 MB
Controlled
Aug 13, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) AFRL-STO MBSE Style Guide v0.2.pdf
1.98 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This opportunity is for the KC-135 Center Console Refresh (CCR) Revision 2 program. An Industry Day with one-on-one sessions is scheduled for March 2026. The draft solicitation has been updated, including pricing workbooks for primes and subcontractors, and the proposal response due date is 31 July 2026. Multiple draft documents, including the Statement of Work, System Requirements Document, and technical orders, have been posted for review. The full RFP is expected to be released in May 2026.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (91)

Document
Size
Access
Updated
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
OMG SysML Ver 1.7.pdf
13.45 MB
Controlled
Aug 13, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) AFRL-STO MBSE Style Guide v0.2.pdf
1.98 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This opportunity is for the KC-135 Center Console Refresh (CCR) Revision 2 program. A draft solicitation with updated pricing workbooks and proposal sections is available, and a full RFP release is expected in May 2026. The proposal response due date is 31 July 2026. The performance location is Tinker Air Force Base (TAFB). No budget information is specified.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (91)

Document
Size
Access
Updated
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
OMG SysML Ver 1.7.pdf
13.45 MB
Controlled
Aug 13, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) AFRL-STO MBSE Style Guide v0.2.pdf
1.98 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This is for the KC-135 Center Console Refresh (CCR) Revision 2 program, with a draft solicitation and pricing workbooks now available. The proposal response due date is 31 July 2026. The program involves a series of industry engagements, including an upcoming Industry Day in March 2026 with optional one-on-one sessions, and a full RFP release is expected in May 2026. The work is associated with Tinker Air Force Base. No budget information is specified.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (91)

Document
Size
Access
Updated
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
OMG SysML Ver 1.7.pdf
13.45 MB
Controlled
Aug 13, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) AFRL-STO MBSE Style Guide v0.2.pdf
1.98 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This is an update for the KC-135 Center Console Refresh (CCR) Revision 2 program, noting that draft pricing workbooks and an updated draft solicitation with revised Sections L and M are now available. The program schedule indicates a Draft RFP was released in February 2026, an Industry Day is planned for March 2026, and a full RFP release is expected in May 2026. The work is associated with Tinker Air Force Base. No specific budget amounts are detailed in this update.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (99)

Document
Size
Access
Updated
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME.xlsx (deleted)
592.84 KB
Controlled
Mar 10, 2026
ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB.xlsx (deleted)
472.81 KB
Controlled
Mar 10, 2026
DRAFT Solicitation - FA810526RB001.pdf (deleted)
5.81 MB
Controlled
Mar 10, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors.pdf (deleted)
1.71 MB
Controlled
Mar 10, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award.pdf (deleted)
1.01 MB
Controlled
Mar 10, 2026
MEMO Draft Solicitation FA810526RB001.pdf (deleted)
276.56 KB
Controlled
Mar 4, 2026
KC-135 CCR Industry Day Flyer.pdf (deleted)
815.56 KB
Controlled
Mar 4, 2026
DRAFT Exhibit A (CUI) KC-135 CCR Revision 2 CDRL Package.pdf (deleted)
17.63 MB
Controlled
Mar 4, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf (deleted)
1.77 MB
Controlled
Mar 4, 2026
Attachment 9 -DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf (deleted)
291.83 KB
Controlled
Mar 4, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR).pdf (deleted)
560.33 KB
Controlled
Mar 4, 2026
Attachment 6 - CCR Revision 2 Data Rights Assertion Matrix.pdf (deleted)
585.33 KB
Controlled
Mar 4, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
OMG SysML Ver 1.7.pdf
13.45 MB
Controlled
Aug 13, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) AFRL-STO MBSE Style Guide v0.2.pdf
1.98 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This is an update for the KC-135 Center Console Refresh (CCR) Revision 2 program, announcing that draft pricing workbooks and an updated draft solicitation with revised proposal instructions and evaluation criteria are now available. The program schedule indicates a draft RFP was released at the end of February 2026, with an Industry Day planned for March 2026 and a full RFP release expected in May 2026. Numerous draft documents, including the Statement of Work, System Requirements Document, and technical orders, have been posted for industry review. The program has previously engaged with industry through multiple Requests for Information and a Virtual Industry Day. The work is managed by the C/KC-135 Contracting Branch at Tinker Air Force Base.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (92)

