Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:FA7046Q0004ss
Remove and replace carpet and cove base in hallways of Bldg. 20130, excluding the Command Staff hallway and the A-3 area. Install transition strips between the hallway carpet and each doorway. Paint B...
Remove and replace carpet and cove base in hallways of Bldg. 20130, excluding the Command Staff hallway and the A-3 area. Install transition strips between the hallway carpet and each doorway. Paint Bldg. 20130 hallways above and below the wooden chair rails, 3 stairwells, door jams, window frames (both sides of window frames on Wyoming, Gibson, and Southside Courtyard entrance inner wall of windows), and handrails, excluding the A-3 area. The hallways include breezeways in front of the A-6 CST office area, and the South breezeways on both the first and second floor. Refinish the hallway wooden chair railings. Refinish the wooden handrails and top caps in 3 stairwells.