Inactive
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Notice ID:FA700020R0004
AMENDMENT 01: 4 FEBRUARY 2020. Solicitation FA700020R0004 Amendment 0001 is attached, as is the conformed solicitation. Amendment 0001 incorporates the following four (4) documents: 1) SOW Revision 1,...
AMENDMENT 01: 4 FEBRUARY 2020. Solicitation FA700020R0004 Amendment 0001 is attached, as is the conformed solicitation. Amendment 0001 incorporates the following four (4) documents: 1) SOW Revision 1, Attachment 01, dated 3 February 2020 2) Updated Wage Determination, Attachment 06, dated 23 January 2020 3) Previously revised Experience Form, Attachment 7 (posted 14 January 2020) 4) Previously revised Financial Reference Form, Attachment 8 (posted 14 January 2020). Please acknowledge receipt of Amendment 0001 by signing the SF30 and submitting with proposal. The proposal due date has changed from 7 February 2020 to 14 February 2020 at 2:00 PM Mountain Standard Time. UPDATED DOCUMENTS: 14 JANUARY 2020. Updated versions of Attachment 06, Wage Determination, Attachment 07, Experience Form, and Attachment 08, Financial Reference, have been uploaded for use. Please ensure use of the "REVISED" versions of each document. This construction acquisition is to Repair Heating, Ventilation, and Air Conditioning (HVAC), Arnold Hall (BLDG 2302) and Harmon Hall (BLDG 2304), at the United States Air Force Academy, CO. Chilled water that is generated at Harmon Hall is supplied to Harmon Hall, Arnold Hall and Polaris Hall. Cooling towers are located on Arnold Hall roof which is piped vertically and through tunnels to Harmon Hall. Harmon Hall HVAC system consists of water cooled heat pumps which reject heat to the chilled water system via heat exchangers located in the basement of Harmon Hall. This project will replace the cooling towers located on the roof of Arnold Hall. The cooling heat exchangers at Harmon Hall will be upgraded to flat-plate type and various piping and controls will be upgraded. A temporary air cooled chiller will be utilized during cooling tower demo and replacement. Hazardous material testing was performed and results are included with project documents. General Description: A. Demolish and replace cooling towers on Arnold Hall roof, including roof and structural work, except Siemens DDC. B. Provide Siemens DDC which is required for facilitating work. C. Repair HVAC located at Arnold Hall and not on the roof. D. Repair HVAC located at Harmon Hall, including 200-ton temporary air cooled chiller. The contractor shall provide all labor, materials, transportation, equipment, and supervision necessary to accomplish this project. All work shall be accomplished in accordance with requirements contained in the Statement of Work, Drawings, Specifications, and other attachments included with this solicitation.