Document
Size
Access
Updated
ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME.xlsx (deleted)
592.84 KB
Controlled
Mar 10, 2026
ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB.xlsx (deleted)
472.81 KB
Controlled
Mar 10, 2026
ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME.xlsx (deleted)
630.5 KB
Controlled
Mar 10, 2026
ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB.xlsx (deleted)
505.5 KB
Controlled
Mar 10, 2026
DRAFT Solicitation - FA810526RB001.pdf (deleted)
5.81 MB
Controlled
Mar 10, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors.pdf (deleted)
1.71 MB
Controlled
Mar 10, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award.pdf (deleted)
1.01 MB
Controlled
Mar 10, 2026
MEMO Draft Solicitation FA810526RB001.pdf (deleted)
276.56 KB
Controlled
Mar 4, 2026
KC-135 CCR Industry Day Flyer.pdf (deleted)
815.56 KB
Controlled
Mar 4, 2026
DRAFT Exhibit A (CUI) KC-135 CCR Revision 2 CDRL Package.pdf (deleted)
17.63 MB
Controlled
Mar 4, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf (deleted)
1.77 MB
Controlled
Mar 4, 2026
Attachment 9 -DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf (deleted)
291.83 KB
Controlled
Mar 4, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR).pdf (deleted)
560.33 KB
Controlled
Mar 4, 2026
Attachment 6 - CCR Revision 2 Data Rights Assertion Matrix.pdf (deleted)
585.33 KB
Controlled
Mar 4, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
OMG SysML Ver 1.7.pdf
13.45 MB
Controlled
Aug 13, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) AFRL-STO MBSE Style Guide v0.2.pdf
1.98 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This is an update for the KC-135 Center Console Refresh (CCR) Revision 2 program, announcing that draft pricing workbooks and an updated draft solicitation with revised proposal instructions and evaluation criteria are now available. The program schedule indicates a draft RFP was released in February 2026, an Industry Day was planned for March 2026, and a full RFP release is expected in May 2026. The work is associated with Tinker Air Force Base. No budget information is specified in this update.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (93)

Document
Size
Access
Updated
ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME.xlsx (deleted)
630.5 KB
Controlled
Mar 10, 2026
ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB.xlsx (deleted)
505.5 KB
Controlled
Mar 10, 2026
DRAFT Solicitation - FA810526RB001.pdf (deleted)
5.81 MB
Controlled
Mar 10, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors.pdf (deleted)
1.71 MB
Controlled
Mar 10, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award.pdf (deleted)
1.01 MB
Controlled
Mar 10, 2026
MEMO Draft Solicitation FA810526RB001.pdf (deleted)
276.56 KB
Controlled
Mar 4, 2026
Draft Solicitation FA810526RB001.pdf (deleted)
1.14 MB
Controlled
Mar 4, 2026
KC-135 CCR Industry Day Flyer.pdf (deleted)
815.56 KB
Controlled
Mar 4, 2026
DRAFT Exhibit A (CUI) KC-135 CCR Revision 2 CDRL Package.pdf (deleted)
17.63 MB
Controlled
Mar 4, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf (deleted)
1.77 MB
Controlled
Mar 4, 2026
Attachment 9 -DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf (deleted)
291.83 KB
Controlled
Mar 4, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR).pdf (deleted)
560.33 KB
Controlled
Mar 4, 2026
Attachment 6 - CCR Revision 2 Data Rights Assertion Matrix.pdf (deleted)
585.33 KB
Controlled
Mar 4, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors.pdf (deleted)
1.56 MB
Public
Feb 27, 2026
Attachment 5 - DRAFT CCR Revision 2 Section M - Evaluation Factors for Award as of 25 Feb.pdf (deleted)
1.02 MB
Public
Feb 27, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
OMG SysML Ver 1.7.pdf
13.45 MB
Controlled
Aug 13, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) AFRL-STO MBSE Style Guide v0.2.pdf
1.98 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This is a draft solicitation for the KC-135 Center Console Refresh (CCR) Revision 2 program, with numerous draft documents including the Statement of Work, System Requirements Document, and proposal instructions posted for industry review. The program schedule indicates a Draft RFP release at the end of February 2026, an Industry Day in March 2026, and a full RFP release expected in May 2026. The work is managed by the C/KC-135 Contracting Branch at Tinker Air Force Base (TAFB). No budget information is specified in this description.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (88)

Document
Size
Access
Updated
MEMO Draft Solicitation FA810526RB001.pdf (deleted)
276.56 KB
Controlled
Mar 4, 2026
Draft Solicitation FA810526RB001.pdf (deleted)
1.14 MB
Controlled
Mar 4, 2026
KC-135 CCR Industry Day Flyer.pdf (deleted)
815.56 KB
Controlled
Mar 4, 2026
DRAFT Exhibit A (CUI) KC-135 CCR Revision 2 CDRL Package.pdf (deleted)
17.63 MB
Controlled
Mar 4, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf (deleted)
1.77 MB
Controlled
Mar 4, 2026
Attachment 9 -DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf (deleted)
291.83 KB
Controlled
Mar 4, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR).pdf (deleted)
560.33 KB
Controlled
Mar 4, 2026
Attachment 6 - CCR Revision 2 Data Rights Assertion Matrix.pdf (deleted)
585.33 KB
Controlled
Mar 4, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors.pdf (deleted)
1.56 MB
Public
Feb 27, 2026
Attachment 5 - DRAFT CCR Revision 2 Section M - Evaluation Factors for Award as of 25 Feb.pdf (deleted)
1.02 MB
Public
Feb 27, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
OMG SysML Ver 1.7.pdf
13.45 MB
Controlled
Aug 13, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) AFRL-STO MBSE Style Guide v0.2.pdf
1.98 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This is a draft solicitation for the KC-135 Center Console Refresh (CCR) Revision 2 program, with key documents like the Statement of Work and System Requirements Document posted for industry review. The program schedule indicates a Draft RFP release at the end of February 2026, an Industry Day in March 2026, and a full RFP release expected in May 2026. The work is managed by the C/KC-135 Contracting Branch at Tinker Air Force Base (TAFB). The government has been actively engaging with industry through multiple Requests for Information and a prior Virtual Industry Day. No budget information is specified in this description.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (82)

