Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:FA700022Q0078
Leader Challenge Tower was constructed from Sept 2021 – May 2022. The structure was built with the intention to add additional components to the structure over time as usage increased, group size incr...
Leader Challenge Tower was constructed from Sept 2021 – May 2022. The structure was built with the intention to add additional components to the structure over time as usage increased, group size increased, etc. Full design is complete (Architectural, Structure, Civil, and Electrical available once awarded), and installation is needed for the additional items. All construction and installation must meet Association for Challenge Course Technology (ANSI accredited) standards. (acctinfo.org)