Inactive
Notice ID:FA561322QH002
Hatzor Air Base requires the installation of an Exterior Insulation and Finish System (EIFS) for the Combined Joint Operations Center (CJOC) currently under construction. The existing facility consist...
Hatzor Air Base requires the installation of an Exterior Insulation and Finish System (EIFS) for the Combined Joint Operations Center (CJOC) currently under construction. The existing facility consists of a 700 square meter (SM), one-story concrete facility with associated site improvements. The work includes all the supporting equipment, infrastructure and accessories detailed within the drawings and specifications as required for a complete and functional system.