AB 101 Operations (OPS) Compound T-wall Perimeter and ECP Construction
FA5422-20-Q-7089
This requirement is for the placement of a reinforced concrete T-wall perimeter topped with concertina wire for the Operations (OPS) Compound at AB101. The project also includes the installation of a ...