KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

The Center Console Refresh (CCR) program seeks innovative turn-key solutions to address obsolescence in the KC-135 refueling tanker’s Fuel System, Flight Display System, and Flight Computer while improving supportability and future growth, and it also includes autothrottle systems. The anticipated contract is a single-award indefinite delivery/quantity vehicle with Cost-Plus Incentive Fee EMD and Firm Fixed Price Production and Deployment, comprising one 48-month base period plus six 1-year option periods and a projected period of performance from July 2028 to June 2038. Multiple amendments have been issued and a conformed solicitation is available; all amendments must be signed and included with proposals. Access to view-controlled SAM.gov documents requires an assigned SAM.gov role, a view request that includes the company CAGE code, and an active DD2345 on file through JCP.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Catina Baker
Not Given

Links (0)

Attachments (50)

Document
Size
Access
Updated
Solicitation Amendment - FA810526RB0010008 Conformed.pdf
21.84 MB
Public
Oct 23, 2026
Attachment 1. (CUI) KC-135 CCR Revision 2 Statement of Work (SOW) 08 Oct 2026.pdf
959.03 KB
Controlled
Oct 23, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME - UPDATED7 (P).xlsx
449.73 KB
Public
Oct 23, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB UPDATED5 (P).xlsx
389.47 KB
Public
Oct 23, 2026
Attachment 4. KC-135 CCR Section L - Instructions to Offerors - 23 Oct 2026.pdf
537.76 KB
Public
Oct 23, 2026
Solicitation Amendment FA810526RB0010008 SF 30.pdf
83.71 KB
Public
Oct 23, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME - UPDATED6 (P).xlsx
465.51 KB
Public
Oct 7, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB UPDATED4 (P).xlsx
388.75 KB
Public
Oct 7, 2026
Solicitation Amendment - FA810526RB0010007 (Conformed copy).pdf
28.05 MB
Public
Oct 7, 2026
Solicitation Amendment FA810526RB0010007 SF 30.pdf
389.31 KB
Public
Oct 7, 2026
Solicitation Amendment FA810526RB0010006 SF 30.pdf
2.51 MB
Public
Oct 7, 2026
Attachment 1. (CUI) KC-135 CCR Revision 2 Statement of Work (SOW) 01 Oct 2026.pdf
962.06 KB
Controlled
Oct 1, 2026
FA810526FB0010005 - Conformed.pdf
22.42 MB
Public
Oct 1, 2026
Solicitation Amendment FA810526RB0010005 SF 30.pdf
3.55 MB
Public
Oct 1, 2026
Solicitation Amendment - FA810526RB0010004.pdf
21.71 MB
Public
Sep 17, 2026
Attachment 1. (CUI) KC-135 CCR Revision 2 Statement of Work (SOW) 03 Sep 2026.pdf
973.65 KB
Controlled
Sep 3, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME - UPDATED5 (P).xlsx
465.27 KB
Public
Sep 3, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB UPDATED3 (P).xlsx
391.55 KB
Public
Sep 3, 2026
Solicitation - FA810526RB0010004 3 Sept 26.pdf
502.35 KB
Public
Sep 3, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME - UPDATED_03(P).xlsx
467.63 KB
Public
Aug 31, 2026
Attachment 2. (CUI) KC-135 CCR SRD 26Aug2026.pdf
907.16 KB
Controlled
Aug 31, 2026
Solicitation Amendment FA810526RB0010003 SF 30.pdf
440.17 KB
Public
Aug 31, 2026
Solicitation Amendment FA810526RB0010002 SF 30 12Aug26.pdf
7.51 MB
Public
Aug 24, 2026
Solicitation Amendment FA810526RB0010001 SF 30 28Jul26.pdf
6.21 MB
Public
Aug 24, 2026
Solicitation - FA810526RB001 23Jun26.pdf
21.74 MB
Public
Aug 24, 2026
Solicitation Amendment FA810526RB0010002 SF 30.pdf
697.91 KB
Public
Aug 12, 2026
Exhibit A CUI CCR CDRL Package0.pdf
12.71 MB
Controlled
Aug 12, 2026
Attachment 5. KC-135 CCR Section M - Evaluation Factors for Award0.pdf
318.28 KB
Public
Aug 12, 2026
Attachment 4. KC-135 CCR Section L - Instructions to Offerors02.pdf
537.8 KB
Public
Aug 12, 2026
Attachment 1. (CUI) KC-135 CCR Revision 2 Statement of Work (SOW).pdf
973.79 KB
Controlled
Aug 12, 2026
Attachment 8. TM-86-01R Air Force Technical Manual Contract Requirements (TMCR) CCR_REV2 1.pdf
591.48 KB
Controlled
Jul 28, 2026
Attachment 5. KC-135 - CCR Section M - Evaluation Factors for Award.pdf
317.72 KB
Public
Jul 28, 2026
Attachment 4 KC-135 - CCR Section L - Instructions to Offerors.pdf
537.64 KB
Public
Jul 28, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB - UPDATED (P) (2).xlsx
407.11 KB
Public
Jul 28, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME - UPDATED (P).xlsx
470.06 KB
Public
Jul 28, 2026
Attachment 1 (CUI) KC-135 CCR SOW Appendix D DD2794_KC-135 CCR.pdf
388.3 KB
Controlled
Jul 28, 2026
Attachment 1 (CUI) KC-135 CCR Revision 2 Statement of Work (SOW) 24 July 2026.pdf
978.04 KB
Controlled
Jul 28, 2026
Solicitation Amendment FA810526RB0010001 SF 30.pdf
694.67 KB
Public
Jul 28, 2026
Exhibit A CUI CCR CDRL Package.pdf
12.71 MB
Controlled
Jul 10, 2026
Attachment 9. DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Jul 10, 2026
Attachment 8. TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)CCR_REV2.pdf
560.33 KB
Public
Jul 10, 2026
Attachment 7. CUI CCR DD254.pdf
439.81 KB
Public
Jul 10, 2026
Attachment 6. - CUI CCR Revision 2 Data Rights Assertion Matrix-Working.xlsx
136.98 KB
Public
Jul 10, 2026
Attachment 5 KC-135 CCR Section M - Evaluation Factors for Award.pdf
317.37 KB
Public
Jul 10, 2026
Attachment 4 KC-135 CCR Section L - Instructions to Offerors.pdf
544 KB
Public
Jul 10, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB UPDATED2 (P).xlsx
388.56 KB
Public
Jul 10, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME - UPDATED3 (P).xlsx
465.28 KB
Public
Jul 10, 2026
Attachment 2. (CUI) KC-135 CCR SRD.pdf
813 KB
Controlled
Jul 10, 2026
Attachment 1. (CUI) KC-135 CCR Revision 2 Statement of Work (SOW) 09 July 26.pdf
999.79 KB
Controlled
Jul 10, 2026
Solicitation - FA810526RB001.pdf
1.7 MB
Public
Jul 10, 2026


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

The KC-135 Center Console Refresh (CCR) Revision 2 effort is being developed through draft SOW, SRD, Section L/M, pricing workbooks, technical orders, and a bidder library that the Government has continued to update, including Q&A responses through October 2026. Industry engagement includes virtual and in-person Industry Days and an aircraft tour at Tinker AFB, with the full RFP currently expected around May 2026 after the draft RFP and March 2026 Industry Day. All procurement questions and recommendations must be submitted in writing directly to the PCO, Brandi Shelden, and vendors are instructed not to use leadership meetings, technical exchanges, or informal discussions to bypass the PCO. Controlled documents require SAM.gov role access and an active DD2345 on file, and the bidder library includes items such as projected KC-135 modifications during CCR install and Attitude Plate Rev D.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Catina Baker
Not Given

Links (0)

Attachments (145)

Document
Size
Access
Updated
CUI KC-135 CCR Industry Day Response - 15.pdf
56.31 KB
Controlled
Oct 16, 2026
CUI KC-135 CCR Industry Day Response - 14.pdf
89.1 KB
Controlled
Oct 14, 2026
CUI KC-135 CCR Industry Day Response - 13.pdf
120.93 KB
Controlled
Sep 30, 2026
CUI KC-135 CCR Industry Day Response - 12.pdf
59.72 KB
Controlled
Sep 25, 2026
(CUI) KC-135 CCR modification table.xlsx
17.03 KB
Controlled
Aug 31, 2026
(CUI)) ATTITUDE PLATE REV D description.pptx
1.07 MB
Controlled
Aug 31, 2026
CUI KC-135 CCR Industry Day Response - 11.pdf
168.25 KB
Controlled
Aug 24, 2026
CUI KC-135 CCR Industry Day Response - 10.pdf
98.42 KB
Controlled
Aug 14, 2026
CUI KC-135 CCR Industry Day Response - 9.pdf
81.66 KB
Controlled
Aug 6, 2026
CUI KC-135 CCR Industry Day Response - 8 (2).pdf
98.54 KB
Controlled
Jul 28, 2026
CUI KC-135 CCR Industry Day Response - 7.pdf
92.63 KB
Controlled
Jul 24, 2026
CUI KC-135 CCR Industry Day Response - 22.07.26 - 6.pdf
130.53 KB
Controlled
Jul 22, 2026
Tanker Specifications_D-15441_15Oct1965.pdf
19.49 MB
Controlled
Jul 9, 2026
KC-135_Re-Engine_ECP-458_D458-400261-1_29Sep1980.pdf
1.57 MB
Controlled
Jul 9, 2026
CUI KC-135 CCR Industry Day Response - 6.pdf
46.33 KB
Controlled
Jul 1, 2026
CUI KC-135 CCR Industry Day Response - 5.pdf
269.79 KB
Controlled
Jun 24, 2026
KC-135 CCR Questions for Industry Day 2026.03.16.pdf
653.23 KB
Controlled
May 28, 2026
Draft Solicitation - FA810526RB001 21 May 26.pdf
22.86 MB
Public
May 26, 2026
Attachment 2. (CUI) KC-135 CCR SRD.pdf
1.22 MB
Controlled
May 26, 2026
5. Attachment 5. KC-135 CCR DRAFT Section M - Evaluation Factors for Award.pdf
773.78 KB
Public
May 21, 2026
4. Attachment 4. KC-135 CCR DRAFT Section L - Instructions to Offerors (1).pdf
1.24 MB
Public
May 21, 2026
3. ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB UPDATED (P) - Draft.xlsx
407.39 KB
Public
May 21, 2026
3. ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME - UPDATED (P) - Draft.xlsx
468.92 KB
Public
May 21, 2026
1. (CUI) KC-135 CCR Revision 2 DRAFT Statement of Work (SOW).pdf
1.45 MB
Controlled
May 21, 2026
(CUI) DRAFT RFP Round Two.pdf
214.66 KB
Controlled
May 21, 2026
B45 ELA 818-3812-001_Rev_A (2).pdf
225.68 KB
Controlled
May 11, 2026
CUI KC-135 CCR Industry Day Responses-3.pdf
400.75 KB
Controlled
May 7, 2026
TO 00-5-16.pdf
2.72 MB
Controlled
May 5, 2026
In Person Industry Day Measurements KC-135 CCR Memo 05May2026.pdf
255.07 KB
Controlled
May 5, 2026
In Person Industry Day Pictures KC-135 CCR Memo 22Mar26 No Sign.pdf
222.91 KB
Controlled
Apr 28, 2026
(U) AFRL MBSE Style Guide v2-1.zip
13.93 MB
Controlled
Apr 23, 2026
(U) AFRL MBSE Style Guide v2-1.docx
14.33 MB
Controlled
Apr 23, 2026
(CUI) FA8105 CCR Rev2 Draft SOW RFI Response-3.pdf
486.39 KB
Controlled
Apr 15, 2026
(CUI) FA8105 CCR Rev2 Draft SRD RFI Response-3.pdf
319.42 KB
Controlled
Apr 15, 2026
CUI KC-135 CCR Industry Day Responses-2.pdf
585.31 KB
Controlled
Apr 15, 2026
Tinker PDM Aircraft Tour for KC-135 CCR.pdf
204.38 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Responses.pdf
357.27 KB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

The KC-135 Center Console Refresh (CCR) Revision 2 effort is supported by AFLCMC/WLT at Tinker Air Force Base, with controlled documents and Q&A maintained in the Bidder’s Library and SAM.gov. The government has released draft SOW, SRD, Section L/M, pricing workbooks, Technical Orders, baseline configuration, and other attachments; access to controlled documents requires an active DD2345 and a SAM.gov role/cage code. Industry engagement has included virtual Industry Days on 2 April 2025 and 25 March 2026, one-on-one sessions, and an in-person aircraft tour at Tinker AFB with specific access instructions for CAC and non-CAC holders. The PCO, Brandi Shelden, is the only authorized point of contact, and all questions, comments, or recommendations must be submitted in writing directly to her without bypassing the PCO through other government personnel. The indicated schedule included a draft RFP around late February 2026, an Industry Day in March 2026, and full RFP release expected May 2026, with ongoing Q&A and document library updates continuing through October 2026.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
NAICS Not provided
  PSC   (blank)
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Catina Baker
Not Given

Links (0)

Attachments (144)

Document
Size
Access
Updated
CUI KC-135 CCR Industry Day Response - 14.pdf
89.1 KB
Controlled
Oct 14, 2026
CUI KC-135 CCR Industry Day Response - 13.pdf
120.93 KB
Controlled
Sep 30, 2026
CUI KC-135 CCR Industry Day Response - 12.pdf
59.72 KB
Controlled
Sep 25, 2026
(CUI) KC-135 CCR modification table.xlsx
17.03 KB
Controlled
Aug 31, 2026
(CUI)) ATTITUDE PLATE REV D description.pptx
1.07 MB
Controlled
Aug 31, 2026
CUI KC-135 CCR Industry Day Response - 11.pdf
168.25 KB
Controlled
Aug 24, 2026
CUI KC-135 CCR Industry Day Response - 10.pdf
98.42 KB
Controlled
Aug 14, 2026
CUI KC-135 CCR Industry Day Response - 9.pdf
81.66 KB
Controlled
Aug 6, 2026
CUI KC-135 CCR Industry Day Response - 8 (2).pdf
98.54 KB
Controlled
Jul 28, 2026
CUI KC-135 CCR Industry Day Response - 7.pdf
92.63 KB
Controlled
Jul 24, 2026
CUI KC-135 CCR Industry Day Response - 22.07.26 - 6.pdf
130.53 KB
Controlled
Jul 22, 2026
Tanker Specifications_D-15441_15Oct1965.pdf
19.49 MB
Controlled
Jul 9, 2026
KC-135_Re-Engine_ECP-458_D458-400261-1_29Sep1980.pdf
1.57 MB
Controlled
Jul 9, 2026
CUI KC-135 CCR Industry Day Response - 6.pdf
46.33 KB
Controlled
Jul 1, 2026
CUI KC-135 CCR Industry Day Response - 5.pdf
269.79 KB
Controlled
Jun 24, 2026
KC-135 CCR Questions for Industry Day 2026.03.16.pdf
653.23 KB
Controlled
May 28, 2026
Draft Solicitation - FA810526RB001 21 May 26.pdf
22.86 MB
Public
May 26, 2026
Attachment 2. (CUI) KC-135 CCR SRD.pdf
1.22 MB
Controlled
May 26, 2026
5. Attachment 5. KC-135 CCR DRAFT Section M - Evaluation Factors for Award.pdf
773.78 KB
Public
May 21, 2026
4. Attachment 4. KC-135 CCR DRAFT Section L - Instructions to Offerors (1).pdf
1.24 MB
Public
May 21, 2026
3. ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB UPDATED (P) - Draft.xlsx
407.39 KB
Public
May 21, 2026
3. ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME - UPDATED (P) - Draft.xlsx
468.92 KB
Public
May 21, 2026
1. (CUI) KC-135 CCR Revision 2 DRAFT Statement of Work (SOW).pdf
1.45 MB
Controlled
May 21, 2026
(CUI) DRAFT RFP Round Two.pdf
214.66 KB
Controlled
May 21, 2026
B45 ELA 818-3812-001_Rev_A (2).pdf
225.68 KB
Controlled
May 11, 2026
CUI KC-135 CCR Industry Day Responses-3.pdf
400.75 KB
Controlled
May 7, 2026
TO 00-5-16.pdf
2.72 MB
Controlled
May 5, 2026
In Person Industry Day Measurements KC-135 CCR Memo 05May2026.pdf
255.07 KB
Controlled
May 5, 2026
In Person Industry Day Pictures KC-135 CCR Memo 22Mar26 No Sign.pdf
222.91 KB
Controlled
Apr 28, 2026
(U) AFRL MBSE Style Guide v2-1.zip
13.93 MB
Controlled
Apr 23, 2026
(U) AFRL MBSE Style Guide v2-1.docx
14.33 MB
Controlled
Apr 23, 2026
(CUI) FA8105 CCR Rev2 Draft SOW RFI Response-3.pdf
486.39 KB
Controlled
Apr 15, 2026
(CUI) FA8105 CCR Rev2 Draft SRD RFI Response-3.pdf
319.42 KB
Controlled
Apr 15, 2026
CUI KC-135 CCR Industry Day Responses-2.pdf
585.31 KB
Controlled
Apr 15, 2026
Tinker PDM Aircraft Tour for KC-135 CCR.pdf
204.38 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Responses.pdf
357.27 KB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

The US Air Force seeks innovative, turn-key solutions for the KC-135 Center Console Refresh to address obsolescence in the Fuel System, Flight Display System, and Flight Computer, while adding autothrottle systems and enabling supportability and future growth. The anticipated contract is a single-award IDIQ with Cost-Plus Incentive Fee for EMD and Firm Fixed Price for Production and Deployment, consisting of a 48-month base period plus six 1-year options. The projected period of performance is July 2028 through June 2038. Multiple amendments have revised the SOW, attachments, pricing matrices, and clauses, and all amendments must be signed and included with proposals. To access view-controlled documents on SAM.gov, bidders need a SAM.gov role, must provide their CAGE code, and must have an active DD2345 on file through JCP.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Catina Baker
Not Given

Links (0)

Attachments (44)

