Total Small Business Set-Aside (FAR 19.5)
Notice ID:FA706024RPR01
Replacing the motor for the Chiller Plant (Building 18) will ensure cooling capabilities for twenty-six facilities across the installation. Having the cooling tower fully operational, will allow for r...
Replacing the motor for the Chiller Plant (Building 18) will ensure cooling capabilities for twenty-six facilities across the installation. Having the cooling tower fully operational, will allow for redundancies in the system. Replace the inoperable motor. Remove the old motor and install a direct replacement. The Contractor will utilize a crane to move the motors. The Contractor will set the new motor, install new belts, and align them. The Contractor will also ensure the motor is fully operational and will dispose of all old equipment. Amendment 0001 - Added Questions and Answers Document, updated PWS "Attachment 1 - B18 Cooling Tower_PWS updated Final" to reflect changes as a result of the Q&A.