Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:FA700020QXXXX
10 Air Base Wing (ABW) Community Center Chapel (CCC) has a require to replace an old, outdated and inoperable Electronic Messaging Center (EMC). The location of the new EMC will be approximately 60 fe...
10 Air Base Wing (ABW) Community Center Chapel (CCC) has a require to replace an old, outdated and inoperable Electronic Messaging Center (EMC). The location of the new EMC will be approximately 60 feet north of the existing location. The vendor will be responsible for all labor/parts associated with the installation of the new EMC. However the 10ABW, Civil Engineering (CE) Squadron will be responsible for trenching the power from the existing location to the new location. This project will include new displays, pedestal and wireless network bridge. The contractor shall perform requirements analyses and conceptual designs at required location. During this process, the contractor shall collect all the information to complete a requirements analysis and conceptual design. The contractor shall survey, evaluate and provide technical advice concerning all existing infrastructures, communications, power, and environmental aspects of the site. The contractor shall provide an implementation plan, in accordance with this document, reflecting the strategy, schedule and recommendations (e.g., site architecture, topology and configuration) for the implementation. The contractor shall repair/replace/paint any damage to items/areas outside of the scope of this project. The contractor will provide professional as-builts schematice drawings and documentation detailing total system configuration and design layout. The contractor will provide no smaller than a 48” x 84” display with a minimum 140 horizontal x 70 degree viewing angle. The contractor will provide the appropriate foundation/pedestal, slightly raised, to provide for unrestricted viewing of EMC display from street level due to parking lot in viewing lane, and all necessary hardware for display. The contractor will provide wireless connectivity with cloud based software and any training required to utilize the EMC. Please see EMC Specs for full requirement.