Inactive
Notice ID:FA5606-20-Q-2018
The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to... - Conduct site surveys to develop a 60%, 90%...
The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to... - Conduct site surveys to develop a 60%, 90%, and 100% Installation Design Plan (IDP) and post-installation As-Built drawing packages; - Procure required equipment/materials; (c) perform Pre-Installation Test & Checkout (PITCO); - Install equipment/material in Accordance With (IAW) the Government-approved IDP; - Perform System Operation and Verification (SOVT) USAFE test phase certification and other required deliverables (e.g. Plans of Action and Milestone (POA&M), monthly status reports etc.) for the performance locations defined in the statement of work. (SOW) Refer to "Attachment 1 Statement of Work dated 21 May 2020" for all material solicitation requirements.