Inactive
Notice ID:FA560625QA038
Spangdahlem AB is looking for a dry ice production solution that is integrated into an ISO transportable Container, divided into a machine and filling room. The system must be able to operate in an ou...
Spangdahlem AB is looking for a dry ice production solution that is integrated into an ISO transportable Container, divided into a machine and filling room. The system must be able to operate in an outdoor environment and should be ready to use by supplying electrical power, liquid CO2, and compressed air as a mobile solution. It needs integrated lifting slats for easy transportation with a forklift and lift points for a crane. Further specifics are to be found in the attached COMBO document. Please note the following dates: Response deadline: 19 September 2025 14:00 CEST Questions must be submitted in writing no later than: 5 September 2025 Quotes need to be valid until: 30 September 2025