Document
Size
Access
Updated
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME - UPDATED6 (P).xlsx
465.51 KB
Public
Oct 7, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB UPDATED4 (P).xlsx
388.75 KB
Public
Oct 7, 2026
Solicitation Amendment - FA810526RB0010007 (Conformed copy).pdf
28.05 MB
Public
Oct 7, 2026
Solicitation Amendment FA810526RB0010007 SF 30.pdf
389.31 KB
Public
Oct 7, 2026
Solicitation Amendment FA810526RB0010006 SF 30.pdf
2.51 MB
Public
Oct 7, 2026
Attachment 1. (CUI) KC-135 CCR Revision 2 Statement of Work (SOW) 01 Oct 2026.pdf
962.06 KB
Controlled
Oct 1, 2026
FA810526FB0010005 - Conformed.pdf
22.42 MB
Public
Oct 1, 2026
Solicitation Amendment FA810526RB0010005 SF 30.pdf
3.55 MB
Public
Oct 1, 2026
Solicitation Amendment - FA810526RB0010004.pdf
21.71 MB
Public
Sep 17, 2026
Attachment 1. (CUI) KC-135 CCR Revision 2 Statement of Work (SOW) 03 Sep 2026.pdf
973.65 KB
Controlled
Sep 3, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME - UPDATED5 (P).xlsx
465.27 KB
Public
Sep 3, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB UPDATED3 (P).xlsx
391.55 KB
Public
Sep 3, 2026
Solicitation - FA810526RB0010004 3 Sept 26.pdf
502.35 KB
Public
Sep 3, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME - UPDATED_03(P).xlsx
467.63 KB
Public
Aug 31, 2026
Attachment 2. (CUI) KC-135 CCR SRD 26Aug2026.pdf
907.16 KB
Controlled
Aug 31, 2026
Solicitation Amendment FA810526RB0010003 SF 30.pdf
440.17 KB
Public
Aug 31, 2026
Solicitation Amendment FA810526RB0010002 SF 30 12Aug26.pdf
7.51 MB
Public
Aug 24, 2026
Solicitation Amendment FA810526RB0010001 SF 30 28Jul26.pdf
6.21 MB
Public
Aug 24, 2026
Solicitation - FA810526RB001 23Jun26.pdf
21.74 MB
Public
Aug 24, 2026
Solicitation Amendment FA810526RB0010002 SF 30.pdf
697.91 KB
Public
Aug 12, 2026
Exhibit A CUI CCR CDRL Package0.pdf
12.71 MB
Controlled
Aug 12, 2026
Attachment 5. KC-135 CCR Section M - Evaluation Factors for Award0.pdf
318.28 KB
Public
Aug 12, 2026
Attachment 4. KC-135 CCR Section L - Instructions to Offerors02.pdf
537.8 KB
Public
Aug 12, 2026
Attachment 1. (CUI) KC-135 CCR Revision 2 Statement of Work (SOW).pdf
973.79 KB
Controlled
Aug 12, 2026
Attachment 8. TM-86-01R Air Force Technical Manual Contract Requirements (TMCR) CCR_REV2 1.pdf
591.48 KB
Controlled
Jul 28, 2026
Attachment 5. KC-135 - CCR Section M - Evaluation Factors for Award.pdf
317.72 KB
Public
Jul 28, 2026
Attachment 4 KC-135 - CCR Section L - Instructions to Offerors.pdf
537.64 KB
Public
Jul 28, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB - UPDATED (P) (2).xlsx
407.11 KB
Public
Jul 28, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME - UPDATED (P).xlsx
470.06 KB
Public
Jul 28, 2026
Attachment 1 (CUI) KC-135 CCR SOW Appendix D DD2794_KC-135 CCR.pdf
388.3 KB
Controlled
Jul 28, 2026
Attachment 1 (CUI) KC-135 CCR Revision 2 Statement of Work (SOW) 24 July 2026.pdf
978.04 KB
Controlled
Jul 28, 2026
Solicitation Amendment FA810526RB0010001 SF 30.pdf
694.67 KB
Public
Jul 28, 2026
Exhibit A CUI CCR CDRL Package.pdf
12.71 MB
Controlled
Jul 10, 2026
Attachment 9. DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Jul 10, 2026
Attachment 8. TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)CCR_REV2.pdf
560.33 KB
Public
Jul 10, 2026
Attachment 7. CUI CCR DD254.pdf
439.81 KB
Public
Jul 10, 2026
Attachment 6. - CUI CCR Revision 2 Data Rights Assertion Matrix-Working.xlsx
136.98 KB
Public
Jul 10, 2026
Attachment 5 KC-135 CCR Section M - Evaluation Factors for Award.pdf
317.37 KB
Public
Jul 10, 2026
Attachment 4 KC-135 CCR Section L - Instructions to Offerors.pdf
544 KB
Public
Jul 10, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB UPDATED2 (P).xlsx
388.56 KB
Public
Jul 10, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME - UPDATED3 (P).xlsx
465.28 KB
Public
Jul 10, 2026
Attachment 2. (CUI) KC-135 CCR SRD.pdf
813 KB
Controlled
Jul 10, 2026
Attachment 1. (CUI) KC-135 CCR Revision 2 Statement of Work (SOW) 09 July 26.pdf
999.79 KB
Controlled
Jul 10, 2026
Solicitation - FA810526RB001.pdf
1.7 MB
Public
Jul 10, 2026


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

The U.S. Air Force’s Center Console Refresh (CCR) program seeks turn-key solutions to replace and improve the KC-135 tanker’s obsolete Fuel System, Flight Display System, and Flight Computer, while adding autothrottle systems and enabling future growth/adaptability. The anticipated contract is a single-award, indefinite-delivery/quantity type vehicle with a Cost-Plus Incentive Fee (CPIF) EMD phase and Firm Fixed Price (FFP) Production and Deployment phase. It is planned to consist of one 48-month base period plus six 1-year option periods, with a projected period of performance from July 2028 to June 2038. To access view-controlled documents on SAM.gov, interested parties must have a SAM.gov role, submit a request with their company CAGE code, and have an active DD2345 on file through JCP. SRD Section 3.27.3 will be updated in a future formal revision to align with SOW Sections 2.2 and 13.4.3.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Catina Baker
Not Given

Links (0)

Attachments (39)

Document
Size
Access
Updated
Attachment 1. (CUI) KC-135 CCR Revision 2 Statement of Work (SOW) 01 Oct 2026.pdf
962.06 KB
Controlled
Oct 1, 2026
FA810526FB0010005 - Conformed.pdf
22.42 MB
Public
Oct 1, 2026
Solicitation Amendment FA810526RB0010005 SF 30.pdf
3.55 MB
Public
Oct 1, 2026
Solicitation Amendment - FA810526RB0010004.pdf
21.71 MB
Public
Sep 17, 2026
Attachment 1. (CUI) KC-135 CCR Revision 2 Statement of Work (SOW) 03 Sep 2026.pdf
973.65 KB
Controlled
Sep 3, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME - UPDATED5 (P).xlsx
465.27 KB
Public
Sep 3, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB UPDATED3 (P).xlsx
391.55 KB
Public
Sep 3, 2026
Solicitation - FA810526RB0010004 3 Sept 26.pdf
502.35 KB
Public
Sep 3, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME - UPDATED_03(P).xlsx
467.63 KB
Public
Aug 31, 2026
Attachment 2. (CUI) KC-135 CCR SRD 26Aug2026.pdf
907.16 KB
Controlled
Aug 31, 2026
Solicitation Amendment FA810526RB0010003 SF 30.pdf
440.17 KB
Public
Aug 31, 2026
Solicitation Amendment FA810526RB0010002 SF 30 12Aug26.pdf
7.51 MB
Public
Aug 24, 2026
Solicitation Amendment FA810526RB0010001 SF 30 28Jul26.pdf
6.21 MB
Public
Aug 24, 2026
Solicitation - FA810526RB001 23Jun26.pdf
21.74 MB
Public
Aug 24, 2026
Solicitation Amendment FA810526RB0010002 SF 30.pdf
697.91 KB
Public
Aug 12, 2026
Exhibit A CUI CCR CDRL Package0.pdf
12.71 MB
Controlled
Aug 12, 2026
Attachment 5. KC-135 CCR Section M - Evaluation Factors for Award0.pdf
318.28 KB
Public
Aug 12, 2026
Attachment 4. KC-135 CCR Section L - Instructions to Offerors02.pdf
537.8 KB
Public
Aug 12, 2026
Attachment 1. (CUI) KC-135 CCR Revision 2 Statement of Work (SOW).pdf
973.79 KB
Controlled
Aug 12, 2026
Attachment 8. TM-86-01R Air Force Technical Manual Contract Requirements (TMCR) CCR_REV2 1.pdf
591.48 KB
Controlled
Jul 28, 2026
Attachment 5. KC-135 - CCR Section M - Evaluation Factors for Award.pdf
317.72 KB
Public
Jul 28, 2026
Attachment 4 KC-135 - CCR Section L - Instructions to Offerors.pdf
537.64 KB
Public
Jul 28, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB - UPDATED (P) (2).xlsx
407.11 KB
Public
Jul 28, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME - UPDATED (P).xlsx
470.06 KB
Public
Jul 28, 2026
Attachment 1 (CUI) KC-135 CCR SOW Appendix D DD2794_KC-135 CCR.pdf
388.3 KB
Controlled
Jul 28, 2026
Attachment 1 (CUI) KC-135 CCR Revision 2 Statement of Work (SOW) 24 July 2026.pdf
978.04 KB
Controlled
Jul 28, 2026
Solicitation Amendment FA810526RB0010001 SF 30.pdf
694.67 KB
Public
Jul 28, 2026
Exhibit A CUI CCR CDRL Package.pdf
12.71 MB
Controlled
Jul 10, 2026
Attachment 9. DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Jul 10, 2026
Attachment 8. TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)CCR_REV2.pdf
560.33 KB
Public
Jul 10, 2026
Attachment 7. CUI CCR DD254.pdf
439.81 KB
Public
Jul 10, 2026
Attachment 6. - CUI CCR Revision 2 Data Rights Assertion Matrix-Working.xlsx
136.98 KB
Public
Jul 10, 2026
Attachment 5 KC-135 CCR Section M - Evaluation Factors for Award.pdf
317.37 KB
Public
Jul 10, 2026
Attachment 4 KC-135 CCR Section L - Instructions to Offerors.pdf
544 KB
Public
Jul 10, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB UPDATED2 (P).xlsx
388.56 KB
Public
Jul 10, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME - UPDATED3 (P).xlsx
465.28 KB
Public
Jul 10, 2026
Attachment 2. (CUI) KC-135 CCR SRD.pdf
813 KB
Controlled
Jul 10, 2026
Attachment 1. (CUI) KC-135 CCR Revision 2 Statement of Work (SOW) 09 July 26.pdf
999.79 KB
Controlled
Jul 10, 2026
Solicitation - FA810526RB001.pdf
1.7 MB
Public
Jul 10, 2026


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

The KC-135 Center Console Refresh (CCR) Revision 2 effort at Tinker Air Force Base is progressing through draft solicitations, Q&A updates, and bidder’s library postings covering the SOW, SRD, Section L/M, pricing workbooks, technical orders, and related documents. Key non-bid milestones include a projected Draft RFP release at the end of February 2026, an Industry Day in March 2026, and an expected full RFP release in May 2026. An Aircraft Tour at Tinker AFB will require non-CAC holders to arrive at the Visitor’s Center at 6:00 a.m. and CAC holders at 7:30 a.m., with the tour concluding by 4:00 p.m. CST. The Government stresses that the PCO is the only authorized point of contact for clarifications or recommendations, and all questions/comments must be submitted in writing to brandi.shelden@us.af.mil. Interested bidders should monitor SAM.gov for updates and note that controlled documents require a SAM.gov role and an active DD2345.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Catina Baker
Not Given

Links (0)

Attachments (143)

Document
Size
Access
Updated
CUI KC-135 CCR Industry Day Response - 13.pdf
120.93 KB
Controlled
Sep 30, 2026
CUI KC-135 CCR Industry Day Response - 12.pdf
59.72 KB
Controlled
Sep 25, 2026
(CUI) KC-135 CCR modification table.xlsx
17.03 KB
Controlled
Aug 31, 2026
(CUI)) ATTITUDE PLATE REV D description.pptx
1.07 MB
Controlled
Aug 31, 2026
CUI KC-135 CCR Industry Day Response - 11.pdf
168.25 KB
Controlled
Aug 24, 2026
CUI KC-135 CCR Industry Day Response - 10.pdf
98.42 KB
Controlled
Aug 14, 2026
CUI KC-135 CCR Industry Day Response - 9.pdf
81.66 KB
Controlled
Aug 6, 2026
CUI KC-135 CCR Industry Day Response - 8 (2).pdf
98.54 KB
Controlled
Jul 28, 2026
CUI KC-135 CCR Industry Day Response - 7.pdf
92.63 KB
Controlled
Jul 24, 2026
CUI KC-135 CCR Industry Day Response - 22.07.26 - 6.pdf
130.53 KB
Controlled
Jul 22, 2026
Tanker Specifications_D-15441_15Oct1965.pdf
19.49 MB
Controlled
Jul 9, 2026
KC-135_Re-Engine_ECP-458_D458-400261-1_29Sep1980.pdf
1.57 MB
Controlled
Jul 9, 2026
CUI KC-135 CCR Industry Day Response - 6.pdf
46.33 KB
Controlled
Jul 1, 2026
CUI KC-135 CCR Industry Day Response - 5.pdf
269.79 KB
Controlled
Jun 24, 2026
KC-135 CCR Questions for Industry Day 2026.03.16.pdf
653.23 KB
Controlled
May 28, 2026
Draft Solicitation - FA810526RB001 21 May 26.pdf
22.86 MB
Public
May 26, 2026
Attachment 2. (CUI) KC-135 CCR SRD.pdf
1.22 MB
Controlled
May 26, 2026
5. Attachment 5. KC-135 CCR DRAFT Section M - Evaluation Factors for Award.pdf
773.78 KB
Public
May 21, 2026
4. Attachment 4. KC-135 CCR DRAFT Section L - Instructions to Offerors (1).pdf
1.24 MB
Public
May 21, 2026
3. ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB UPDATED (P) - Draft.xlsx
407.39 KB
Public
May 21, 2026
3. ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME - UPDATED (P) - Draft.xlsx
468.92 KB
Public
May 21, 2026
1. (CUI) KC-135 CCR Revision 2 DRAFT Statement of Work (SOW).pdf
1.45 MB
Controlled
May 21, 2026
(CUI) DRAFT RFP Round Two.pdf
214.66 KB
Controlled
May 21, 2026
B45 ELA 818-3812-001_Rev_A (2).pdf
225.68 KB
Controlled
May 11, 2026
CUI KC-135 CCR Industry Day Responses-3.pdf
400.75 KB
Controlled
May 7, 2026
TO 00-5-16.pdf
2.72 MB
Controlled
May 5, 2026
In Person Industry Day Measurements KC-135 CCR Memo 05May2026.pdf
255.07 KB
Controlled
May 5, 2026
In Person Industry Day Pictures KC-135 CCR Memo 22Mar26 No Sign.pdf
222.91 KB
Controlled
Apr 28, 2026
(U) AFRL MBSE Style Guide v2-1.zip
13.93 MB
Controlled
Apr 23, 2026
(U) AFRL MBSE Style Guide v2-1.docx
14.33 MB
Controlled
Apr 23, 2026
(CUI) FA8105 CCR Rev2 Draft SOW RFI Response-3.pdf
486.39 KB
Controlled
Apr 15, 2026
(CUI) FA8105 CCR Rev2 Draft SRD RFI Response-3.pdf
319.42 KB
Controlled
Apr 15, 2026
CUI KC-135 CCR Industry Day Responses-2.pdf
585.31 KB
Controlled
Apr 15, 2026
Tinker PDM Aircraft Tour for KC-135 CCR.pdf
204.38 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Responses.pdf
357.27 KB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

The Government is developing the KC-135 Center Console Refresh (CCR) Revision 2 procurement, with draft SOW, SRD, Section L/M, pricing workbooks, and a controlled Bidder’s Library released for industry review. Non-bid milestones include a planned Draft RFP release around the end of February 2026, an Industry Day in March 2026, and a full RFP expected in May 2026. The Government has posted extensive Q&A updates and reminds offerors that only the PCO, Brandi Shelden, may clarify requirements or accept recommendations, with all questions to be submitted in writing directly to her. Controlled documents require a SAM.gov role and an active DD2345, and aircraft tour/access logistics are associated with Tinker AFB. Industry input has also been sought through RFIs on contract type, incentives, and standard compliance for the KC-135 center console refresh effort.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Catina Baker
Not Given

Links (0)

Attachments (142)

Document
Size
Access
Updated
CUI KC-135 CCR Industry Day Response - 12.pdf
59.72 KB
Controlled
Sep 25, 2026
(CUI) KC-135 CCR modification table.xlsx
17.03 KB
Controlled
Aug 31, 2026
(CUI)) ATTITUDE PLATE REV D description.pptx
1.07 MB
Controlled
Aug 31, 2026
CUI KC-135 CCR Industry Day Response - 11.pdf
168.25 KB
Controlled
Aug 24, 2026
CUI KC-135 CCR Industry Day Response - 10.pdf
98.42 KB
Controlled
Aug 14, 2026
CUI KC-135 CCR Industry Day Response - 9.pdf
81.66 KB
Controlled
Aug 6, 2026
CUI KC-135 CCR Industry Day Response - 8 (2).pdf
98.54 KB
Controlled
Jul 28, 2026
CUI KC-135 CCR Industry Day Response - 7.pdf
92.63 KB
Controlled
Jul 24, 2026
CUI KC-135 CCR Industry Day Response - 22.07.26 - 6.pdf
130.53 KB
Controlled
Jul 22, 2026
Tanker Specifications_D-15441_15Oct1965.pdf
19.49 MB
Controlled
Jul 9, 2026
KC-135_Re-Engine_ECP-458_D458-400261-1_29Sep1980.pdf
1.57 MB
Controlled
Jul 9, 2026
CUI KC-135 CCR Industry Day Response - 6.pdf
46.33 KB
Controlled
Jul 1, 2026
CUI KC-135 CCR Industry Day Response - 5.pdf
269.79 KB
Controlled
Jun 24, 2026
KC-135 CCR Questions for Industry Day 2026.03.16.pdf
653.23 KB
Controlled
May 28, 2026
Draft Solicitation - FA810526RB001 21 May 26.pdf
22.86 MB
Public
May 26, 2026
Attachment 2. (CUI) KC-135 CCR SRD.pdf
1.22 MB
Controlled
May 26, 2026
5. Attachment 5. KC-135 CCR DRAFT Section M - Evaluation Factors for Award.pdf
773.78 KB
Public
May 21, 2026
4. Attachment 4. KC-135 CCR DRAFT Section L - Instructions to Offerors (1).pdf
1.24 MB
Public
May 21, 2026
3. ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB UPDATED (P) - Draft.xlsx
407.39 KB
Public
May 21, 2026
3. ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME - UPDATED (P) - Draft.xlsx
468.92 KB
Public
May 21, 2026
1. (CUI) KC-135 CCR Revision 2 DRAFT Statement of Work (SOW).pdf
1.45 MB
Controlled
May 21, 2026
(CUI) DRAFT RFP Round Two.pdf
214.66 KB
Controlled
May 21, 2026
B45 ELA 818-3812-001_Rev_A (2).pdf
225.68 KB
Controlled
May 11, 2026
CUI KC-135 CCR Industry Day Responses-3.pdf
400.75 KB
Controlled
May 7, 2026
TO 00-5-16.pdf
2.72 MB
Controlled
May 5, 2026
In Person Industry Day Measurements KC-135 CCR Memo 05May2026.pdf
255.07 KB
Controlled
May 5, 2026
In Person Industry Day Pictures KC-135 CCR Memo 22Mar26 No Sign.pdf
222.91 KB
Controlled
Apr 28, 2026
(U) AFRL MBSE Style Guide v2-1.zip
13.93 MB
Controlled
Apr 23, 2026
(U) AFRL MBSE Style Guide v2-1.docx
14.33 MB
Controlled
Apr 23, 2026
(CUI) FA8105 CCR Rev2 Draft SOW RFI Response-3.pdf
486.39 KB
Controlled
Apr 15, 2026
(CUI) FA8105 CCR Rev2 Draft SRD RFI Response-3.pdf
319.42 KB
Controlled
Apr 15, 2026
CUI KC-135 CCR Industry Day Responses-2.pdf
585.31 KB
Controlled
Apr 15, 2026
Tinker PDM Aircraft Tour for KC-135 CCR.pdf
204.38 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Responses.pdf
357.27 KB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

The conformed contract incorporating Amendments 01–04 is available, with revisions to Attachment 1 Statement of Work, Attachment 2 SRD, Attachments 3a/3b pricing matrices, and removal of Clause H005. The Center Console Refresh (CCR) program addresses critical obsolescence in the KC-135 Refueling Tanker aircraft, requiring updated Fuel System, Flight Display System, and Flight Computer plus autothrottle systems, with turn-key solutions enabling supportability and future growth. The anticipated contract is a single-award, indefinite delivery/quantity type consisting of a Cost-Plus Incentive Fee (CPIF) for EMD and Firm Fixed Price (FFP) for Production and Deployment (P&D), with one 48-month base period and six 1-year option periods. The projected period of performance is July 2028 to June 2038. Access to view-controlled SAM.gov documents requires an assigned SAM.gov role, submission of a request with the company CAGE code, and an active DD2345 on file through the JCP website.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Catina Baker
Not Given

Links (0)

Attachments (36)

Document
Size
Access
Updated
Solicitation Amendment - FA810526RB0010004.pdf
21.71 MB
Public
Sep 17, 2026
Attachment 1. (CUI) KC-135 CCR Revision 2 Statement of Work (SOW) 03 Sep 2026.pdf
973.65 KB
Controlled
Sep 3, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME - UPDATED5 (P).xlsx
465.27 KB
Public
Sep 3, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB UPDATED3 (P).xlsx
391.55 KB
Public
Sep 3, 2026
Solicitation - FA810526RB0010004 3 Sept 26.pdf
502.35 KB
Public
Sep 3, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME - UPDATED_03(P).xlsx
467.63 KB
Public
Aug 31, 2026
Attachment 2. (CUI) KC-135 CCR SRD 26Aug2026.pdf
907.16 KB
Controlled
Aug 31, 2026
Solicitation Amendment FA810526RB0010003 SF 30.pdf
440.17 KB
Public
Aug 31, 2026
Solicitation Amendment FA810526RB0010002 SF 30 12Aug26.pdf
7.51 MB
Public
Aug 24, 2026
Solicitation Amendment FA810526RB0010001 SF 30 28Jul26.pdf
6.21 MB
Public
Aug 24, 2026
Solicitation - FA810526RB001 23Jun26.pdf
21.74 MB
Public
Aug 24, 2026
Solicitation Amendment FA810526RB0010002 SF 30.pdf
697.91 KB
Public
Aug 12, 2026
Exhibit A CUI CCR CDRL Package0.pdf
12.71 MB
Controlled
Aug 12, 2026
Attachment 5. KC-135 CCR Section M - Evaluation Factors for Award0.pdf
318.28 KB
Public
Aug 12, 2026
Attachment 4. KC-135 CCR Section L - Instructions to Offerors02.pdf
537.8 KB
Public
Aug 12, 2026
Attachment 1. (CUI) KC-135 CCR Revision 2 Statement of Work (SOW).pdf
973.79 KB
Controlled
Aug 12, 2026
Attachment 8. TM-86-01R Air Force Technical Manual Contract Requirements (TMCR) CCR_REV2 1.pdf
591.48 KB
Controlled
Jul 28, 2026
Attachment 5. KC-135 - CCR Section M - Evaluation Factors for Award.pdf
317.72 KB
Public
Jul 28, 2026
Attachment 4 KC-135 - CCR Section L - Instructions to Offerors.pdf
537.64 KB
Public
Jul 28, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB - UPDATED (P) (2).xlsx
407.11 KB
Public
Jul 28, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME - UPDATED (P).xlsx
470.06 KB
Public
Jul 28, 2026
Attachment 1 (CUI) KC-135 CCR SOW Appendix D DD2794_KC-135 CCR.pdf
388.3 KB
Controlled
Jul 28, 2026
Attachment 1 (CUI) KC-135 CCR Revision 2 Statement of Work (SOW) 24 July 2026.pdf
978.04 KB
Controlled
Jul 28, 2026
Solicitation Amendment FA810526RB0010001 SF 30.pdf
694.67 KB
Public
Jul 28, 2026
Exhibit A CUI CCR CDRL Package.pdf
12.71 MB
Controlled
Jul 10, 2026
Attachment 9. DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Jul 10, 2026
Attachment 8. TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)CCR_REV2.pdf
560.33 KB
Public
Jul 10, 2026
Attachment 7. CUI CCR DD254.pdf
439.81 KB
Public
Jul 10, 2026
Attachment 6. - CUI CCR Revision 2 Data Rights Assertion Matrix-Working.xlsx
136.98 KB
Public
Jul 10, 2026
Attachment 5 KC-135 CCR Section M - Evaluation Factors for Award.pdf
317.37 KB
Public
Jul 10, 2026
Attachment 4 KC-135 CCR Section L - Instructions to Offerors.pdf
544 KB
Public
Jul 10, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB UPDATED2 (P).xlsx
388.56 KB
Public
Jul 10, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME - UPDATED3 (P).xlsx
465.28 KB
Public
Jul 10, 2026
Attachment 2. (CUI) KC-135 CCR SRD.pdf
813 KB
Controlled
Jul 10, 2026
Attachment 1. (CUI) KC-135 CCR Revision 2 Statement of Work (SOW) 09 July 26.pdf
999.79 KB
Controlled
Jul 10, 2026
Solicitation - FA810526RB001.pdf
1.7 MB
Public
Jul 10, 2026


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This opportunity covers the KC-135 Center Console Refresh program, addressing critical obsolescence in the aircraft's Fuel System, Flight Display System, Flight Computer, and autothrottle systems. The anticipated contract is a single-award indefinite delivery/quantity type arrangement with a Cost-Plus Incentive Fee for Engineering and Manufacturing Development and Firm Fixed Price for Production and Deployment. It includes one 48-month base period and six 1-year option periods, with a projected period of performance from July 2028 to June 2038. Access to view-controlled documents requires an active DD2345, a SAM.gov role, and submission of a CAGE code. No performance location is specified.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Catina Baker
Not Given

Links (0)

Attachments (35)

Document
Size
Access
Updated
Attachment 1. (CUI) KC-135 CCR Revision 2 Statement of Work (SOW) 03 Sep 2026.pdf
973.65 KB
Controlled
Sep 3, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME - UPDATED5 (P).xlsx
465.27 KB
Public
Sep 3, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB UPDATED3 (P).xlsx
391.55 KB
Public
Sep 3, 2026
Solicitation - FA810526RB0010004 3 Sept 26.pdf
502.35 KB
Public
Sep 3, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME - UPDATED_03(P).xlsx
467.63 KB
Public
Aug 31, 2026
Attachment 2. (CUI) KC-135 CCR SRD 26Aug2026.pdf
907.16 KB
Controlled
Aug 31, 2026
Solicitation Amendment FA810526RB0010003 SF 30.pdf
440.17 KB
Public
Aug 31, 2026
Solicitation Amendment FA810526RB0010002 SF 30 12Aug26.pdf
7.51 MB
Public
Aug 24, 2026
Solicitation Amendment FA810526RB0010001 SF 30 28Jul26.pdf
6.21 MB
Public
Aug 24, 2026
Solicitation - FA810526RB001 23Jun26.pdf
21.74 MB
Public
Aug 24, 2026
Solicitation Amendment FA810526RB0010002 SF 30.pdf
697.91 KB
Public
Aug 12, 2026
Exhibit A CUI CCR CDRL Package0.pdf
12.71 MB
Controlled
Aug 12, 2026
Attachment 5. KC-135 CCR Section M - Evaluation Factors for Award0.pdf
318.28 KB
Public
Aug 12, 2026
Attachment 4. KC-135 CCR Section L - Instructions to Offerors02.pdf
537.8 KB
Public
Aug 12, 2026
Attachment 1. (CUI) KC-135 CCR Revision 2 Statement of Work (SOW).pdf
973.79 KB
Controlled
Aug 12, 2026
Attachment 8. TM-86-01R Air Force Technical Manual Contract Requirements (TMCR) CCR_REV2 1.pdf
591.48 KB
Controlled
Jul 28, 2026
Attachment 5. KC-135 - CCR Section M - Evaluation Factors for Award.pdf
317.72 KB
Public
Jul 28, 2026
Attachment 4 KC-135 - CCR Section L - Instructions to Offerors.pdf
537.64 KB
Public
Jul 28, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB - UPDATED (P) (2).xlsx
407.11 KB
Public
Jul 28, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME - UPDATED (P).xlsx
470.06 KB
Public
Jul 28, 2026
Attachment 1 (CUI) KC-135 CCR SOW Appendix D DD2794_KC-135 CCR.pdf
388.3 KB
Controlled
Jul 28, 2026
Attachment 1 (CUI) KC-135 CCR Revision 2 Statement of Work (SOW) 24 July 2026.pdf
978.04 KB
Controlled
Jul 28, 2026
Solicitation Amendment FA810526RB0010001 SF 30.pdf
694.67 KB
Public
Jul 28, 2026
Exhibit A CUI CCR CDRL Package.pdf
12.71 MB
Controlled
Jul 10, 2026
Attachment 9. DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Jul 10, 2026
Attachment 8. TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)CCR_REV2.pdf
560.33 KB
Public
Jul 10, 2026
Attachment 7. CUI CCR DD254.pdf
439.81 KB
Public
Jul 10, 2026
Attachment 6. - CUI CCR Revision 2 Data Rights Assertion Matrix-Working.xlsx
136.98 KB
Public
Jul 10, 2026
Attachment 5 KC-135 CCR Section M - Evaluation Factors for Award.pdf
317.37 KB
Public
Jul 10, 2026
Attachment 4 KC-135 CCR Section L - Instructions to Offerors.pdf
544 KB
Public
Jul 10, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB UPDATED2 (P).xlsx
388.56 KB
Public
Jul 10, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME - UPDATED3 (P).xlsx
465.28 KB
Public
Jul 10, 2026
Attachment 2. (CUI) KC-135 CCR SRD.pdf
813 KB
Controlled
Jul 10, 2026
Attachment 1. (CUI) KC-135 CCR Revision 2 Statement of Work (SOW) 09 July 26.pdf
999.79 KB
Controlled
Jul 10, 2026
Solicitation - FA810526RB001.pdf
1.7 MB
Public
Jul 10, 2026


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

The KC-135 Center Console Refresh (CCR) Revision 2 acquisition is being conducted through a phased industry engagement, with a draft RFP released around early 2026, an Industry Day held in March 2026, and the full RFP release currently expected in May 2026. The Government has posted multiple draft documents—including the Statement of Work, System Requirements Document, pricing workbooks, and Section L/M—and continues to update the Bidder

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Catina Baker
Not Given

Links (0)

Attachments (141)

Document
Size
Access
Updated
(CUI) KC-135 CCR modification table.xlsx
17.03 KB
Controlled
Aug 31, 2026
(CUI)) ATTITUDE PLATE REV D description.pptx
1.07 MB
Controlled
Aug 31, 2026
CUI KC-135 CCR Industry Day Response - 11.pdf
168.25 KB
Controlled
Aug 24, 2026
CUI KC-135 CCR Industry Day Response - 10.pdf
98.42 KB
Controlled
Aug 14, 2026
CUI KC-135 CCR Industry Day Response - 9.pdf
81.66 KB
Controlled
Aug 6, 2026
CUI KC-135 CCR Industry Day Response - 8 (2).pdf
98.54 KB
Controlled
Jul 28, 2026
CUI KC-135 CCR Industry Day Response - 7.pdf
92.63 KB
Controlled
Jul 24, 2026
CUI KC-135 CCR Industry Day Response - 22.07.26 - 6.pdf
130.53 KB
Controlled
Jul 22, 2026
Tanker Specifications_D-15441_15Oct1965.pdf
19.49 MB
Controlled
Jul 9, 2026
KC-135_Re-Engine_ECP-458_D458-400261-1_29Sep1980.pdf
1.57 MB
Controlled
Jul 9, 2026
CUI KC-135 CCR Industry Day Response - 6.pdf
46.33 KB
Controlled
Jul 1, 2026
CUI KC-135 CCR Industry Day Response - 5.pdf
269.79 KB
Controlled
Jun 24, 2026
KC-135 CCR Questions for Industry Day 2026.03.16.pdf
653.23 KB
Controlled
May 28, 2026
Draft Solicitation - FA810526RB001 21 May 26.pdf
22.86 MB
Public
May 26, 2026
Attachment 2. (CUI) KC-135 CCR SRD.pdf
1.22 MB
Controlled
May 26, 2026
5. Attachment 5. KC-135 CCR DRAFT Section M - Evaluation Factors for Award.pdf
773.78 KB
Public
May 21, 2026
4. Attachment 4. KC-135 CCR DRAFT Section L - Instructions to Offerors (1).pdf
1.24 MB
Public
May 21, 2026
3. ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB UPDATED (P) - Draft.xlsx
407.39 KB
Public
May 21, 2026
3. ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME - UPDATED (P) - Draft.xlsx
468.92 KB
Public
May 21, 2026
1. (CUI) KC-135 CCR Revision 2 DRAFT Statement of Work (SOW).pdf
1.45 MB
Controlled
May 21, 2026
(CUI) DRAFT RFP Round Two.pdf
214.66 KB
Controlled
May 21, 2026
B45 ELA 818-3812-001_Rev_A (2).pdf
225.68 KB
Controlled
May 11, 2026
CUI KC-135 CCR Industry Day Responses-3.pdf
400.75 KB
Controlled
May 7, 2026
TO 00-5-16.pdf
2.72 MB
Controlled
May 5, 2026
In Person Industry Day Measurements KC-135 CCR Memo 05May2026.pdf
255.07 KB
Controlled
May 5, 2026
In Person Industry Day Pictures KC-135 CCR Memo 22Mar26 No Sign.pdf
222.91 KB
Controlled
Apr 28, 2026
(U) AFRL MBSE Style Guide v2-1.zip
13.93 MB
Controlled
Apr 23, 2026
(U) AFRL MBSE Style Guide v2-1.docx
14.33 MB
Controlled
Apr 23, 2026
(CUI) FA8105 CCR Rev2 Draft SOW RFI Response-3.pdf
486.39 KB
Controlled
Apr 15, 2026
(CUI) FA8105 CCR Rev2 Draft SRD RFI Response-3.pdf
319.42 KB
Controlled
Apr 15, 2026
CUI KC-135 CCR Industry Day Responses-2.pdf
585.31 KB
Controlled
Apr 15, 2026
Tinker PDM Aircraft Tour for KC-135 CCR.pdf
204.38 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Responses.pdf
357.27 KB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

The U.S. Air Force is seeking innovative, turn-key solutions for the KC-135 Center Console Refresh (CCR) program to address critical obsolescence issues in the aircraft's Fuel System, Flight Display System, and Flight Computer, while also incorporating autothrottle systems and future growth capabilities. The anticipated contract is a single-award indefinite delivery/quantity type contract with a Cost-Plus Incentive Fee structure for Engineering and Manufacturing Development, and Firm Fixed Price for Production and Deployment. The contract includes a 48-month base period followed by six 1-year option periods, with a projected period of performance from July 2028 to June 2038. Access to view-controlled documents requires an active DD2345 on file through the JCP website, a SAM.gov role assignment, and submission of the company's CAGE code.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Catina Baker
Not Given

Links (0)

Attachments (31)

Document
Size
Access
Updated
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME - UPDATED_03(P).xlsx
467.63 KB
Public
Aug 31, 2026
Attachment 2. (CUI) KC-135 CCR SRD 26Aug2026.pdf
907.16 KB
Controlled
Aug 31, 2026
Solicitation Amendment FA810526RB0010003 SF 30.pdf
440.17 KB
Public
Aug 31, 2026
Solicitation Amendment FA810526RB0010002 SF 30 12Aug26.pdf
7.51 MB
Public
Aug 24, 2026
Solicitation Amendment FA810526RB0010001 SF 30 28Jul26.pdf
6.21 MB
Public
Aug 24, 2026
Solicitation - FA810526RB001 23Jun26.pdf
21.74 MB
Public
Aug 24, 2026
Solicitation Amendment FA810526RB0010002 SF 30.pdf
697.91 KB
Public
Aug 12, 2026
Exhibit A CUI CCR CDRL Package0.pdf
12.71 MB
Controlled
Aug 12, 2026
Attachment 5. KC-135 CCR Section M - Evaluation Factors for Award0.pdf
318.28 KB
Public
Aug 12, 2026
Attachment 4. KC-135 CCR Section L - Instructions to Offerors02.pdf
537.8 KB
Public
Aug 12, 2026
Attachment 1. (CUI) KC-135 CCR Revision 2 Statement of Work (SOW).pdf
973.79 KB
Controlled
Aug 12, 2026
Attachment 8. TM-86-01R Air Force Technical Manual Contract Requirements (TMCR) CCR_REV2 1.pdf
591.48 KB
Controlled
Jul 28, 2026
Attachment 5. KC-135 - CCR Section M - Evaluation Factors for Award.pdf
317.72 KB
Public
Jul 28, 2026
Attachment 4 KC-135 - CCR Section L - Instructions to Offerors.pdf
537.64 KB
Public
Jul 28, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB - UPDATED (P) (2).xlsx
407.11 KB
Public
Jul 28, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME - UPDATED (P).xlsx
470.06 KB
Public
Jul 28, 2026
Attachment 1 (CUI) KC-135 CCR SOW Appendix D DD2794_KC-135 CCR.pdf
388.3 KB
Controlled
Jul 28, 2026
Attachment 1 (CUI) KC-135 CCR Revision 2 Statement of Work (SOW) 24 July 2026.pdf
978.04 KB
Controlled
Jul 28, 2026
Solicitation Amendment FA810526RB0010001 SF 30.pdf
694.67 KB
Public
Jul 28, 2026
Exhibit A CUI CCR CDRL Package.pdf
12.71 MB
Controlled
Jul 10, 2026
Attachment 9. DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Jul 10, 2026
Attachment 8. TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)CCR_REV2.pdf
560.33 KB
Public
Jul 10, 2026
Attachment 7. CUI CCR DD254.pdf
439.81 KB
Public
Jul 10, 2026
Attachment 6. - CUI CCR Revision 2 Data Rights Assertion Matrix-Working.xlsx
136.98 KB
Public
Jul 10, 2026
Attachment 5 KC-135 CCR Section M - Evaluation Factors for Award.pdf
317.37 KB
Public
Jul 10, 2026
Attachment 4 KC-135 CCR Section L - Instructions to Offerors.pdf
544 KB
Public
Jul 10, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB UPDATED2 (P).xlsx
388.56 KB
Public
Jul 10, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME - UPDATED3 (P).xlsx
465.28 KB
Public
Jul 10, 2026
Attachment 2. (CUI) KC-135 CCR SRD.pdf
813 KB
Controlled
Jul 10, 2026
Attachment 1. (CUI) KC-135 CCR Revision 2 Statement of Work (SOW) 09 July 26.pdf
999.79 KB
Controlled
Jul 10, 2026
Solicitation - FA810526RB001.pdf
1.7 MB
Public
Jul 10, 2026


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

The Center Console Refresh (CCR) program for the KC-135 tanker addresses critical obsolescence in the Fuel System, Flight Display System, and Flight Computer, with scope including autothrottle and future growth/adaptability. The anticipated contract is a single-award IDIQ with a Cost-Plus Incentive Fee for EMD and Firm Fixed Price for Production and Deployment, comprising a 48-month base period plus six 1-year options. The projected period of performance is July 2028 to June 2038. Access to view-controlled documents on SAM.gov requires an active DD2345 and CAGE code. Editable PDF versions of the solicitation and amendments are available, with all other terms and conditions unchanged.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Catina Baker
Not Given

Links (0)

Attachments (28)

Document
Size
Access
Updated
Solicitation Amendment FA810526RB0010002 SF 30 12Aug26.pdf
7.51 MB
Public
Aug 24, 2026
Solicitation Amendment FA810526RB0010001 SF 30 28Jul26.pdf
6.21 MB
Public
Aug 24, 2026
Solicitation - FA810526RB001 23Jun26.pdf
21.74 MB
Public
Aug 24, 2026
Solicitation Amendment FA810526RB0010002 SF 30.pdf
697.91 KB
Public
Aug 12, 2026
Exhibit A CUI CCR CDRL Package0.pdf
12.71 MB
Controlled
Aug 12, 2026
Attachment 5. KC-135 CCR Section M - Evaluation Factors for Award0.pdf
318.28 KB
Public
Aug 12, 2026
Attachment 4. KC-135 CCR Section L - Instructions to Offerors02.pdf
537.8 KB
Public
Aug 12, 2026
Attachment 1. (CUI) KC-135 CCR Revision 2 Statement of Work (SOW).pdf
973.79 KB
Controlled
Aug 12, 2026
Attachment 8. TM-86-01R Air Force Technical Manual Contract Requirements (TMCR) CCR_REV2 1.pdf
591.48 KB
Controlled
Jul 28, 2026
Attachment 5. KC-135 - CCR Section M - Evaluation Factors for Award.pdf
317.72 KB
Public
Jul 28, 2026
Attachment 4 KC-135 - CCR Section L - Instructions to Offerors.pdf
537.64 KB
Public
Jul 28, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB - UPDATED (P) (2).xlsx
407.11 KB
Public
Jul 28, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME - UPDATED (P).xlsx
470.06 KB
Public
Jul 28, 2026
Attachment 1 (CUI) KC-135 CCR SOW Appendix D DD2794_KC-135 CCR.pdf
388.3 KB
Controlled
Jul 28, 2026
Attachment 1 (CUI) KC-135 CCR Revision 2 Statement of Work (SOW) 24 July 2026.pdf
978.04 KB
Controlled
Jul 28, 2026
Solicitation Amendment FA810526RB0010001 SF 30.pdf
694.67 KB
Public
Jul 28, 2026
Exhibit A CUI CCR CDRL Package.pdf
12.71 MB
Controlled
Jul 10, 2026
Attachment 9. DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Jul 10, 2026
Attachment 8. TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)CCR_REV2.pdf
560.33 KB
Public
Jul 10, 2026
Attachment 7. CUI CCR DD254.pdf
439.81 KB
Public
Jul 10, 2026
Attachment 6. - CUI CCR Revision 2 Data Rights Assertion Matrix-Working.xlsx
136.98 KB
Public
Jul 10, 2026
Attachment 5 KC-135 CCR Section M - Evaluation Factors for Award.pdf
317.37 KB
Public
Jul 10, 2026
Attachment 4 KC-135 CCR Section L - Instructions to Offerors.pdf
544 KB
Public
Jul 10, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB UPDATED2 (P).xlsx
388.56 KB
Public
Jul 10, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME - UPDATED3 (P).xlsx
465.28 KB
Public
Jul 10, 2026
Attachment 2. (CUI) KC-135 CCR SRD.pdf
813 KB
Controlled
Jul 10, 2026
Attachment 1. (CUI) KC-135 CCR Revision 2 Statement of Work (SOW) 09 July 26.pdf
999.79 KB
Controlled
Jul 10, 2026
Solicitation - FA810526RB001.pdf
1.7 MB
Public
Jul 10, 2026


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This opportunity is for the KC-135 Center Console Refresh (CCR) Revision 2 program, with activities centered at Tinker Air Force Base, Oklahoma. The government has conducted multiple RFIs, virtual Industry Days, an aircraft tour, and posted draft SOW/SRD documents, pricing workbooks, and a bidder’s library with technical references. The procurement timeline includes draft RFP release around the end of February 2026, an Industry Day in March 2026, and full RFP release expected in May 2026. All communication must go through the contracting officer, and access to controlled documents requires an active DD2345 plus a SAM.gov role and cage code. Interested bidders should monitor attachment updates and prepare for a structured solicitation with pricing and evaluation requirements.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Catina Baker
Not Given

Links (0)

Attachments (139)

Document
Size
Access
Updated
CUI KC-135 CCR Industry Day Response - 11.pdf
168.25 KB
Controlled
Aug 24, 2026
CUI KC-135 CCR Industry Day Response - 10.pdf
98.42 KB
Controlled
Aug 14, 2026
CUI KC-135 CCR Industry Day Response - 9.pdf
81.66 KB
Controlled
Aug 6, 2026
CUI KC-135 CCR Industry Day Response - 8 (2).pdf
98.54 KB
Controlled
Jul 28, 2026
CUI KC-135 CCR Industry Day Response - 7.pdf
92.63 KB
Controlled
Jul 24, 2026
CUI KC-135 CCR Industry Day Response - 22.07.26 - 6.pdf
130.53 KB
Controlled
Jul 22, 2026
Tanker Specifications_D-15441_15Oct1965.pdf
19.49 MB
Controlled
Jul 9, 2026
KC-135_Re-Engine_ECP-458_D458-400261-1_29Sep1980.pdf
1.57 MB
Controlled
Jul 9, 2026
CUI KC-135 CCR Industry Day Response - 6.pdf
46.33 KB
Controlled
Jul 1, 2026
CUI KC-135 CCR Industry Day Response - 5.pdf
269.79 KB
Controlled
Jun 24, 2026
KC-135 CCR Questions for Industry Day 2026.03.16.pdf
653.23 KB
Controlled
May 28, 2026
Draft Solicitation - FA810526RB001 21 May 26.pdf
22.86 MB
Public
May 26, 2026
Attachment 2. (CUI) KC-135 CCR SRD.pdf
1.22 MB
Controlled
May 26, 2026
5. Attachment 5. KC-135 CCR DRAFT Section M - Evaluation Factors for Award.pdf
773.78 KB
Public
May 21, 2026
4. Attachment 4. KC-135 CCR DRAFT Section L - Instructions to Offerors (1).pdf
1.24 MB
Public
May 21, 2026
3. ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB UPDATED (P) - Draft.xlsx
407.39 KB
Public
May 21, 2026
3. ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME - UPDATED (P) - Draft.xlsx
468.92 KB
Public
May 21, 2026
1. (CUI) KC-135 CCR Revision 2 DRAFT Statement of Work (SOW).pdf
1.45 MB
Controlled
May 21, 2026
(CUI) DRAFT RFP Round Two.pdf
214.66 KB
Controlled
May 21, 2026
B45 ELA 818-3812-001_Rev_A (2).pdf
225.68 KB
Controlled
May 11, 2026
CUI KC-135 CCR Industry Day Responses-3.pdf
400.75 KB
Controlled
May 7, 2026
TO 00-5-16.pdf
2.72 MB
Controlled
May 5, 2026
In Person Industry Day Measurements KC-135 CCR Memo 05May2026.pdf
255.07 KB
Controlled
May 5, 2026
In Person Industry Day Pictures KC-135 CCR Memo 22Mar26 No Sign.pdf
222.91 KB
Controlled
Apr 28, 2026
(U) AFRL MBSE Style Guide v2-1.zip
13.93 MB
Controlled
Apr 23, 2026
(U) AFRL MBSE Style Guide v2-1.docx
14.33 MB
Controlled
Apr 23, 2026
(CUI) FA8105 CCR Rev2 Draft SOW RFI Response-3.pdf
486.39 KB
Controlled
Apr 15, 2026
(CUI) FA8105 CCR Rev2 Draft SRD RFI Response-3.pdf
319.42 KB
Controlled
Apr 15, 2026
CUI KC-135 CCR Industry Day Responses-2.pdf
585.31 KB
Controlled
Apr 15, 2026
Tinker PDM Aircraft Tour for KC-135 CCR.pdf
204.38 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Responses.pdf
357.27 KB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This notice pertains to the KC-

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Catina Baker
Not Given

Links (0)

Attachments (138)

Document
Size
Access
Updated
CUI KC-135 CCR Industry Day Response - 10.pdf
98.42 KB
Controlled
Aug 14, 2026
CUI KC-135 CCR Industry Day Response - 9.pdf
81.66 KB
Controlled
Aug 6, 2026
CUI KC-135 CCR Industry Day Response - 8 (2).pdf
98.54 KB
Controlled
Jul 28, 2026
CUI KC-135 CCR Industry Day Response - 7.pdf
92.63 KB
Controlled
Jul 24, 2026
CUI KC-135 CCR Industry Day Response - 22.07.26 - 6.pdf
130.53 KB
Controlled
Jul 22, 2026
Tanker Specifications_D-15441_15Oct1965.pdf
19.49 MB
Controlled
Jul 9, 2026
KC-135_Re-Engine_ECP-458_D458-400261-1_29Sep1980.pdf
1.57 MB
Controlled
Jul 9, 2026
CUI KC-135 CCR Industry Day Response - 6.pdf
46.33 KB
Controlled
Jul 1, 2026
CUI KC-135 CCR Industry Day Response - 5.pdf
269.79 KB
Controlled
Jun 24, 2026
KC-135 CCR Questions for Industry Day 2026.03.16.pdf
653.23 KB
Controlled
May 28, 2026
Draft Solicitation - FA810526RB001 21 May 26.pdf
22.86 MB
Public
May 26, 2026
Attachment 2. (CUI) KC-135 CCR SRD.pdf
1.22 MB
Controlled
May 26, 2026
5. Attachment 5. KC-135 CCR DRAFT Section M - Evaluation Factors for Award.pdf
773.78 KB
Public
May 21, 2026
4. Attachment 4. KC-135 CCR DRAFT Section L - Instructions to Offerors (1).pdf
1.24 MB
Public
May 21, 2026
3. ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB UPDATED (P) - Draft.xlsx
407.39 KB
Public
May 21, 2026
3. ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME - UPDATED (P) - Draft.xlsx
468.92 KB
Public
May 21, 2026
1. (CUI) KC-135 CCR Revision 2 DRAFT Statement of Work (SOW).pdf
1.45 MB
Controlled
May 21, 2026
(CUI) DRAFT RFP Round Two.pdf
214.66 KB
Controlled
May 21, 2026
B45 ELA 818-3812-001_Rev_A (2).pdf
225.68 KB
Controlled
May 11, 2026
CUI KC-135 CCR Industry Day Responses-3.pdf
400.75 KB
Controlled
May 7, 2026
TO 00-5-16.pdf
2.72 MB
Controlled
May 5, 2026
In Person Industry Day Measurements KC-135 CCR Memo 05May2026.pdf
255.07 KB
Controlled
May 5, 2026
In Person Industry Day Pictures KC-135 CCR Memo 22Mar26 No Sign.pdf
222.91 KB
Controlled
Apr 28, 2026
(U) AFRL MBSE Style Guide v2-1.zip
13.93 MB
Controlled
Apr 23, 2026
(U) AFRL MBSE Style Guide v2-1.docx
14.33 MB
Controlled
Apr 23, 2026
(CUI) FA8105 CCR Rev2 Draft SOW RFI Response-3.pdf
486.39 KB
Controlled
Apr 15, 2026
(CUI) FA8105 CCR Rev2 Draft SRD RFI Response-3.pdf
319.42 KB
Controlled
Apr 15, 2026
CUI KC-135 CCR Industry Day Responses-2.pdf
585.31 KB
Controlled
Apr 15, 2026
Tinker PDM Aircraft Tour for KC-135 CCR.pdf
204.38 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Responses.pdf
357.27 KB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

The KC-135 Center Console Refresh program addresses critical obsolescence in the refueling tanker's Fuel System, Flight Display System, and Flight Computer, with scope including autothrottle systems and future growth/adaptability. The anticipated contract is a single-award IDIQ with a Cost-Plus Incentive Fee structure for EMD and Firm Fixed Price for Production and Deployment, comprising one 48-month base period plus six one-year options. The projected period of performance is July 2028 through June 2038. Access to view-controlled documents requires an active DD2345 and a SAM.gov role with CAGE code submission. This opportunity seeks turn-key solutions that improve supportability and enable future system growth.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Catina Baker
Not Given

Links (0)

Attachments (25)

Document
Size
Access
Updated
Solicitation Amendment FA810526RB0010002 SF 30.pdf
697.91 KB
Public
Aug 12, 2026
Exhibit A CUI CCR CDRL Package0.pdf
12.71 MB
Controlled
Aug 12, 2026
Attachment 5. KC-135 CCR Section M - Evaluation Factors for Award0.pdf
318.28 KB
Public
Aug 12, 2026
Attachment 4. KC-135 CCR Section L - Instructions to Offerors02.pdf
537.8 KB
Public
Aug 12, 2026
Attachment 1. (CUI) KC-135 CCR Revision 2 Statement of Work (SOW).pdf
973.79 KB
Controlled
Aug 12, 2026
Attachment 8. TM-86-01R Air Force Technical Manual Contract Requirements (TMCR) CCR_REV2 1.pdf
591.48 KB
Controlled
Jul 28, 2026
Attachment 5. KC-135 - CCR Section M - Evaluation Factors for Award.pdf
317.72 KB
Public
Jul 28, 2026
Attachment 4 KC-135 - CCR Section L - Instructions to Offerors.pdf
537.64 KB
Public
Jul 28, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB - UPDATED (P) (2).xlsx
407.11 KB
Public
Jul 28, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME - UPDATED (P).xlsx
470.06 KB
Public
Jul 28, 2026
Attachment 1 (CUI) KC-135 CCR SOW Appendix D DD2794_KC-135 CCR.pdf
388.3 KB
Controlled
Jul 28, 2026
Attachment 1 (CUI) KC-135 CCR Revision 2 Statement of Work (SOW) 24 July 2026.pdf
978.04 KB
Controlled
Jul 28, 2026
Solicitation Amendment FA810526RB0010001 SF 30.pdf
694.67 KB
Public
Jul 28, 2026
Exhibit A CUI CCR CDRL Package.pdf
12.71 MB
Controlled
Jul 10, 2026
Attachment 9. DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Jul 10, 2026
Attachment 8. TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)CCR_REV2.pdf
560.33 KB
Public
Jul 10, 2026
Attachment 7. CUI CCR DD254.pdf
439.81 KB
Public
Jul 10, 2026
Attachment 6. - CUI CCR Revision 2 Data Rights Assertion Matrix-Working.xlsx
136.98 KB
Public
Jul 10, 2026
Attachment 5 KC-135 CCR Section M - Evaluation Factors for Award.pdf
317.37 KB
Public
Jul 10, 2026
Attachment 4 KC-135 CCR Section L - Instructions to Offerors.pdf
544 KB
Public
Jul 10, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB UPDATED2 (P).xlsx
388.56 KB
Public
Jul 10, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME - UPDATED3 (P).xlsx
465.28 KB
Public
Jul 10, 2026
Attachment 2. (CUI) KC-135 CCR SRD.pdf
813 KB
Controlled
Jul 10, 2026
Attachment 1. (CUI) KC-135 CCR Revision 2 Statement of Work (SOW) 09 July 26.pdf
999.79 KB
Controlled
Jul 10, 2026
Solicitation - FA810526RB001.pdf
1.7 MB
Public
Jul 10, 2026


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

The KC-135 Center Console Refresh (CCR) Revision 2 effort is progressing through pre-solicitation activities, including RFIs, virtual industry days, and draft SOW/SRD and pricing workbooks. A draft RFP is planned for end of February 2026, followed by an Industry Day in March 2026, with the full RFP expected in May 2026. The government has updated Q&A documents, added bidder’s library materials, and emphasized that all questions must be submitted in writing to the PCO. Industry events, including an aircraft tour, are associated with Tinker Air Force Base. Controlled documents require an active DD2345 and appropriate sam.gov role for access.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Catina Baker
Not Given

Links (0)

Attachments (137)

Document
Size
Access
Updated
CUI KC-135 CCR Industry Day Response - 9.pdf
81.66 KB
Controlled
Aug 6, 2026
CUI KC-135 CCR Industry Day Response - 8 (2).pdf
98.54 KB
Controlled
Jul 28, 2026
CUI KC-135 CCR Industry Day Response - 7.pdf
92.63 KB
Controlled
Jul 24, 2026
CUI KC-135 CCR Industry Day Response - 22.07.26 - 6.pdf
130.53 KB
Controlled
Jul 22, 2026
Tanker Specifications_D-15441_15Oct1965.pdf
19.49 MB
Controlled
Jul 9, 2026
KC-135_Re-Engine_ECP-458_D458-400261-1_29Sep1980.pdf
1.57 MB
Controlled
Jul 9, 2026
CUI KC-135 CCR Industry Day Response - 6.pdf
46.33 KB
Controlled
Jul 1, 2026
CUI KC-135 CCR Industry Day Response - 5.pdf
269.79 KB
Controlled
Jun 24, 2026
KC-135 CCR Questions for Industry Day 2026.03.16.pdf
653.23 KB
Controlled
May 28, 2026
Draft Solicitation - FA810526RB001 21 May 26.pdf
22.86 MB
Public
May 26, 2026
Attachment 2. (CUI) KC-135 CCR SRD.pdf
1.22 MB
Controlled
May 26, 2026
5. Attachment 5. KC-135 CCR DRAFT Section M - Evaluation Factors for Award.pdf
773.78 KB
Public
May 21, 2026
4. Attachment 4. KC-135 CCR DRAFT Section L - Instructions to Offerors (1).pdf
1.24 MB
Public
May 21, 2026
3. ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB UPDATED (P) - Draft.xlsx
407.39 KB
Public
May 21, 2026
3. ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME - UPDATED (P) - Draft.xlsx
468.92 KB
Public
May 21, 2026
1. (CUI) KC-135 CCR Revision 2 DRAFT Statement of Work (SOW).pdf
1.45 MB
Controlled
May 21, 2026
(CUI) DRAFT RFP Round Two.pdf
214.66 KB
Controlled
May 21, 2026
B45 ELA 818-3812-001_Rev_A (2).pdf
225.68 KB
Controlled
May 11, 2026
CUI KC-135 CCR Industry Day Responses-3.pdf
400.75 KB
Controlled
May 7, 2026
TO 00-5-16.pdf
2.72 MB
Controlled
May 5, 2026
In Person Industry Day Measurements KC-135 CCR Memo 05May2026.pdf
255.07 KB
Controlled
May 5, 2026
In Person Industry Day Pictures KC-135 CCR Memo 22Mar26 No Sign.pdf
222.91 KB
Controlled
Apr 28, 2026
(U) AFRL MBSE Style Guide v2-1.zip
13.93 MB
Controlled
Apr 23, 2026
(U) AFRL MBSE Style Guide v2-1.docx
14.33 MB
Controlled
Apr 23, 2026
(CUI) FA8105 CCR Rev2 Draft SOW RFI Response-3.pdf
486.39 KB
Controlled
Apr 15, 2026
(CUI) FA8105 CCR Rev2 Draft SRD RFI Response-3.pdf
319.42 KB
Controlled
Apr 15, 2026
CUI KC-135 CCR Industry Day Responses-2.pdf
585.31 KB
Controlled
Apr 15, 2026
Tinker PDM Aircraft Tour for KC-135 CCR.pdf
204.38 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Responses.pdf
357.27 KB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

The KC-135 Center Console Refresh program aims to replace and improve the aircraft's Fuel System, Flight Display System, Flight Computer, and autothrottle with turn-key solutions for supportability and future growth. The anticipated contract is a single-award IDIQ with a Cost-Plus Incentive Fee for EMD and Firm Fixed Price for Production and Deployment, structured as one 48-month base period plus six one-year options. The projected period of performance runs from July 2028 to June 2038. No specific budget amounts or performance location are provided in the description. Interested bidders must have an active DD2345 on file and a SAM.gov role to access controlled documents.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Catina Baker
Not Given

Links (0)

Attachments (20)

Document
Size
Access
Updated
Attachment 8. TM-86-01R Air Force Technical Manual Contract Requirements (TMCR) CCR_REV2 1.pdf
591.48 KB
Controlled
Jul 28, 2026
Attachment 5. KC-135 - CCR Section M - Evaluation Factors for Award.pdf
317.72 KB
Public
Jul 28, 2026
Attachment 4 KC-135 - CCR Section L - Instructions to Offerors.pdf
537.64 KB
Public
Jul 28, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB - UPDATED (P) (2).xlsx
407.11 KB
Public
Jul 28, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME - UPDATED (P).xlsx
470.06 KB
Public
Jul 28, 2026
Attachment 1 (CUI) KC-135 CCR SOW Appendix D DD2794_KC-135 CCR.pdf
388.3 KB
Controlled
Jul 28, 2026
Attachment 1 (CUI) KC-135 CCR Revision 2 Statement of Work (SOW) 24 July 2026.pdf
978.04 KB
Controlled
Jul 28, 2026
Solicitation Amendment FA810526RB0010001 SF 30.pdf
694.67 KB
Public
Jul 28, 2026
Exhibit A CUI CCR CDRL Package.pdf
12.71 MB
Controlled
Jul 10, 2026
Attachment 9. DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Jul 10, 2026
Attachment 8. TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)CCR_REV2.pdf
560.33 KB
Public
Jul 10, 2026
Attachment 7. CUI CCR DD254.pdf
439.81 KB
Public
Jul 10, 2026
Attachment 6. - CUI CCR Revision 2 Data Rights Assertion Matrix-Working.xlsx
136.98 KB
Public
Jul 10, 2026
Attachment 5 KC-135 CCR Section M - Evaluation Factors for Award.pdf
317.37 KB
Public
Jul 10, 2026
Attachment 4 KC-135 CCR Section L - Instructions to Offerors.pdf
544 KB
Public
Jul 10, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB UPDATED2 (P).xlsx
388.56 KB
Public
Jul 10, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME - UPDATED3 (P).xlsx
465.28 KB
Public
Jul 10, 2026
Attachment 2. (CUI) KC-135 CCR SRD.pdf
813 KB
Controlled
Jul 10, 2026
Attachment 1. (CUI) KC-135 CCR Revision 2 Statement of Work (SOW) 09 July 26.pdf
999.79 KB
Controlled
Jul 10, 2026
Solicitation - FA810526RB001.pdf
1.7 MB
Public
Jul 10, 2026


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This opportunity is for the KC-135 Center Console Refresh (CCR) Revision 2 program. The government released a Draft RFP in February 2026 and expects to release the final RFP in May 2026. An Industry Day and aircraft tour were conducted at Tinker Air Force Base. Draft documents including the Statement of Work, System Requirements Document, and pricing workbooks have been provided for review. All questions and communications must be directed exclusively to the Contracting Officer.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Catina Baker
Not Given

Links (0)

Attachments (136)

Document
Size
Access
Updated
CUI KC-135 CCR Industry Day Response - 8 (2).pdf
98.54 KB
Controlled
Jul 28, 2026
CUI KC-135 CCR Industry Day Response - 7.pdf
92.63 KB
Controlled
Jul 24, 2026
CUI KC-135 CCR Industry Day Response - 22.07.26 - 6.pdf
130.53 KB
Controlled
Jul 22, 2026
Tanker Specifications_D-15441_15Oct1965.pdf
19.49 MB
Controlled
Jul 9, 2026
KC-135_Re-Engine_ECP-458_D458-400261-1_29Sep1980.pdf
1.57 MB
Controlled
Jul 9, 2026
CUI KC-135 CCR Industry Day Response - 6.pdf
46.33 KB
Controlled
Jul 1, 2026
CUI KC-135 CCR Industry Day Response - 5.pdf
269.79 KB
Controlled
Jun 24, 2026
KC-135 CCR Questions for Industry Day 2026.03.16.pdf
653.23 KB
Controlled
May 28, 2026
Draft Solicitation - FA810526RB001 21 May 26.pdf
22.86 MB
Public
May 26, 2026
Attachment 2. (CUI) KC-135 CCR SRD.pdf
1.22 MB
Controlled
May 26, 2026
5. Attachment 5. KC-135 CCR DRAFT Section M - Evaluation Factors for Award.pdf
773.78 KB
Public
May 21, 2026
4. Attachment 4. KC-135 CCR DRAFT Section L - Instructions to Offerors (1).pdf
1.24 MB
Public
May 21, 2026
3. ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB UPDATED (P) - Draft.xlsx
407.39 KB
Public
May 21, 2026
3. ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME - UPDATED (P) - Draft.xlsx
468.92 KB
Public
May 21, 2026
1. (CUI) KC-135 CCR Revision 2 DRAFT Statement of Work (SOW).pdf
1.45 MB
Controlled
May 21, 2026
(CUI) DRAFT RFP Round Two.pdf
214.66 KB
Controlled
May 21, 2026
B45 ELA 818-3812-001_Rev_A (2).pdf
225.68 KB
Controlled
May 11, 2026
CUI KC-135 CCR Industry Day Responses-3.pdf
400.75 KB
Controlled
May 7, 2026
TO 00-5-16.pdf
2.72 MB
Controlled
May 5, 2026
In Person Industry Day Measurements KC-135 CCR Memo 05May2026.pdf
255.07 KB
Controlled
May 5, 2026
In Person Industry Day Pictures KC-135 CCR Memo 22Mar26 No Sign.pdf
222.91 KB
Controlled
Apr 28, 2026
(U) AFRL MBSE Style Guide v2-1.zip
13.93 MB
Controlled
Apr 23, 2026
(U) AFRL MBSE Style Guide v2-1.docx
14.33 MB
Controlled
Apr 23, 2026
(CUI) FA8105 CCR Rev2 Draft SOW RFI Response-3.pdf
486.39 KB
Controlled
Apr 15, 2026
(CUI) FA8105 CCR Rev2 Draft SRD RFI Response-3.pdf
319.42 KB
Controlled
Apr 15, 2026
CUI KC-135 CCR Industry Day Responses-2.pdf
585.31 KB
Controlled
Apr 15, 2026
Tinker PDM Aircraft Tour for KC-135 CCR.pdf
204.38 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Responses.pdf
357.27 KB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

The KC-135 Center Console Refresh (CCR) Revision 2 program is moving toward a Draft RFP release in February/March 2026, with the full RFP expected in May 2026. A virtual Industry Day was conducted in March 2026, including an aircraft tour at Tinker Air Force Base. The Government has continuously updated Q&A documents and the bidder’s library with technical orders, draft statements of work, and system requirements. All communications must be directed solely to the Contracting Officer, Brandi Shelden, to ensure procurement integrity. No budget amount is specified, and performance location is associated with Tinker AFB.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Catina Baker
Not Given

Links (0)

Attachments (135)

Document
Size
Access
Updated
CUI KC-135 CCR Industry Day Response - 7.pdf
92.63 KB
Controlled
Jul 24, 2026
CUI KC-135 CCR Industry Day Response - 22.07.26 - 6.pdf
130.53 KB
Controlled
Jul 22, 2026
Tanker Specifications_D-15441_15Oct1965.pdf
19.49 MB
Controlled
Jul 9, 2026
KC-135_Re-Engine_ECP-458_D458-400261-1_29Sep1980.pdf
1.57 MB
Controlled
Jul 9, 2026
CUI KC-135 CCR Industry Day Response - 6.pdf
46.33 KB
Controlled
Jul 1, 2026
CUI KC-135 CCR Industry Day Response - 5.pdf
269.79 KB
Controlled
Jun 24, 2026
KC-135 CCR Questions for Industry Day 2026.03.16.pdf
653.23 KB
Controlled
May 28, 2026
Draft Solicitation - FA810526RB001 21 May 26.pdf
22.86 MB
Public
May 26, 2026
Attachment 2. (CUI) KC-135 CCR SRD.pdf
1.22 MB
Controlled
May 26, 2026
5. Attachment 5. KC-135 CCR DRAFT Section M - Evaluation Factors for Award.pdf
773.78 KB
Public
May 21, 2026
4. Attachment 4. KC-135 CCR DRAFT Section L - Instructions to Offerors (1).pdf
1.24 MB
Public
May 21, 2026
3. ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB UPDATED (P) - Draft.xlsx
407.39 KB
Public
May 21, 2026
3. ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME - UPDATED (P) - Draft.xlsx
468.92 KB
Public
May 21, 2026
1. (CUI) KC-135 CCR Revision 2 DRAFT Statement of Work (SOW).pdf
1.45 MB
Controlled
May 21, 2026
(CUI) DRAFT RFP Round Two.pdf
214.66 KB
Controlled
May 21, 2026
B45 ELA 818-3812-001_Rev_A (2).pdf
225.68 KB
Controlled
May 11, 2026
CUI KC-135 CCR Industry Day Responses-3.pdf
400.75 KB
Controlled
May 7, 2026
TO 00-5-16.pdf
2.72 MB
Controlled
May 5, 2026
In Person Industry Day Measurements KC-135 CCR Memo 05May2026.pdf
255.07 KB
Controlled
May 5, 2026
In Person Industry Day Pictures KC-135 CCR Memo 22Mar26 No Sign.pdf
222.91 KB
Controlled
Apr 28, 2026
(U) AFRL MBSE Style Guide v2-1.zip
13.93 MB
Controlled
Apr 23, 2026
(U) AFRL MBSE Style Guide v2-1.docx
14.33 MB
Controlled
Apr 23, 2026
(CUI) FA8105 CCR Rev2 Draft SOW RFI Response-3.pdf
486.39 KB
Controlled
Apr 15, 2026
(CUI) FA8105 CCR Rev2 Draft SRD RFI Response-3.pdf
319.42 KB
Controlled
Apr 15, 2026
CUI KC-135 CCR Industry Day Responses-2.pdf
585.31 KB
Controlled
Apr 15, 2026
Tinker PDM Aircraft Tour for KC-135 CCR.pdf
204.38 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Responses.pdf
357.27 KB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This opportunity is for the KC-135 Center Console Refresh (CCR) Revision 2 program, with performance expected at Tinker Air Force Base. The Government has released a Draft Solicitation, Statement of Work (SOW), and System Requirements Document (SRD) for industry review. All questions and communications must be directed exclusively to the Contracting Officer, Brandi Shelden, in writing. A virtual Industry Day was held in March 2026, and an aircraft tour at Tinker AFB was conducted in April 2026. The full Request for Proposal (RFP) release is currently expected in May 2026.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Catina Baker
Not Given

Links (0)

Attachments (134)

Document
Size
Access
Updated
CUI KC-135 CCR Industry Day Response - 22.07.26 - 6.pdf
130.53 KB
Controlled
Jul 22, 2026
Tanker Specifications_D-15441_15Oct1965.pdf
19.49 MB
Controlled
Jul 9, 2026
KC-135_Re-Engine_ECP-458_D458-400261-1_29Sep1980.pdf
1.57 MB
Controlled
Jul 9, 2026
CUI KC-135 CCR Industry Day Response - 6.pdf
46.33 KB
Controlled
Jul 1, 2026
CUI KC-135 CCR Industry Day Response - 5.pdf
269.79 KB
Controlled
Jun 24, 2026
KC-135 CCR Questions for Industry Day 2026.03.16.pdf
653.23 KB
Controlled
May 28, 2026
Draft Solicitation - FA810526RB001 21 May 26.pdf
22.86 MB
Public
May 26, 2026
Attachment 2. (CUI) KC-135 CCR SRD.pdf
1.22 MB
Controlled
May 26, 2026
5. Attachment 5. KC-135 CCR DRAFT Section M - Evaluation Factors for Award.pdf
773.78 KB
Public
May 21, 2026
4. Attachment 4. KC-135 CCR DRAFT Section L - Instructions to Offerors (1).pdf
1.24 MB
Public
May 21, 2026
3. ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB UPDATED (P) - Draft.xlsx
407.39 KB
Public
May 21, 2026
3. ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME - UPDATED (P) - Draft.xlsx
468.92 KB
Public
May 21, 2026
1. (CUI) KC-135 CCR Revision 2 DRAFT Statement of Work (SOW).pdf
1.45 MB
Controlled
May 21, 2026
(CUI) DRAFT RFP Round Two.pdf
214.66 KB
Controlled
May 21, 2026
B45 ELA 818-3812-001_Rev_A (2).pdf
225.68 KB
Controlled
May 11, 2026
CUI KC-135 CCR Industry Day Responses-3.pdf
400.75 KB
Controlled
May 7, 2026
TO 00-5-16.pdf
2.72 MB
Controlled
May 5, 2026
In Person Industry Day Measurements KC-135 CCR Memo 05May2026.pdf
255.07 KB
Controlled
May 5, 2026
In Person Industry Day Pictures KC-135 CCR Memo 22Mar26 No Sign.pdf
222.91 KB
Controlled
Apr 28, 2026
(U) AFRL MBSE Style Guide v2-1.zip
13.93 MB
Controlled
Apr 23, 2026
(U) AFRL MBSE Style Guide v2-1.docx
14.33 MB
Controlled
Apr 23, 2026
(CUI) FA8105 CCR Rev2 Draft SOW RFI Response-3.pdf
486.39 KB
Controlled
Apr 15, 2026
(CUI) FA8105 CCR Rev2 Draft SRD RFI Response-3.pdf
319.42 KB
Controlled
Apr 15, 2026
CUI KC-135 CCR Industry Day Responses-2.pdf
585.31 KB
Controlled
Apr 15, 2026
Tinker PDM Aircraft Tour for KC-135 CCR.pdf
204.38 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Responses.pdf
357.27 KB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

The US Air Force seeks innovative, turn-key solutions to address critical obsolescence in the KC-135's Fuel System, Flight Display System, and Flight Computer, including the addition of autothrottle systems. The contract will be a single award IDIQ with a Cost-Plus Incentive Fee for EMD and Firm Fixed Price for production. The performance period is projected from July 2028 to June 2038. No specific budget amount is mentioned. The location for performance of services is not specified.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This opportunity is for the KC-135 Center Console Refresh (CCR) Revision 2 program, with performance expected at Tinker Air Force Base. The Government has released a Draft RFP, Draft SOW, and Draft SRD, and has emphasized that all procurement-related questions must be directed exclusively to the Contracting Officer (PCO). A full RFP release is currently expected in May 2026. The Government has conducted industry days and aircraft tours to support bidder understanding. All prospective offerors must have an active DD2345 on file and a SAM.gov role to access controlled documents.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Catina Baker
Not Given

Links (0)

Attachments (133)

Document
Size
Access
Updated
Tanker Specifications_D-15441_15Oct1965.pdf
19.49 MB
Controlled
Jul 9, 2026
KC-135_Re-Engine_ECP-458_D458-400261-1_29Sep1980.pdf
1.57 MB
Controlled
Jul 9, 2026
CUI KC-135 CCR Industry Day Response - 6.pdf
46.33 KB
Controlled
Jul 1, 2026
CUI KC-135 CCR Industry Day Response - 5.pdf
269.79 KB
Controlled
Jun 24, 2026
KC-135 CCR Questions for Industry Day 2026.03.16.pdf
653.23 KB
Controlled
May 28, 2026
Draft Solicitation - FA810526RB001 21 May 26.pdf
22.86 MB
Public
May 26, 2026
Attachment 2. (CUI) KC-135 CCR SRD.pdf
1.22 MB
Controlled
May 26, 2026
5. Attachment 5. KC-135 CCR DRAFT Section M - Evaluation Factors for Award.pdf
773.78 KB
Public
May 21, 2026
4. Attachment 4. KC-135 CCR DRAFT Section L - Instructions to Offerors (1).pdf
1.24 MB
Public
May 21, 2026
3. ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB UPDATED (P) - Draft.xlsx
407.39 KB
Public
May 21, 2026
3. ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME - UPDATED (P) - Draft.xlsx
468.92 KB
Public
May 21, 2026
1. (CUI) KC-135 CCR Revision 2 DRAFT Statement of Work (SOW).pdf
1.45 MB
Controlled
May 21, 2026
(CUI) DRAFT RFP Round Two.pdf
214.66 KB
Controlled
May 21, 2026
B45 ELA 818-3812-001_Rev_A (2).pdf
225.68 KB
Controlled
May 11, 2026
CUI KC-135 CCR Industry Day Responses-3.pdf
400.75 KB
Controlled
May 7, 2026
TO 00-5-16.pdf
2.72 MB
Controlled
May 5, 2026
In Person Industry Day Measurements KC-135 CCR Memo 05May2026.pdf
255.07 KB
Controlled
May 5, 2026
In Person Industry Day Pictures KC-135 CCR Memo 22Mar26 No Sign.pdf
222.91 KB
Controlled
Apr 28, 2026
(U) AFRL MBSE Style Guide v2-1.zip
13.93 MB
Controlled
Apr 23, 2026
(U) AFRL MBSE Style Guide v2-1.docx
14.33 MB
Controlled
Apr 23, 2026
(CUI) FA8105 CCR Rev2 Draft SOW RFI Response-3.pdf
486.39 KB
Controlled
Apr 15, 2026
(CUI) FA8105 CCR Rev2 Draft SRD RFI Response-3.pdf
319.42 KB
Controlled
Apr 15, 2026
CUI KC-135 CCR Industry Day Responses-2.pdf
585.31 KB
Controlled
Apr 15, 2026
Tinker PDM Aircraft Tour for KC-135 CCR.pdf
204.38 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Responses.pdf
357.27 KB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

The KC-135 Center Console Refresh (CCR) Revision 2 program is a government acquisition to update aircraft cockpit systems. Performance of services will be at Tinker Air Force Base. The draft solicitation was released in early 2026, with the full RFP expected in May 2026. No specific budget amount is mentioned in the description. All questions must be directed to the Contracting Officer, Brandi Shelden.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Catina Baker
Not Given

Links (0)

Attachments (131)

Document
Size
Access
Updated
CUI KC-135 CCR Industry Day Response - 6.pdf
46.33 KB
Controlled
Jul 1, 2026
CUI KC-135 CCR Industry Day Response - 5.pdf
269.79 KB
Controlled
Jun 24, 2026
KC-135 CCR Questions for Industry Day 2026.03.16.pdf
653.23 KB
Controlled
May 28, 2026
Draft Solicitation - FA810526RB001 21 May 26.pdf
22.86 MB
Public
May 26, 2026
Attachment 2. (CUI) KC-135 CCR SRD.pdf
1.22 MB
Controlled
May 26, 2026
5. Attachment 5. KC-135 CCR DRAFT Section M - Evaluation Factors for Award.pdf
773.78 KB
Public
May 21, 2026
4. Attachment 4. KC-135 CCR DRAFT Section L - Instructions to Offerors (1).pdf
1.24 MB
Public
May 21, 2026
3. ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB UPDATED (P) - Draft.xlsx
407.39 KB
Public
May 21, 2026
3. ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME - UPDATED (P) - Draft.xlsx
468.92 KB
Public
May 21, 2026
1. (CUI) KC-135 CCR Revision 2 DRAFT Statement of Work (SOW).pdf
1.45 MB
Controlled
May 21, 2026
(CUI) DRAFT RFP Round Two.pdf
214.66 KB
Controlled
May 21, 2026
B45 ELA 818-3812-001_Rev_A (2).pdf
225.68 KB
Controlled
May 11, 2026
CUI KC-135 CCR Industry Day Responses-3.pdf
400.75 KB
Controlled
May 7, 2026
TO 00-5-16.pdf
2.72 MB
Controlled
May 5, 2026
In Person Industry Day Measurements KC-135 CCR Memo 05May2026.pdf
255.07 KB
Controlled
May 5, 2026
In Person Industry Day Pictures KC-135 CCR Memo 22Mar26 No Sign.pdf
222.91 KB
Controlled
Apr 28, 2026
(U) AFRL MBSE Style Guide v2-1.zip
13.93 MB
Controlled
Apr 23, 2026
(U) AFRL MBSE Style Guide v2-1.docx
14.33 MB
Controlled
Apr 23, 2026
(CUI) FA8105 CCR Rev2 Draft SOW RFI Response-3.pdf
486.39 KB
Controlled
Apr 15, 2026
(CUI) FA8105 CCR Rev2 Draft SRD RFI Response-3.pdf
319.42 KB
Controlled
Apr 15, 2026
CUI KC-135 CCR Industry Day Responses-2.pdf
585.31 KB
Controlled
Apr 15, 2026
Tinker PDM Aircraft Tour for KC-135 CCR.pdf
204.38 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Responses.pdf
357.27 KB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This opportunity is for the KC-135 Center Console Refresh (CCR) Revision 2 program, with performance expected at Tinker Air Force Base. The full Request for Proposal (RFP) release is currently expected in May 2026, following a Draft RFP released in February 2026 and an Industry Day in March 2026. All questions and communications must be directed exclusively in writing to the Contracting Officer, Brandi Shelden, to ensure procurement integrity. The government has released draft Statements of Work, System Requirements Documents, and pricing workbooks, and has updated the proposal response due date to 31 July 2026. No specific budget amount has been provided in this description.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Catina Baker
Not Given

Links (0)

Attachments (130)

Document
Size
Access
Updated
CUI KC-135 CCR Industry Day Response - 5.pdf
269.79 KB
Controlled
Jun 24, 2026
KC-135 CCR Questions for Industry Day 2026.03.16.pdf
653.23 KB
Controlled
May 28, 2026
Draft Solicitation - FA810526RB001 21 May 26.pdf
22.86 MB
Public
May 26, 2026
Attachment 2. (CUI) KC-135 CCR SRD.pdf
1.22 MB
Controlled
May 26, 2026
5. Attachment 5. KC-135 CCR DRAFT Section M - Evaluation Factors for Award.pdf
773.78 KB
Public
May 21, 2026
4. Attachment 4. KC-135 CCR DRAFT Section L - Instructions to Offerors (1).pdf
1.24 MB
Public
May 21, 2026
3. ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB UPDATED (P) - Draft.xlsx
407.39 KB
Public
May 21, 2026
3. ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME - UPDATED (P) - Draft.xlsx
468.92 KB
Public
May 21, 2026
1. (CUI) KC-135 CCR Revision 2 DRAFT Statement of Work (SOW).pdf
1.45 MB
Controlled
May 21, 2026
(CUI) DRAFT RFP Round Two.pdf
214.66 KB
Controlled
May 21, 2026
B45 ELA 818-3812-001_Rev_A (2).pdf
225.68 KB
Controlled
May 11, 2026
CUI KC-135 CCR Industry Day Responses-3.pdf
400.75 KB
Controlled
May 7, 2026
TO 00-5-16.pdf
2.72 MB
Controlled
May 5, 2026
In Person Industry Day Measurements KC-135 CCR Memo 05May2026.pdf
255.07 KB
Controlled
May 5, 2026
In Person Industry Day Pictures KC-135 CCR Memo 22Mar26 No Sign.pdf
222.91 KB
Controlled
Apr 28, 2026
(U) AFRL MBSE Style Guide v2-1.zip
13.93 MB
Controlled
Apr 23, 2026
(U) AFRL MBSE Style Guide v2-1.docx
14.33 MB
Controlled
Apr 23, 2026
(CUI) FA8105 CCR Rev2 Draft SOW RFI Response-3.pdf
486.39 KB
Controlled
Apr 15, 2026
(CUI) FA8105 CCR Rev2 Draft SRD RFI Response-3.pdf
319.42 KB
Controlled
Apr 15, 2026
CUI KC-135 CCR Industry Day Responses-2.pdf
585.31 KB
Controlled
Apr 15, 2026
Tinker PDM Aircraft Tour for KC-135 CCR.pdf
204.38 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Responses.pdf
357.27 KB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This opportunity is for the KC-135 Center Console Refresh (CCR) Revision 2 program, with performance expected at Tinker Air Force Base. The Government has released a Draft RFP, Draft SOW, and Draft SRD, with a Full RFP release currently expected in May 2026. All questions and communications must be directed in writing solely to the Contracting Officer, Brandi Shelden. Key documents, including draft solicitations, pricing workbooks, and Q&A responses, have been uploaded to the Bidder’s Library. An Industry Day and aircraft tour were held in March 2026 to provide further details.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Catina Baker
Not Given

Links (0)

Attachments (129)

Document
Size
Access
Updated
KC-135 CCR Questions for Industry Day 2026.03.16.pdf
653.23 KB
Controlled
May 28, 2026
Draft Solicitation - FA810526RB001 21 May 26.pdf
22.86 MB
Public
May 26, 2026
Attachment 2. (CUI) KC-135 CCR SRD.pdf
1.22 MB
Controlled
May 26, 2026
5. Attachment 5. KC-135 CCR DRAFT Section M - Evaluation Factors for Award.pdf
773.78 KB
Public
May 21, 2026
4. Attachment 4. KC-135 CCR DRAFT Section L - Instructions to Offerors (1).pdf
1.24 MB
Public
May 21, 2026
3. ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB UPDATED (P) - Draft.xlsx
407.39 KB
Public
May 21, 2026
3. ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME - UPDATED (P) - Draft.xlsx
468.92 KB
Public
May 21, 2026
1. (CUI) KC-135 CCR Revision 2 DRAFT Statement of Work (SOW).pdf
1.45 MB
Controlled
May 21, 2026
(CUI) DRAFT RFP Round Two.pdf
214.66 KB
Controlled
May 21, 2026
B45 ELA 818-3812-001_Rev_A (2).pdf
225.68 KB
Controlled
May 11, 2026
CUI KC-135 CCR Industry Day Responses-3.pdf
400.75 KB
Controlled
May 7, 2026
TO 00-5-16.pdf
2.72 MB
Controlled
May 5, 2026
In Person Industry Day Measurements KC-135 CCR Memo 05May2026.pdf
255.07 KB
Controlled
May 5, 2026
In Person Industry Day Pictures KC-135 CCR Memo 22Mar26 No Sign.pdf
222.91 KB
Controlled
Apr 28, 2026
(U) AFRL MBSE Style Guide v2-1.zip
13.93 MB
Controlled
Apr 23, 2026
(U) AFRL MBSE Style Guide v2-1.docx
14.33 MB
Controlled
Apr 23, 2026
(CUI) FA8105 CCR Rev2 Draft SOW RFI Response-3.pdf
486.39 KB
Controlled
Apr 15, 2026
(CUI) FA8105 CCR Rev2 Draft SRD RFI Response-3.pdf
319.42 KB
Controlled
Apr 15, 2026
CUI KC-135 CCR Industry Day Responses-2.pdf
585.31 KB
Controlled
Apr 15, 2026
Tinker PDM Aircraft Tour for KC-135 CCR.pdf
204.38 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Responses.pdf
357.27 KB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This opportunity is for the KC-135 Center Console Refresh (CCR) Revision 2 program, managed by the Air Force at Tinker Air Force Base. The government has released a Draft RFP, along with draft SOW, SRD, and pricing workbooks, and has conducted industry engagement including an Industry Day and aircraft tour. The full RFP release is currently expected in May 2026. Performance of services will be at Tinker Air Force Base. No specific budget amount has been provided.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Catina Baker
Not Given

Links (0)

Attachments (129)

Document
Size
Access
Updated
KC-135 CCR Questions for Industry Day 2026.03.16.pdf
653.23 KB
Controlled
May 28, 2026
Draft Solicitation - FA810526RB001 21 May 26.pdf
22.86 MB
Public
May 26, 2026
Attachment 2. (CUI) KC-135 CCR SRD.pdf
1.22 MB
Controlled
May 26, 2026
5. Attachment 5. KC-135 CCR DRAFT Section M - Evaluation Factors for Award.pdf
773.78 KB
Public
May 21, 2026
4. Attachment 4. KC-135 CCR DRAFT Section L - Instructions to Offerors (1).pdf
1.24 MB
Public
May 21, 2026
3. ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB UPDATED (P) - Draft.xlsx
407.39 KB
Public
May 21, 2026
3. ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME - UPDATED (P) - Draft.xlsx
468.92 KB
Public
May 21, 2026
1. (CUI) KC-135 CCR Revision 2 DRAFT Statement of Work (SOW).pdf
1.45 MB
Controlled
May 21, 2026
(CUI) DRAFT RFP Round Two.pdf
214.66 KB
Controlled
May 21, 2026
B45 ELA 818-3812-001_Rev_A (2).pdf
225.68 KB
Controlled
May 11, 2026
CUI KC-135 CCR Industry Day Responses-3.pdf
400.75 KB
Controlled
May 7, 2026
TO 00-5-16.pdf
2.72 MB
Controlled
May 5, 2026
In Person Industry Day Measurements KC-135 CCR Memo 05May2026.pdf
255.07 KB
Controlled
May 5, 2026
In Person Industry Day Pictures KC-135 CCR Memo 22Mar26 No Sign.pdf
222.91 KB
Controlled
Apr 28, 2026
(U) AFRL MBSE Style Guide v2-1.zip
13.93 MB
Controlled
Apr 23, 2026
(U) AFRL MBSE Style Guide v2-1.docx
14.33 MB
Controlled
Apr 23, 2026
(CUI) FA8105 CCR Rev2 Draft SOW RFI Response-3.pdf
486.39 KB
Controlled
Apr 15, 2026
(CUI) FA8105 CCR Rev2 Draft SRD RFI Response-3.pdf
319.42 KB
Controlled
Apr 15, 2026
CUI KC-135 CCR Industry Day Responses-2.pdf
585.31 KB
Controlled
Apr 15, 2026
Tinker PDM Aircraft Tour for KC-135 CCR.pdf
204.38 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Responses.pdf
357.27 KB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This opportunity is for the KC-135 Center Console Refresh (CCR) Revision 2 program, with performance expected at Tinker Air Force Base. The Draft RFP was released in February 2026, and the full RFP release is currently expected in May 2026. An Industry Day and aircraft tour were held in March 2026 at Tinker AFB. The government has released draft Statements of Work, System Requirements Documents, and pricing workbooks, and has provided responses to industry questions. No specific budget amount is mentioned in the description.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Catina Baker
Not Given

Links (0)

Attachments (128)

Document
Size
Access
Updated
Draft Solicitation - FA810526RB001 21 May 26.pdf
22.86 MB
Public
May 26, 2026
Attachment 2. (CUI) KC-135 CCR SRD.pdf
1.22 MB
Controlled
May 26, 2026
5. Attachment 5. KC-135 CCR DRAFT Section M - Evaluation Factors for Award.pdf
773.78 KB
Public
May 21, 2026
4. Attachment 4. KC-135 CCR DRAFT Section L - Instructions to Offerors (1).pdf
1.24 MB
Public
May 21, 2026
3. ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB UPDATED (P) - Draft.xlsx
407.39 KB
Public
May 21, 2026
3. ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME - UPDATED (P) - Draft.xlsx
468.92 KB
Public
May 21, 2026
1. (CUI) KC-135 CCR Revision 2 DRAFT Statement of Work (SOW).pdf
1.45 MB
Controlled
May 21, 2026
(CUI) DRAFT RFP Round Two.pdf
214.66 KB
Controlled
May 21, 2026
B45 ELA 818-3812-001_Rev_A (2).pdf
225.68 KB
Controlled
May 11, 2026
CUI KC-135 CCR Industry Day Responses-3.pdf
400.75 KB
Controlled
May 7, 2026
TO 00-5-16.pdf
2.72 MB
Controlled
May 5, 2026
In Person Industry Day Measurements KC-135 CCR Memo 05May2026.pdf
255.07 KB
Controlled
May 5, 2026
In Person Industry Day Pictures KC-135 CCR Memo 22Mar26 No Sign.pdf
222.91 KB
Controlled
Apr 28, 2026
(U) AFRL MBSE Style Guide v2-1.zip
13.93 MB
Controlled
Apr 23, 2026
(U) AFRL MBSE Style Guide v2-1.docx
14.33 MB
Controlled
Apr 23, 2026
(CUI) FA8105 CCR Rev2 Draft SOW RFI Response-3.pdf
486.39 KB
Controlled
Apr 15, 2026
(CUI) FA8105 CCR Rev2 Draft SRD RFI Response-3.pdf
319.42 KB
Controlled
Apr 15, 2026
CUI KC-135 CCR Industry Day Responses-2.pdf
585.31 KB
Controlled
Apr 15, 2026
Tinker PDM Aircraft Tour for KC-135 CCR.pdf
204.38 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Responses.pdf
357.27 KB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This opportunity is for the KC-135 Center Console Refresh (CCR) Revision 2 program, with performance expected at Tinker Air Force Base. The Draft RFP was released in February 2026, and the full RFP release is currently expected in May 2026. An Industry Day and aircraft tour were held in March and April 2026 to provide further details. The government has released draft Statements of Work, System Requirements Documents, and pricing workbooks for review. No specific budget amount is mentioned in the description.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Catina Baker
Not Given

Links (0)

Attachments (121)

Document
Size
Access
Updated
(CUI) DRAFT RFP Round Two.pdf
214.66 KB
Controlled
May 21, 2026
B45 ELA 818-3812-001_Rev_A (2).pdf
225.68 KB
Controlled
May 11, 2026
CUI KC-135 CCR Industry Day Responses-3.pdf
400.75 KB
Controlled
May 7, 2026
TO 00-5-16.pdf
2.72 MB
Controlled
May 5, 2026
In Person Industry Day Measurements KC-135 CCR Memo 05May2026.pdf
255.07 KB
Controlled
May 5, 2026
In Person Industry Day Pictures KC-135 CCR Memo 22Mar26 No Sign.pdf
222.91 KB
Controlled
Apr 28, 2026
(U) AFRL MBSE Style Guide v2-1.zip
13.93 MB
Controlled
Apr 23, 2026
(U) AFRL MBSE Style Guide v2-1.docx
14.33 MB
Controlled
Apr 23, 2026
(CUI) FA8105 CCR Rev2 Draft SOW RFI Response-3.pdf
486.39 KB
Controlled
Apr 15, 2026
(CUI) FA8105 CCR Rev2 Draft SRD RFI Response-3.pdf
319.42 KB
Controlled
Apr 15, 2026
CUI KC-135 CCR Industry Day Responses-2.pdf
585.31 KB
Controlled
Apr 15, 2026
Tinker PDM Aircraft Tour for KC-135 CCR.pdf
204.38 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Responses.pdf
357.27 KB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This opportunity is for the KC-135 Center Console Refresh (CCR) Revision 2 program, with performance expected at Tinker Air Force Base. The Draft RFP was released in February 2026, and the full RFP release is currently expected in May 2026. An Industry Day and aircraft tour were held in March and April 2026 to provide further details. The government has released draft Statements of Work, System Requirements Documents, and pricing workbooks for review. No specific budget amount has been provided in this description.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Catina Baker
Not Given

Links (0)

Attachments (128)

Document
Size
Access
Updated
Draft Solicitation - FA810526RB001 21 May 26 (1).pdf
39.98 MB
Public
May 21, 2026
5. Attachment 5. KC-135 CCR DRAFT Section M - Evaluation Factors for Award.pdf
773.78 KB
Public
May 21, 2026
4. Attachment 4. KC-135 CCR DRAFT Section L - Instructions to Offerors (1).pdf
1.24 MB
Public
May 21, 2026
3. ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB UPDATED (P) - Draft.xlsx
407.39 KB
Public
May 21, 2026
3. ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME - UPDATED (P) - Draft.xlsx
468.92 KB
Public
May 21, 2026
2. Attachment 2. (CUI) KC-135 CCR DRAFT SRD.pdf
1.54 MB
Controlled
May 21, 2026
1. (CUI) KC-135 CCR Revision 2 DRAFT Statement of Work (SOW).pdf
1.45 MB
Controlled
May 21, 2026
(CUI) DRAFT RFP Round Two.pdf
214.66 KB
Controlled
May 21, 2026
B45 ELA 818-3812-001_Rev_A (2).pdf
225.68 KB
Controlled
May 11, 2026
CUI KC-135 CCR Industry Day Responses-3.pdf
400.75 KB
Controlled
May 7, 2026
TO 00-5-16.pdf
2.72 MB
Controlled
May 5, 2026
In Person Industry Day Measurements KC-135 CCR Memo 05May2026.pdf
255.07 KB
Controlled
May 5, 2026
In Person Industry Day Pictures KC-135 CCR Memo 22Mar26 No Sign.pdf
222.91 KB
Controlled
Apr 28, 2026
(U) AFRL MBSE Style Guide v2-1.zip
13.93 MB
Controlled
Apr 23, 2026
(U) AFRL MBSE Style Guide v2-1.docx
14.33 MB
Controlled
Apr 23, 2026
(CUI) FA8105 CCR Rev2 Draft SOW RFI Response-3.pdf
486.39 KB
Controlled
Apr 15, 2026
(CUI) FA8105 CCR Rev2 Draft SRD RFI Response-3.pdf
319.42 KB
Controlled
Apr 15, 2026
CUI KC-135 CCR Industry Day Responses-2.pdf
585.31 KB
Controlled
Apr 15, 2026
Tinker PDM Aircraft Tour for KC-135 CCR.pdf
204.38 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Responses.pdf
357.27 KB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Inactive
Notice ID:FA8105_CCR_Rev2

The U.S. Air Force seeks turn-key solutions to replace and improve the KC-135’s Fuel System, Flight Display System, and Flight Computer, including the addition of autothrottle systems, to address obsolescence and enable future growth. The anticipated contract is a single award, indefinite delivery/quantity type with a Cost-Plus Incentive Fee for EMD and Firm Fixed Price for Production and Deployment. The performance period is projected from August 2027 to August 2037, comprising a 48-month base period and six 1-year option periods. Performance location is not specified. No budget amount is provided.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Catina Baker
Not Given

Links (0)

Attachments (0)


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

The U.S. Air Force seeks innovative, turn-key solutions to replace and improve the KC-135’s Fuel System, Flight Display System, and Flight Computer, including the addition of autothrottle systems, to address obsolescence and enable future growth. The anticipated contract is a single award, indefinite delivery/quantity type with a Cost-Plus Incentive Fee for EMD and Firm Fixed Price for Production and Deployment. The performance period is projected from August 2027 to August 2037, comprising a 48-month base period and six 1-year option periods. Performance location is not specified. No budget amount is provided.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Catina Baker
Not Given

Links (0)

Attachments (0)


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This opportunity is for the KC-135 Center Console Refresh (CCR) Revision 2 program. The draft RFP was released in February 2026, with a full RFP release expected in May 2026. An aircraft tour and Industry Day events were held at Tinker Air Force Base in Oklahoma. The government has released draft Statements of Work, System Requirements Documents, and pricing workbooks for review. No specific budget amount is mentioned in the description.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Catina Baker
Not Given

Links (0)

Attachments (120)

Document
Size
Access
Updated
B45 ELA 818-3812-001_Rev_A (2).pdf
225.68 KB
Controlled
May 11, 2026
CUI KC-135 CCR Industry Day Responses-3.pdf
400.75 KB
Controlled
May 7, 2026
TO 00-5-16.pdf
2.72 MB
Controlled
May 5, 2026
In Person Industry Day Measurements KC-135 CCR Memo 05May2026.pdf
255.07 KB
Controlled
May 5, 2026
In Person Industry Day Pictures KC-135 CCR Memo 22Mar26 No Sign.pdf
222.91 KB
Controlled
Apr 28, 2026
(U) AFRL MBSE Style Guide v2-1.zip
13.93 MB
Controlled
Apr 23, 2026
(U) AFRL MBSE Style Guide v2-1.docx
14.33 MB
Controlled
Apr 23, 2026
(CUI) FA8105 CCR Rev2 Draft SOW RFI Response-3.pdf
486.39 KB
Controlled
Apr 15, 2026
(CUI) FA8105 CCR Rev2 Draft SRD RFI Response-3.pdf
319.42 KB
Controlled
Apr 15, 2026
CUI KC-135 CCR Industry Day Responses-2.pdf
585.31 KB
Controlled
Apr 15, 2026
Tinker PDM Aircraft Tour for KC-135 CCR.pdf
204.38 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Responses.pdf
357.27 KB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This opportunity is for the KC-135 Center Console Refresh (CCR) Revision 2 program, with performance expected at Tinker Air Force Base. The draft RFP was released in February 2026, and the full RFP release is currently expected in May 2026. The government has conducted multiple industry engagements, including virtual industry days and an aircraft tour at Tinker AFB. No specific budget amount has been provided in the description. The program involves refreshing the center console of the KC-135 aircraft, with draft statements of work and system requirements documents already released for industry review.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Catina Baker
Not Given

Links (0)

Attachments (119)

Document
Size
Access
Updated
CUI KC-135 CCR Industry Day Responses-3.pdf
400.75 KB
Controlled
May 7, 2026
TO 00-5-16.pdf
2.72 MB
Controlled
May 5, 2026
In Person Industry Day Measurements KC-135 CCR Memo 05May2026.pdf
255.07 KB
Controlled
May 5, 2026
In Person Industry Day Pictures KC-135 CCR Memo 22Mar26 No Sign.pdf
222.91 KB
Controlled
Apr 28, 2026
(U) AFRL MBSE Style Guide v2-1.zip
13.93 MB
Controlled
Apr 23, 2026
(U) AFRL MBSE Style Guide v2-1.docx
14.33 MB
Controlled
Apr 23, 2026
(CUI) FA8105 CCR Rev2 Draft SOW RFI Response-3.pdf
486.39 KB
Controlled
Apr 15, 2026
(CUI) FA8105 CCR Rev2 Draft SRD RFI Response-3.pdf
319.42 KB
Controlled
Apr 15, 2026
CUI KC-135 CCR Industry Day Responses-2.pdf
585.31 KB
Controlled
Apr 15, 2026
Tinker PDM Aircraft Tour for KC-135 CCR.pdf
204.38 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Responses.pdf
357.27 KB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This opportunity is for the KC-135 Center Console Refresh (CCR) Revision 2 program, with performance expected at Tinker Air Force Base. The draft RFP was released in February 2026, and the full RFP release is currently expected in May 2026. An Industry Day and aircraft tour were held in March and April 2026 at Tinker AFB. No specific budget amounts are mentioned in the description. The government has released draft Statements of Work, System Requirements Documents, and pricing workbooks to support industry preparation.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (120)

Document
Size
Access
Updated
(CUI) KC-135 CCR Baseline Configuration.pdf
590.08 KB
Controlled
May 6, 2026
TO 00-5-16.pdf
2.72 MB
Controlled
May 5, 2026
(CUI) KC-135 CCR Baseline Configuration.pptx (deleted)
647.5 KB
Controlled
May 5, 2026
In Person Industry Day Measurements KC-135 CCR Memo 05May2026.pdf
255.07 KB
Controlled
May 5, 2026
In Person Industry Day Pictures KC-135 CCR Memo 22Mar26 No Sign.pdf
222.91 KB
Controlled
Apr 28, 2026
(U) AFRL MBSE Style Guide v2-1.zip
13.93 MB
Controlled
Apr 23, 2026
(U) AFRL MBSE Style Guide v2-1.docx
14.33 MB
Controlled
Apr 23, 2026
(CUI) FA8105 CCR Rev2 Draft SOW RFI Response-3.pdf
486.39 KB
Controlled
Apr 15, 2026
(CUI) FA8105 CCR Rev2 Draft SRD RFI Response-3.pdf
319.42 KB
Controlled
Apr 15, 2026
CUI KC-135 CCR Industry Day Responses-2.pdf
585.31 KB
Controlled
Apr 15, 2026
Tinker PDM Aircraft Tour for KC-135 CCR.pdf
204.38 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Responses.pdf
357.27 KB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This opportunity is for the KC-135 Center Console Refresh (CCR) Revision 2 program, with performance expected at Tinker Air Force Base. The draft RFP was released in February 2026, with the full RFP release currently expected in May 2026. The government has conducted multiple industry engagements, including virtual industry days and an aircraft tour at Tinker AFB. No specific budget amount has been provided in the description. The program involves a refresh of the KC-135 center console, with draft statements of work and system requirements documents available for review.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Catina Baker
Not Given

Links (0)

Attachments (120)

Document
Size
Access
Updated
CUI KC-135 CCR Industry Day Responses-3.pdf
411.32 KB
Controlled
May 6, 2026
(CUI) KC-135 CCR Baseline Configuration.pdf
590.08 KB
Controlled
May 6, 2026
TO 00-5-16.pdf
2.72 MB
Controlled
May 5, 2026
In Person Industry Day Measurements KC-135 CCR Memo 05May2026.pdf
255.07 KB
Controlled
May 5, 2026
In Person Industry Day Pictures KC-135 CCR Memo 22Mar26 No Sign.pdf
222.91 KB
Controlled
Apr 28, 2026
(U) AFRL MBSE Style Guide v2-1.zip
13.93 MB
Controlled
Apr 23, 2026
(U) AFRL MBSE Style Guide v2-1.docx
14.33 MB
Controlled
Apr 23, 2026
(CUI) FA8105 CCR Rev2 Draft SOW RFI Response-3.pdf
486.39 KB
Controlled
Apr 15, 2026
(CUI) FA8105 CCR Rev2 Draft SRD RFI Response-3.pdf
319.42 KB
Controlled
Apr 15, 2026
CUI KC-135 CCR Industry Day Responses-2.pdf
585.31 KB
Controlled
Apr 15, 2026
Tinker PDM Aircraft Tour for KC-135 CCR.pdf
204.38 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Responses.pdf
357.27 KB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This opportunity is for the KC-135 Center Console Refresh (CCR) Revision 2 program, with performance expected at Tinker Air Force Base. The draft solicitation and supporting documents have been released, with the full RFP release currently expected in May 2026. The government has conducted multiple industry engagements, including virtual industry days and an aircraft tour at Tinker AFB. No specific budget amount has been provided in the description.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Catina Baker
Not Given

Links (0)

Attachments (119)

Document
Size
Access
Updated
CUI KC-135 CCR Industry Day Responses-3.pdf
399.73 KB
Controlled
May 6, 2026
TO 00-5-16.pdf
2.72 MB
Controlled
May 5, 2026
In Person Industry Day Measurements KC-135 CCR Memo 05May2026.pdf
255.07 KB
Controlled
May 5, 2026
In Person Industry Day Pictures KC-135 CCR Memo 22Mar26 No Sign.pdf
222.91 KB
Controlled
Apr 28, 2026
(U) AFRL MBSE Style Guide v2-1.zip
13.93 MB
Controlled
Apr 23, 2026
(U) AFRL MBSE Style Guide v2-1.docx
14.33 MB
Controlled
Apr 23, 2026
(CUI) FA8105 CCR Rev2 Draft SOW RFI Response-3.pdf
486.39 KB
Controlled
Apr 15, 2026
(CUI) FA8105 CCR Rev2 Draft SRD RFI Response-3.pdf
319.42 KB
Controlled
Apr 15, 2026
CUI KC-135 CCR Industry Day Responses-2.pdf
585.31 KB
Controlled
Apr 15, 2026
Tinker PDM Aircraft Tour for KC-135 CCR.pdf
204.38 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Responses.pdf
357.27 KB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

The KC-135 Center Console Refresh (CCR) Revision 2 program is a government opportunity to modernize the aircraft's center console. Performance of services will be at Tinker Air Force Base (TAFB). The draft RFP was released in February 2026, with a full RFP release expected in May 2026. An Industry Day and aircraft tour were held in March and April 2026. No specific budget amounts were mentioned in the description.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (117)

Document
Size
Access
Updated
In Person Industry Day Measurements KC-135 CCR Memo 05May2026.pdf
255.07 KB
Controlled
May 5, 2026
In Person Industry Day Pictures KC-135 CCR Memo 22Mar26 No Sign.pdf
222.91 KB
Controlled
Apr 28, 2026
(U) AFRL MBSE Style Guide v2-1.zip
13.93 MB
Controlled
Apr 23, 2026
(U) AFRL MBSE Style Guide v2-1.docx
14.33 MB
Controlled
Apr 23, 2026
(CUI) FA8105 CCR Rev2 Draft SOW RFI Response-3.pdf
486.39 KB
Controlled
Apr 15, 2026
(CUI) FA8105 CCR Rev2 Draft SRD RFI Response-3.pdf
319.42 KB
Controlled
Apr 15, 2026
CUI KC-135 CCR Industry Day Responses-2.pdf
585.31 KB
Controlled
Apr 15, 2026
Tinker PDM Aircraft Tour for KC-135 CCR.pdf
204.38 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Responses.pdf
357.27 KB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

The KC-135 Center Console Refresh (CCR) Revision 2 program is a government opportunity to update the aircraft's center console. The draft solicitation indicates a proposal response due date of 31 July 2026, with the full RFP release currently expected in May 2026. An Industry Day and aircraft tour were held at Tinker Air Force Base (TAFB) in Oklahoma. The government has released draft documents including a Statement of Work (SOW), System Requirements Document (SRD), and pricing workbooks for review. This opportunity involves performance at Tinker AFB and requires interested parties to have an active DD2345 on file for access to controlled documents.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (119)

Document
Size
Access
Updated
TO 00-5-16.pdf
2.72 MB
Controlled
May 5, 2026
(CUI) KC-135 CCR Baseline Configuration.pptx
647.5 KB
Controlled
May 5, 2026
In Person Industry Day Measurements KC-135 CCR Memo 05May2026.pdf
255.07 KB
Controlled
May 5, 2026
In Person Industry Day Pictures KC-135 CCR Memo 22Mar26 No Sign.pdf
222.91 KB
Controlled
Apr 28, 2026
(U) AFRL MBSE Style Guide v2-1.zip
13.93 MB
Controlled
Apr 23, 2026
(U) AFRL MBSE Style Guide v2-1.docx
14.33 MB
Controlled
Apr 23, 2026
(CUI) FA8105 CCR Rev2 Draft SOW RFI Response-3.pdf
486.39 KB
Controlled
Apr 15, 2026
(CUI) FA8105 CCR Rev2 Draft SRD RFI Response-3.pdf
319.42 KB
Controlled
Apr 15, 2026
CUI KC-135 CCR Industry Day Responses-2.pdf
585.31 KB
Controlled
Apr 15, 2026
Tinker PDM Aircraft Tour for KC-135 CCR.pdf
204.38 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Responses.pdf
357.27 KB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This opportunity is for the KC-135 Center Console Refresh (CCR) Revision 2 program, with performance expected at Tinker Air Force Base. The full Request for Proposal (RFP) release is currently expected in May 2026, with a proposal response due date of 31 July 2026. The government has released draft solicitation documents, including a Statement of Work (SOW), System Requirements Document (SRD), and pricing workbooks. An Industry Day and aircraft tour were held in March and April 2026 to engage potential bidders. No specific budget amount has been provided in the description.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (116)

Document
Size
Access
Updated
In Person Industry Day Pictures KC-135 CCR Memo 22Mar26 No Sign.pdf
222.91 KB
Controlled
Apr 28, 2026
(U) AFRL MBSE Style Guide v2-1.zip
13.93 MB
Controlled
Apr 23, 2026
(U) AFRL MBSE Style Guide v2-1.docx
14.33 MB
Controlled
Apr 23, 2026
(CUI) FA8105 CCR Rev2 Draft SOW RFI Response-3.pdf
486.39 KB
Controlled
Apr 15, 2026
(CUI) FA8105 CCR Rev2 Draft SRD RFI Response-3.pdf
319.42 KB
Controlled
Apr 15, 2026
CUI KC-135 CCR Industry Day Responses-2.pdf
585.31 KB
Controlled
Apr 15, 2026
Tinker PDM Aircraft Tour for KC-135 CCR.pdf
204.38 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Responses.pdf
357.27 KB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

The U.S. Air Force is pursuing the KC-135 Center Console Refresh (CCR) Revision 2 program, with performance expected at Tinker Air Force Base. A full Request for Proposals (RFP) release is currently expected in May 2026. The government has released draft solicitation documents, including a Statement of Work, System Requirements Document, and pricing workbooks, with a proposal response due date of 31 July 2026. An Industry Day and aircraft tour were held in March and April 2026 to provide additional information and answer industry questions. No specific budget amount has been disclosed in this description.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (116)

Document
Size
Access
Updated
(U) AFRL MBSE Style Guide v2-1.docx
14.33 MB
Controlled
Apr 23, 2026
(CUI) FA8105 CCR Rev2 Draft SOW RFI Response-3.pdf
486.39 KB
Controlled
Apr 15, 2026
(CUI) FA8105 CCR Rev2 Draft SRD RFI Response-3.pdf
319.42 KB
Controlled
Apr 15, 2026
CUI KC-135 CCR Industry Day Responses-2.pdf
585.31 KB
Controlled
Apr 15, 2026
Tinker PDM Aircraft Tour for KC-135 CCR.pdf
204.38 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Responses.pdf
357.27 KB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
OMG SysML Ver 1.7.pdf
13.45 MB
Controlled
Aug 13, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) AFRL-STO MBSE Style Guide v0.2.pdf
1.98 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This opportunity is for the KC-135 Center Console Refresh (CCR) Revision 2 program, managed by AFLCMC/WLT at Tinker Air Force Base. The government has released draft solicitation documents, including a Statement of Work, System Requirements Document, and pricing workbooks, with a full RFP release currently expected in May 2026. An Industry Day and aircraft tour were held in March 2026 at Tinker AFB, with associated Q&A documents and slides now available. Performance of services will be at Tinker Air Force Base, as indicated by the aircraft tour and contracting office location. No specific budget amounts have been provided in this description.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (116)

Document
Size
Access
Updated
(U) AFRL MBSE Style Guide v2-1.docx
14.33 MB
Controlled
Apr 23, 2026
(CUI) FA8105 CCR Rev2 Draft SOW RFI Response-3.pdf
486.39 KB
Controlled
Apr 15, 2026
(CUI) FA8105 CCR Rev2 Draft SRD RFI Response-3.pdf
319.42 KB
Controlled
Apr 15, 2026
CUI KC-135 CCR Industry Day Responses-2.pdf
585.31 KB
Controlled
Apr 15, 2026
Tinker PDM Aircraft Tour for KC-135 CCR.pdf
204.38 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Responses.pdf
357.27 KB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
OMG SysML Ver 1.7.pdf (deleted)
13.45 MB
Controlled
Aug 13, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) AFRL-STO MBSE Style Guide v0.2.pdf (deleted)
1.98 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This opportunity is for the KC-135 Center Console Refresh (CCR) Revision 2 program, managed by AFLCMC/WLT at Tinker Air Force Base. The government has released draft solicitation documents, including a Statement of Work, System Requirements Document, and pricing workbooks, with a full RFP release currently expected in May 2026. An Industry Day and aircraft tour were held in March 2026 at Tinker AFB, with associated Q&A documents and slides now available. Performance of services will be at Tinker Air Force Base, as indicated by the aircraft tour and contracting office location. No specific budget amounts have been provided in this description.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (115)

Document
Size
Access
Updated
(U) AFRL MBSE Style Guide v2-1.zip
13.93 MB
Controlled
Apr 23, 2026
(U) AFRL MBSE Style Guide v2-1.docx
14.33 MB
Controlled
Apr 23, 2026
(CUI) FA8105 CCR Rev2 Draft SOW RFI Response-3.pdf
486.39 KB
Controlled
Apr 15, 2026
(CUI) FA8105 CCR Rev2 Draft SRD RFI Response-3.pdf
319.42 KB
Controlled
Apr 15, 2026
CUI KC-135 CCR Industry Day Responses-2.pdf
585.31 KB
Controlled
Apr 15, 2026
Tinker PDM Aircraft Tour for KC-135 CCR.pdf
204.38 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Responses.pdf
357.27 KB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This opportunity is for the KC-135 Center Console Refresh (CCR) Revision 2 program. The Government has released a draft solicitation, draft Statement of Work (SOW), draft System Requirements Document (SRD), and pricing workbooks for industry review. An Industry Day and an Aircraft Tour at Tinker Air Force Base have been held as part of market research and engagement. The proposal response due date for the draft solicitation is 31 July 2026.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (115)

Document
Size
Access
Updated
(CUI) FA8105 CCR Rev2 Draft SOW RFI Response-3.pdf
486.39 KB
Controlled
Apr 15, 2026
(CUI) FA8105 CCR Rev2 Draft SRD RFI Response-3.pdf
319.42 KB
Controlled
Apr 15, 2026
CUI KC-135 CCR Industry Day Responses-2.pdf
585.31 KB
Controlled
Apr 15, 2026
Tinker PDM Aircraft Tour for KC-135 CCR.pdf
204.38 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Responses.pdf
357.27 KB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
OMG SysML Ver 1.7.pdf
13.45 MB
Controlled
Aug 13, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) AFRL-STO MBSE Style Guide v0.2.pdf
1.98 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This is a multi-phase KC-135 Center Console Refresh (CCR) Revision 2 program, with a draft solicitation and pricing workbooks currently posted. The proposal response due date is 31 July 2026. The work is associated with Tinker Air Force Base, and an aircraft tour for the program will be held there, concluding by 4:00 p.m. CST. The Government has conducted Industry Days and released numerous draft documents, including the Statement of Work and System Requirements Document, for industry review and feedback.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (112)

Document
Size
Access
Updated
Tinker PDM Aircraft Tour for KC-135 CCR.pdf
204.38 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Responses.pdf
357.27 KB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
OMG SysML Ver 1.7.pdf
13.45 MB
Controlled
Aug 13, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) AFRL-STO MBSE Style Guide v0.2.pdf
1.98 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This is for the KC-135 Center Console Refresh (CCR) Revision 2 program, with a draft solicitation currently posted and updated pricing workbooks available. The proposal response due date is 31 July 2026. The full RFP release is currently expected in May 2026. The program involves multiple Industry Days, including virtual and in-person sessions, with associated charts, minutes, and Q&A documents posted. The Contracting Officer is Ms. Brandi Shelden, and the work is associated with Tinker Air Force Base.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (94)

Document
Size
Access
Updated
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
OMG SysML Ver 1.7.pdf
13.45 MB
Controlled
Aug 13, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) AFRL-STO MBSE Style Guide v0.2.pdf
1.98 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This is for the KC-135 Center Console Refresh (CCR) Revision 2 program, with a draft solicitation currently posted and updated pricing workbooks available. The proposal response due date is 31 July 2026. A full RFP release is expected in May 2026. The program has held multiple Industry Days, including virtual and in-person sessions, with associated charts, minutes, and Q&A documents provided. The Contracting Officer is Ms. Brandi Shelden.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (110)

Document
Size
Access
Updated
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
OMG SysML Ver 1.7.pdf
13.45 MB
Controlled
Aug 13, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) AFRL-STO MBSE Style Guide v0.2.pdf
1.98 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This opportunity is for the KC-135 Center Console Refresh (CCR) Revision 2 program. The Government has released a series of draft documents for industry review, including the Statement of Work, System Requirements Document, pricing workbooks, and solicitation sections. An Industry Day was held, and one-on-one sessions were scheduled. The full RFP release is currently expected in May 2026. The proposal response due date has been updated to 31 July 2026.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (112)

Document
Size
Access
Updated
Tinker PDM Aircraft Tour for KC-135 CCR.pdf
204.38 KB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Responses.pdf
357.27 KB
Controlled
Apr 3, 2026
CUI_Industry Day 1 and 2 Q and A.pdf
174.3 KB
Controlled
Apr 3, 2026
(U) readme to use this style guide - external.txt
252 Bytes
Controlled
Apr 3, 2026
OMG SysML Ver 1.6.pdf
15.83 MB
Controlled
Apr 3, 2026
KC-135 TO 1C-135-WA-1-1898M.pdf
876.71 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2053.pdf
232.59 KB
Controlled
Apr 3, 2026
CUI - KC-135RT Environmental Specifications_v1.0_17 Feb 2026 signed.pdf
284.78 KB
Controlled
Apr 3, 2026
(U) template_for_exfil.docx
54.81 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1983.pdf
1.21 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1969C.pdf
1.13 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1988G.pdf
322.58 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2026.pdf
112.56 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-2000.pdf
144.05 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1964F.pdf
8.3 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1924R.pdf
1.79 MB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1931G.pdf
307.41 KB
Controlled
Apr 3, 2026
(CUI) KC-135 TO 1C-135-WA-1-1951.pdf
122.18 KB
Controlled
Apr 3, 2026
(CUI KC-135 TO 1C-135-1-1-3.pdf
66.2 MB
Controlled
Apr 3, 2026
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
OMG SysML Ver 1.7.pdf
13.45 MB
Controlled
Aug 13, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) AFRL-STO MBSE Style Guide v0.2.pdf
1.98 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Inactive
Notice ID:FA8105_CCR_Rev2

This opportunity is for the KC-135 Center Console Refresh (CCR) Revision 2 program. The Government has released a comprehensive set of draft documents, including the Statement of Work, System Requirements Document, solicitation sections, and pricing workbooks for both primes and subcontractors. A proposal response due date is set for 31 July 2026. The effort involves multiple Industry Day sessions, including one-on-one meetings, with the primary contracting activity being the AFLCMC/WLT branch at Tinker Air Force Base. Updated documents and answers to industry questions are being posted regularly as part of the ongoing market research and solicitation development process.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (93)

Document
Size
Access
Updated
CUI KC-135 CCR Industry Day Slides and Meeting Minutes.pdf
722.14 KB
Controlled
Mar 27, 2026
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
OMG SysML Ver 1.7.pdf
13.45 MB
Controlled
Aug 13, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) AFRL-STO MBSE Style Guide v0.2.pdf
1.98 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This opportunity is for the KC-135 Center Console Refresh (CCR) Revision 2 program. An Industry Day with one-on-one sessions is scheduled for March 2026. The draft solicitation has been updated, including pricing workbooks for primes and subcontractors, and the proposal response due date is 31 July 2026. Multiple draft documents, including the Statement of Work, System Requirements Document, and technical orders, have been posted for review. The full RFP is expected to be released in May 2026.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (92)

Document
Size
Access
Updated
(CUI) FA8105_CCR_Rev2 RFI Response 2.pdf
290.52 KB
Controlled
Mar 24, 2026
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
OMG SysML Ver 1.7.pdf
13.45 MB
Controlled
Aug 13, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) AFRL-STO MBSE Style Guide v0.2.pdf
1.98 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This opportunity is for the KC-135 Center Console Refresh (CCR) Revision 2 program. An Industry Day with one-on-one sessions is scheduled for March 2026. The draft solicitation has been updated, including pricing workbooks for primes and subcontractors, and the proposal response due date is 31 July 2026. Multiple draft documents, including the Statement of Work, System Requirements Document, and technical orders, have been posted for review. The full RFP is expected to be released in May 2026.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (91)

Document
Size
Access
Updated
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
OMG SysML Ver 1.7.pdf
13.45 MB
Controlled
Aug 13, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) AFRL-STO MBSE Style Guide v0.2.pdf
1.98 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This opportunity is for the KC-135 Center Console Refresh (CCR) Revision 2 program. A draft solicitation with updated pricing workbooks and proposal sections is available, and a full RFP release is expected in May 2026. The proposal response due date is 31 July 2026. The performance location is Tinker Air Force Base (TAFB). No budget information is specified.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (91)

Document
Size
Access
Updated
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
OMG SysML Ver 1.7.pdf
13.45 MB
Controlled
Aug 13, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) AFRL-STO MBSE Style Guide v0.2.pdf
1.98 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This is for the KC-135 Center Console Refresh (CCR) Revision 2 program, with a draft solicitation and pricing workbooks now available. The proposal response due date is 31 July 2026. The program involves a series of industry engagements, including an upcoming Industry Day in March 2026 with optional one-on-one sessions, and a full RFP release is expected in May 2026. The work is associated with Tinker Air Force Base. No budget information is specified.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (91)

Document
Size
Access
Updated
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Solicitation - FA810526RB001.pdf
5.81 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
ATTACHMENT 3B - EXCEL PRICING WORKBOOK - SUB.xlsx
472.81 KB
Public
Mar 16, 2026
ATTACHMENT 3A - EXCEL PRICING WORKBOOK - PRIME.xlsx
592.84 KB
Public
Mar 16, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
OMG SysML Ver 1.7.pdf
13.45 MB
Controlled
Aug 13, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) AFRL-STO MBSE Style Guide v0.2.pdf
1.98 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This is an update for the KC-135 Center Console Refresh (CCR) Revision 2 program, noting that draft pricing workbooks and an updated draft solicitation with revised Sections L and M are now available. The program schedule indicates a Draft RFP was released in February 2026, an Industry Day is planned for March 2026, and a full RFP release is expected in May 2026. The work is associated with Tinker Air Force Base. No specific budget amounts are detailed in this update.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (99)

Document
Size
Access
Updated
MEMO Draft Solicitation FA810526RB001.pdf
276.56 KB
Public
Mar 16, 2026
DRAFT Exhibit A CCR Revision 2 CDRL Package.pdf
17.63 MB
Public
Mar 16, 2026
KC-135 CCR Industry Day Flyer.pdf
815.56 KB
Public
Mar 16, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf
1.77 MB
Public
Mar 16, 2026
Attachment 9 - DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf
291.83 KB
Public
Mar 16, 2026
Attachment 6 - DRAFT CCR Revision 2 Data Rights Assertion Matrix.pdf
584.84 KB
Public
Mar 16, 2026
Attachment 7 -DRAFT CCR DD254 - Feb 2026.pdf
77.91 KB
Public
Mar 16, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors (1).pdf
1.71 MB
Public
Mar 16, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award (1).pdf
1.01 MB
Public
Mar 16, 2026
ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME.xlsx (deleted)
592.84 KB
Controlled
Mar 10, 2026
ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB.xlsx (deleted)
472.81 KB
Controlled
Mar 10, 2026
DRAFT Solicitation - FA810526RB001.pdf (deleted)
5.81 MB
Controlled
Mar 10, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors.pdf (deleted)
1.71 MB
Controlled
Mar 10, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award.pdf (deleted)
1.01 MB
Controlled
Mar 10, 2026
MEMO Draft Solicitation FA810526RB001.pdf (deleted)
276.56 KB
Controlled
Mar 4, 2026
KC-135 CCR Industry Day Flyer.pdf (deleted)
815.56 KB
Controlled
Mar 4, 2026
DRAFT Exhibit A (CUI) KC-135 CCR Revision 2 CDRL Package.pdf (deleted)
17.63 MB
Controlled
Mar 4, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf (deleted)
1.77 MB
Controlled
Mar 4, 2026
Attachment 9 -DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf (deleted)
291.83 KB
Controlled
Mar 4, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR).pdf (deleted)
560.33 KB
Controlled
Mar 4, 2026
Attachment 6 - CCR Revision 2 Data Rights Assertion Matrix.pdf (deleted)
585.33 KB
Controlled
Mar 4, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
OMG SysML Ver 1.7.pdf
13.45 MB
Controlled
Aug 13, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) AFRL-STO MBSE Style Guide v0.2.pdf
1.98 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This is an update for the KC-135 Center Console Refresh (CCR) Revision 2 program, announcing that draft pricing workbooks and an updated draft solicitation with revised proposal instructions and evaluation criteria are now available. The program schedule indicates a draft RFP was released at the end of February 2026, with an Industry Day planned for March 2026 and a full RFP release expected in May 2026. Numerous draft documents, including the Statement of Work, System Requirements Document, and technical orders, have been posted for industry review. The program has previously engaged with industry through multiple Requests for Information and a Virtual Industry Day. The work is managed by the C/KC-135 Contracting Branch at Tinker Air Force Base.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (92)

Document
Size
Access
Updated
ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME.xlsx (deleted)
592.84 KB
Controlled
Mar 10, 2026
ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB.xlsx (deleted)
472.81 KB
Controlled
Mar 10, 2026
ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME.xlsx (deleted)
630.5 KB
Controlled
Mar 10, 2026
ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB.xlsx (deleted)
505.5 KB
Controlled
Mar 10, 2026
DRAFT Solicitation - FA810526RB001.pdf (deleted)
5.81 MB
Controlled
Mar 10, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors.pdf (deleted)
1.71 MB
Controlled
Mar 10, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award.pdf (deleted)
1.01 MB
Controlled
Mar 10, 2026
MEMO Draft Solicitation FA810526RB001.pdf (deleted)
276.56 KB
Controlled
Mar 4, 2026
KC-135 CCR Industry Day Flyer.pdf (deleted)
815.56 KB
Controlled
Mar 4, 2026
DRAFT Exhibit A (CUI) KC-135 CCR Revision 2 CDRL Package.pdf (deleted)
17.63 MB
Controlled
Mar 4, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf (deleted)
1.77 MB
Controlled
Mar 4, 2026
Attachment 9 -DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf (deleted)
291.83 KB
Controlled
Mar 4, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR).pdf (deleted)
560.33 KB
Controlled
Mar 4, 2026
Attachment 6 - CCR Revision 2 Data Rights Assertion Matrix.pdf (deleted)
585.33 KB
Controlled
Mar 4, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
OMG SysML Ver 1.7.pdf
13.45 MB
Controlled
Aug 13, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) AFRL-STO MBSE Style Guide v0.2.pdf
1.98 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This is an update for the KC-135 Center Console Refresh (CCR) Revision 2 program, announcing that draft pricing workbooks and an updated draft solicitation with revised proposal instructions and evaluation criteria are now available. The program schedule indicates a draft RFP was released in February 2026, an Industry Day was planned for March 2026, and a full RFP release is expected in May 2026. The work is associated with Tinker Air Force Base. No budget information is specified in this update.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (93)

Document
Size
Access
Updated
ATTACHMENT 3A - DRAFT EXCEL PRICING WORKBOOK - PRIME.xlsx (deleted)
630.5 KB
Controlled
Mar 10, 2026
ATTACHMENT 3B - DRAFT EXCEL PRICING WORKBOOK - SUB.xlsx (deleted)
505.5 KB
Controlled
Mar 10, 2026
DRAFT Solicitation - FA810526RB001.pdf (deleted)
5.81 MB
Controlled
Mar 10, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors.pdf (deleted)
1.71 MB
Controlled
Mar 10, 2026
Attachment 5 - DRAFT CCR Section M - Evaluation Factors for Award.pdf (deleted)
1.01 MB
Controlled
Mar 10, 2026
MEMO Draft Solicitation FA810526RB001.pdf (deleted)
276.56 KB
Controlled
Mar 4, 2026
Draft Solicitation FA810526RB001.pdf (deleted)
1.14 MB
Controlled
Mar 4, 2026
KC-135 CCR Industry Day Flyer.pdf (deleted)
815.56 KB
Controlled
Mar 4, 2026
DRAFT Exhibit A (CUI) KC-135 CCR Revision 2 CDRL Package.pdf (deleted)
17.63 MB
Controlled
Mar 4, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf (deleted)
1.77 MB
Controlled
Mar 4, 2026
Attachment 9 -DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf (deleted)
291.83 KB
Controlled
Mar 4, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR).pdf (deleted)
560.33 KB
Controlled
Mar 4, 2026
Attachment 6 - CCR Revision 2 Data Rights Assertion Matrix.pdf (deleted)
585.33 KB
Controlled
Mar 4, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors.pdf (deleted)
1.56 MB
Public
Feb 27, 2026
Attachment 5 - DRAFT CCR Revision 2 Section M - Evaluation Factors for Award as of 25 Feb.pdf (deleted)
1.02 MB
Public
Feb 27, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
OMG SysML Ver 1.7.pdf
13.45 MB
Controlled
Aug 13, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) AFRL-STO MBSE Style Guide v0.2.pdf
1.98 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This is a draft solicitation for the KC-135 Center Console Refresh (CCR) Revision 2 program, with numerous draft documents including the Statement of Work, System Requirements Document, and proposal instructions posted for industry review. The program schedule indicates a Draft RFP release at the end of February 2026, an Industry Day in March 2026, and a full RFP release expected in May 2026. The work is managed by the C/KC-135 Contracting Branch at Tinker Air Force Base (TAFB). No budget information is specified in this description.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (88)

Document
Size
Access
Updated
MEMO Draft Solicitation FA810526RB001.pdf (deleted)
276.56 KB
Controlled
Mar 4, 2026
Draft Solicitation FA810526RB001.pdf (deleted)
1.14 MB
Controlled
Mar 4, 2026
KC-135 CCR Industry Day Flyer.pdf (deleted)
815.56 KB
Controlled
Mar 4, 2026
DRAFT Exhibit A (CUI) KC-135 CCR Revision 2 CDRL Package.pdf (deleted)
17.63 MB
Controlled
Mar 4, 2026
DRAFT SOW Appendix D DD2794_KC-135 CCR.pdf (deleted)
1.77 MB
Controlled
Mar 4, 2026
Attachment 9 -DCAA Preaward Survey of Prospective Contractor Accounting System Checklist.pdf (deleted)
291.83 KB
Controlled
Mar 4, 2026
Attachment 8 - DRAFT TM-86-01R Air Force Technical Manual Contract Requirements (TMCR).pdf (deleted)
560.33 KB
Controlled
Mar 4, 2026
Attachment 6 - CCR Revision 2 Data Rights Assertion Matrix.pdf (deleted)
585.33 KB
Controlled
Mar 4, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors.pdf (deleted)
1.56 MB
Public
Feb 27, 2026
Attachment 5 - DRAFT CCR Revision 2 Section M - Evaluation Factors for Award as of 25 Feb.pdf (deleted)
1.02 MB
Public
Feb 27, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
OMG SysML Ver 1.7.pdf
13.45 MB
Controlled
Aug 13, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) AFRL-STO MBSE Style Guide v0.2.pdf
1.98 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This is a draft solicitation for the KC-135 Center Console Refresh (CCR) Revision 2 program, with key documents like the Statement of Work and System Requirements Document posted for industry review. The program schedule indicates a Draft RFP release at the end of February 2026, an Industry Day in March 2026, and a full RFP release expected in May 2026. The work is managed by the C/KC-135 Contracting Branch at Tinker Air Force Base (TAFB). The government has been actively engaging with industry through multiple Requests for Information and a prior Virtual Industry Day. No budget information is specified in this description.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (82)

Document
Size
Access
Updated
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf
1.11 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf
1 MB
Controlled
Mar 3, 2026
Attachment 1 - DRAFT (CUI) CCR Revision 2 Statement of Work (SOW).pdf (deleted)
2.04 MB
Controlled
Mar 3, 2026
Attachment 2 - DRAFT (CUI) KC-135 CCR Revision 2 SRD.pdf (deleted)
1.67 MB
Controlled
Mar 3, 2026
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors.pdf (deleted)
1.56 MB
Public
Feb 27, 2026
Attachment 5 - DRAFT CCR Revision 2 Section M - Evaluation Factors for Award as of 25 Feb.pdf (deleted)
1.02 MB
Public
Feb 27, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
OMG SysML Ver 1.7.pdf
13.45 MB
Controlled
Aug 13, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) AFRL-STO MBSE Style Guide v0.2.pdf
1.98 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This is a draft and pre-solicitation process for the KC-135 Center Console Refresh (CCR) Revision 2 program. The government plans to release a Draft RFP by the end of February 2026, followed by an Industry Day in March 2026, with the full RFP expected in May 2026. The work is managed by the C/KC-135 Contracting Branch at Tinker Air Force Base (TAFB). Numerous draft documents, including the System Requirements Document, Statement of Work, and technical orders, have been released for industry review and feedback. The government has also issued several Requests for Information (RFIs) seeking industry input on topics like contract type and incentives.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (80)

Document
Size
Access
Updated
Attachment 4 - DRAFT CCR Section L - Instructions to Offerors.pdf (deleted)
1.56 MB
Public
Feb 27, 2026
Attachment 5 - DRAFT CCR Revision 2 Section M - Evaluation Factors for Award as of 25 Feb.pdf (deleted)
1.02 MB
Public
Feb 27, 2026
Attachment 4 - (CUI) CCR Section L - Instructions to Offerors.pdf (deleted)
1.56 MB
Public
Feb 27, 2026
Attachment 5 - CUI CCR Revision 2 Section M - Evaluation Factors for Award as of 25 Feb.pdf (deleted)
1.02 MB
Public
Feb 27, 2026
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
OMG SysML Ver 1.7.pdf
13.45 MB
Controlled
Aug 13, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) AFRL-STO MBSE Style Guide v0.2.pdf
1.98 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This opportunity is for the KC-135 Center Console Refresh (CCR) Revision 2 program. The government has provided a schedule indicating a Draft RFP is planned for the end of February 2026, an Industry Day in March 2026, and a full RFP release is expected in May 2026. The work is associated with Tinker Air Force Base (TAFB). Numerous draft documents, including a Statement of Work and System Requirements Document, have been released for industry review, and the government has been actively seeking input through multiple Requests for Information (RFIs).

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (76)

Document
Size
Access
Updated
KC-135 CCR Revision TO 1C-135-8-1 (January 22- 2024).PDF
9.03 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO List (Jan 22- 2024).pdf
54.16 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6WC-5 (January 22- 2024).PDF
239.84 KB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-6CL-3 (January 22- 2024).PDF
1.1 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-2 (January 22- 2024).PDF
65.79 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-3-1 (January 22- 2024).PDF
53 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-7 (January 22- 2024).PDF
47.67 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-6 (January 22- 2024).PDF
19.26 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-4 (January 22- 2024).PDF
39.46 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-11-40-1 (January 22- 2024).PDF
95.83 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10.pdf
43.29 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-10 (January 22- 2024).PDF
42.85 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135-2-2-2 (January 22- 2024).PDF
74.71 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R-1-1.pdf
65.62 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)(I)-1 (January 22- 2024).PDF
88.23 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1C-135(K)R(II)-1 (January 22- 2024).PDF
29.69 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1A-14 (1) (January 22- 2024).PDF
66.58 MB
Controlled
Feb 18, 2026
KC-135 CCR Revision TO 1-1-300.pdf
127.84 KB
Controlled
Feb 18, 2026
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
OMG SysML Ver 1.7.pdf
13.45 MB
Controlled
Aug 13, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) AFRL-STO MBSE Style Guide v0.2.pdf
1.98 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This opportunity is for the KC-135 Center Console Refresh (CCR) Revision 2 program. A Draft RFP is planned for release at the end of February 2026, with an Industry Day in March 2026 and the full RFP expected in May 2026. The work is managed by the C/KC-135 Contracting Branch at Tinker Air Force Base (TAFB). The Government has been actively engaging with industry through multiple Requests for Information (RFIs) and a prior Virtual Industry Day.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (58)

Document
Size
Access
Updated
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
OMG SysML Ver 1.7.pdf
13.45 MB
Controlled
Aug 13, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) AFRL-STO MBSE Style Guide v0.2.pdf
1.98 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This is a Request for Information (RFI) for market research on the KC-135 Center Console Refresh (CCR) Revision 2 program, issued by the C/KC-135 Contracting Branch at Tinker Air Force Base. The government is seeking industry input on contract types, incentives, and standard compliance. A Virtual Industry Day was held on April 2, 2025, and draft documents including a System Requirements Document and Statement of Work have been released for review. Access to controlled documents requires an active DD2345 on file via the JCP website. No budget information is specified.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (58)

Document
Size
Access
Updated
(CUI) KC-135 SCG Final Oct 2022.pdf
767.61 KB
Controlled
Feb 5, 2026
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
OMG SysML Ver 1.7.pdf
13.45 MB
Controlled
Aug 13, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) AFRL-STO MBSE Style Guide v0.2.pdf
1.98 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »

KC-135 Center Console Refresh (CCR) Revision 2

Notice ID:FA8105_CCR_Rev2

This is a Request for Information (RFI) and market research process for the KC-135 Center Console Refresh (CCR) Revision 2 program, managed from Tinker Air Force Base. The government has released draft documents including a System Requirements Document and Statement of Work, held a virtual industry day, and is seeking industry input on contract types, incentives, and compliance. The process involves accessing controlled documents through sam.gov with an active DD2345. No specific budget or performance location is detailed in this description.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE AIR FORCE FA8105 AFLCMC WKK
  PSC   1680 MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
LOCATION: Not Given
Primary Contact
Brandi Shelden
Not Given
Alt Contact
Alejandra Marchesano
Not Given

Links (0)

Attachments (57)

Document
Size
Access
Updated
(CUI) Response Industry Questions KC-135 CCR Memo 13Jan26.pdf
292.24 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SRD Response 1.pdf
284.89 KB
Controlled
Jan 13, 2026
(CUI) FA8105 CCR Rev2 RFIs SOW Response 1.pdf
200.08 KB
Controlled
Jan 13, 2026
(CUI) CCR Industry Day.pdf
603.68 KB
Controlled
Dec 17, 2025
(CUI) Industry Day 2Apr25 KC-135 CCR Memo 17Dec25.pdf
206.05 KB
Controlled
Dec 17, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 3.pdf
140.59 KB
Controlled
Dec 5, 2025
CUI Draft SOW KC-135 CCR Rev 2.pdf
1.45 MB
Controlled
Nov 21, 2025
(CUI) Draft SOW KC-135 CCR Memo 21Nov25.pdf
204.17 KB
Controlled
Nov 21, 2025
(CUI) Update KC-135 CCR 19 Nov 25.pdf
207.93 KB
Controlled
Nov 19, 2025
(CUI) DRAFT KC-135 CCR Revision 2 SRD.pdf
1.39 MB
Controlled
Nov 14, 2025
(CUI) Draft SRD KC-135 CCR Memo Signed 14Nov25.pdf
204.8 KB
Controlled
Nov 14, 2025
(CUI) Update KC-135 CCR 28 Aug 25.pdf
187.03 KB
Controlled
Aug 28, 2025
OMG SysML Ver 1.7.pdf
13.45 MB
Controlled
Aug 13, 2025
(CUI) KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-3.PDF (January 22, 2024).PDF
1.48 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40.PDF (January 22, 2024).PDF
6.38 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-2.PDF (January 22, 2024).PDF
14.86 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-2-11-40-5.PDF (January 22, 2024).PDF
9.76 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-3-10.PDF (January 22, 2024).PDF
3.51 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-5-1.PDF (January 22, 2024).PDF
10.65 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-06.PDF (January 22, 2024).PDF
5.59 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6.PDF (January 22, 2024).PDF
297.46 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CF-1.PDF (January 22, 2024).PDF
5.46 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-1.PDF (January 22, 2024).PDF
909.76 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision TO 1C-135-6CL-2.PDF (January 22, 2024).PDF
752.88 KB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-1.PDF (January 22, 2024).PDF
2.73 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R(II)-1CL-2.PDF (January 22, 2024).PDF
1.41 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-1.PDF (January 22, 2024).PDF
14.98 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135(K)R-2-12-2.PDF (January 22, 2024).PDF
16.17 MB
Controlled
Jul 15, 2025
(CUI)KC-135 CCR Revision TO 1C-135-2-11-40-3.PDF (January 22, 2024).PDF
12.33 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-20-1.PDF (January 22, 2024).PDF
7.85 MB
Controlled
Jul 15, 2025
KC-135 CCR Revision TO 00-35D-54.PDF (January 22, 2024).PDF
513.48 KB
Controlled
Jul 15, 2025
(CUI) _KC-135 Program Protection Plan.pdf
964.53 KB
Controlled
Jul 15, 2025
(CUI) AFRL-STO MBSE Style Guide v0.2.pdf
1.98 MB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236989 Fuel Probes and Fuel Compensators 07 Jul 2017 Final.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) KC-135 Legacy Tanker Configuration Management Plan.pdf
821.05 KB
Controlled
Jul 15, 2025
(CUI) Legacy Tanker Systems Engineering Plan (SEP).pdf
1.58 MB
Controlled
Jul 15, 2025
AFMC Form 718 Provisioning Performance Schedule.pdf
50.84 KB
Controlled
Jul 15, 2025
AWB-130 Airworthiness Bulletin Certification Basis.pdf
233.17 KB
Controlled
Jul 15, 2025
AWB-140 Airworthiness Bulletin Compliance Report.pdf
271.27 KB
Controlled
Jul 15, 2025
AWB-150 Airworthiness Bulletin Airworthiness Risk Assessment and Acceptance.pdf
864.98 KB
Controlled
Jul 15, 2025
CKC-135 Platform ITT Charter 5 Nov-CTA-418.PDF
144.72 KB
Controlled
Jul 15, 2025
Initial Provisioning Performance Specification (IPPS).docx
72.68 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision AFMC Guidebook for Implementing MOSA in Weapon Systems 12 Sep 2022 Final.pdf
905.79 KB
Controlled
Jul 15, 2025
KC-135 CCR Revision Airworthiness Certification Criteria 29 Feb 2008 Final.pdf
5.56 MB
Controlled
Jul 15, 2025
TM-86-01R Air Force Technical Manual Contract Requirements (TMCR)_REV2_7 July 2025.pdf
560.33 KB
Controlled
Jul 15, 2025
TO 00-35D-54 USAF Deficiency Report Investigation and Resolution.pdf
762.21 KB
Controlled
Jul 15, 2025
DoD 8500.pdf
535.8 KB
Controlled
Jul 15, 2025
afi63-101_20-101.pdf
1.64 MB
Controlled
Jul 15, 2025
afi63-101_20-101_aetcsup.pdf
1.67 MB
Controlled
Jul 15, 2025
afman17-1301.pdf
1.15 MB
Controlled
Jul 15, 2025
afman17-1301_afrssup.pdf
140.33 KB
Controlled
Jul 15, 2025
(CUI) KC-135 CCR Revision - 201236986 SOURCE CONTROL DRAWING FOR FUEL PROBES AND FUEL COMPENSATORS.pdf
88.48 KB
Controlled
Jul 15, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 2.pdf
117.41 KB
Controlled
Jul 2, 2025
(CUI) Questions and Answers 2 KC-135 CCR Industry Day 2 April 2025_6.06.2025.pdf
197.81 KB
Controlled
Jun 6, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.pdf
455.59 KB
Controlled
Apr 14, 2025
(CUI) Questions and Answers KC-135 CCR Industry Day 2 April 2025.docx
1.08 MB
Controlled
Apr 14, 2025
(CUI) CKC-135 Center Console Refresh (CCR) Revision 2 - RFI 1.docx
2.93 MB
Controlled
Jan 31, 2025


Data sourced from SAM.gov. View Official Posting »