Document
Size
Access
Updated
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf (deleted)
2.04 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf (deleted)
1.67 MB
Controlled
Mar 3, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors.pdf (deleted)
1.56 MB
Public
Feb 27, 2026
Attachment 5 - DRAFT CCR Revision 2 Section M - Evaluation Factors for Award as of 25 Feb.pdf (deleted)
1.02 MB
Public
Feb 27, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
OMG SysML Ver 1.7.pdf
13.45 MB
Controlled
Aug 13, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) AFRL-STO MBSE Style Guide v0.2.pdf
1.98 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This is a draft and pre-solicitation process for the KC-135 Center Console Refresh (CCR) Revision 2 program. The government plans to release a Draft RFP by the end of February 2026, followed by an Industry Day in March 2026, with the full RFP expected in May 2026. The work is managed by the C/KC-135 Contracting Branch at Tinker Air Force Base (TAFB). Numerous draft documents, including the System Requirements Document, Statement of Work, and technical orders, have been released for industry review and feedback. The government has also issued several Requests for Information (RFIs) seeking industry input on topics like contract type and incentives.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (80)

Document
Size
Access
Updated
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors.pdf (deleted)
1.56 MB
Public
Feb 27, 2026
Attachment 5 - DRAFT CCR Revision 2 Section M - Evaluation Factors for Award as of 25 Feb.pdf (deleted)
1.02 MB
Public
Feb 27, 2026
Attachment 4 - (CUI) CCR Section L - Instructions to Offerors.pdf (deleted)
1.56 MB
Public
Feb 27, 2026
Attachment 5 - CUI CCR Revision 2 Section M - Evaluation Factors for Award as of 25 Feb.pdf (deleted)
1.02 MB
Public
Feb 27, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
OMG SysML Ver 1.7.pdf
13.45 MB
Controlled
Aug 13, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) AFRL-STO MBSE Style Guide v0.2.pdf
1.98 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This opportunity is for the KC-135 Center Console Refresh (CCR) Revision 2 program. The government has provided a schedule indicating a Draft RFP is planned for the end of February 2026, an Industry Day in March 2026, and a full RFP release is expected in May 2026. The work is associated with Tinker Air Force Base (TAFB). Numerous draft documents, including a Statement of Work and System Requirements Document, have been released for industry review, and the government has been actively seeking input through multiple Requests for Information (RFIs).

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (76)

Document
Size
Access
Updated
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
OMG SysML Ver 1.7.pdf
13.45 MB
Controlled
Aug 13, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) AFRL-STO MBSE Style Guide v0.2.pdf
1.98 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This opportunity is for the KC-135 Center Console Refresh (CCR) Revision 2 program. A Draft RFP is planned for release at the end of February 2026, with an Industry Day in March 2026 and the full RFP expected in May 2026. The work is managed by the C/KC-135 Contracting Branch at Tinker Air Force Base (TAFB). The Government has been actively engaging with industry through multiple Requests for Information (RFIs) and a prior Virtual Industry Day.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (58)

Document
Size
Access
Updated
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
OMG SysML Ver 1.7.pdf
13.45 MB
Controlled
Aug 13, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) AFRL-STO MBSE Style Guide v0.2.pdf
1.98 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This is a Request for Information (RFI) for market research on the KC-135 Center Console Refresh (CCR) Revision 2 program, issued by the C/KC-135 Contracting Branch at Tinker Air Force Base. The government is seeking industry input on contract types, incentives, and standard compliance. A Virtual Industry Day was held on April 2, 2025, and draft documents including a System Requirements Document and Statement of Work have been released for review. Access to controlled documents requires an active DD2345 on file via the JCP website. No budget information is specified.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (58)

Document
Size
Access
Updated
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
OMG SysML Ver 1.7.pdf
13.45 MB
Controlled
Aug 13, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) AFRL-STO MBSE Style Guide v0.2.pdf
1.98 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This is a Request for Information (RFI) and market research process for the KC-135 Center Console Refresh (CCR) Revision 2 program, managed from Tinker Air Force Base. The government has released draft documents including a System Requirements Document and Statement of Work, held a virtual industry day, and is seeking industry input on contract types, incentives, and compliance. The process involves accessing controlled documents through sam.gov with an active DD2345. No specific budget or performance location is detailed in this description.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (57)

Document
Size
Access
Updated
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
OMG SysML Ver 1.7.pdf
13.45 MB
Controlled
Aug 13, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) AFRL-STO MBSE Style Guide v0.2.pdf
1.98 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »